Skip to content
PlanIndex Get alerts
Menu

Planning application

BH2025/02997

1 Station Approach Falmer Brighton BN1 9SD

Awaiting decision Brighton and Hove Full Planning

Proposal

Enlargement of existing purpose-built student accommodation building with the erection of an additional storey and single-storey extension, with associated works.

As published by the council, reference BH2025/02997

Timeline

Dates from the published record

  1. 11 Dec 2025

    Received by Brighton and Hove

  2. 26 Feb 2026

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Brighton and Hove for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • BH2025/02973 Awaiting decision

    4 Station Approach Falmer Brighton BN1 9SD

    Application for Approval of Details reserved by Conditions 3 (materials), 8 (Travel Plan), 11 (Construction Environmental Management Plan (CEMP)), 15 (groundwater), 16 (Site Waste Management Plan), 17 (ventilation), 18 (surface water drainage) and 21 (green roofs) of application BH2025/01435.

    5 Dec 2025 32m away Conditions
  • BH2025/02144 Awaiting decision

    West Slope University Of Sussex Lewes Road Falmer Brighton BN1 9RH

    Application for approval of details reserved by condition 31 (Delivery & Service Management Plan) of application BH2023/01003.

    29 Aug 2025 163m away Conditions
  • BH2012/01290 Withdrawn

    SPORTS CENTRE BUILDING, University Way, University Of Sussex, Brighton, BN1 9RB (University of Sussex Sportcentre University Way Brighton)

    full planning

    27 Apr 2012 207m away Full applications
  • BH2017/02315 Granted

    Stanmer Court Falmer Brighton BN1 9RB

    T1 Ash crown reduce by up to 4 metres to growth points. T2 Balsam Poplar re-pollard. T4 Balsam Poplar repollard. T5 Sycamore selective prune heavy branches over road. T6 Balsam Poplar repollard. T7 Ash selective prune heavy branches over road. T8 Sycamore selective prune heavy branches over road. T9 Horse Chestnut selective prune heavy branches over road. T10 Balsam Poplar repollard. T11 Sycamore selective prune heavy branches over road. T12 Balsam Poplar repollard. T14 Balsam Poplar repollard. T15 Ash selective prune heavy branches over road. T16 Balsam Poplar repollard. T17 Sycamore selective prune heavy branches over road. T18 Balsam Poplar repollard. T19 Sycamore selective prune heavy branches over road. T20 Sycamore selective prune heavy branches over road. T21 Sycamore selective prune heavy branches over road and reduce heavy limb. T23 Sycamore reduce heavy limb. T24 Balsam Poplar repollard. T28 Sycamore remove heavy Ivy stem over grass area. T29 Balsam Poplar stem decay evident fell and grind stump to level. 6no Balsam Poplar T30 T36 reduce branch growth on upper crown to the lowest growth to the pollard point 1.2 to1.5m and clear small branch growth on trunk. T37 Sycamore fell and treat stump. T38 Leylandii prune away from electricity building. T39 Leylandii prune away from electricity building. 3no Poplar T40, T41 T42 fell. T43 Ash prune away from building. 4no Balsam Poplar T44, T45, T46, T48 reduce branch growth on upper crown to the lowest growth to the pollard. T47 Elm crown lift over footpath. T49 Sycamore crown lift over footpath.

    10 Jul 2017 207m away Trees
  • BH2012/00632 Granted

    SPORTS CENTRE BUILDING, University Way, University Of Sussex, Brighton, BN1 9RB

    Installation of 3no new windows to ground floor of North elevation.

    1 Mar 2012 207m away Full applications
  • BH2025/03116 Awaiting decision

    Land Adjacent To West Stand American Express Stadium Village Way Brighton BN1 9BL

    Application for Approval of Details reserved by Conditions 3 (Site Waste Management Plan), 4 (Construction Environmental Management Plan), 5 (Ecological Design Strategy), 7 (Tree Planting), 8 (Materials), 9 (Green Wall), 10 (Landscaping), 22 (Biodiversity Gain Plan) and 23 (Habitat Management Plan) of application BH2025/00899.

    31 Dec 2025 245m away Conditions

In Brighton and Hove

  • BH2026/00371 Awaiting decision

    27 Ladies Mile Road Brighton BN1 8QE

    Demolition of the existing front outdoor seating area and installation of a new front outdoor seating area with a powder coated aluminium frame and retractable roof.

    18 Feb 2026 Full applications
  • BH2026/00352 Awaiting decision

    34 Robertson Road Brighton BN1 5NL

    Conversion of a three-storey maisonette and lower ground-floor flat into a single dwelling house (C3). Erection of a single-storey side and rear extension.

    17 Feb 2026 Full applications
  • BH2025/03046 Granted

    35 Montpelier Crescent Brighton BN1 3JL

    Replacement of external fire escape stairs to rear and replacement rear window to match existing.

    16 Dec 2025 Full applications
  • BH2026/00339 Awaiting decision

    First Floor Flat 55 Carlisle Road Hove BN3 4FQ

    Roof alterations to include the installation of front rooflights and rear dormer.

    13 Feb 2026 Full applications
  • BH2026/00319 Awaiting decision

    98 Blatchington Road Hove BN3 3YF

    Replacement of existing shopfront and entrance door with new aluminium shopfront and entrance door.

    11 Feb 2026 Full applications