Skip to content
PlanIndex Get alerts
Menu

Planning application

71 Green Ridge Brighton BN1 5LU

Awaiting decision Brighton and Hove BH2025/02854 Householder Planning Consent

Works: Extension Loft or dormer Roofing Windows or glazing Domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of part single and part two-storey rear extensions along with a side extension; roof alterations including a roof extension, raised ridge level, front rooflights and rear dormers; revised fenestration, alterations to front bay windows and entrance door, removal of chimney, and internal alterations with associated works.

As published by the council, reference BH2025/02854

Application record

Reference
BH2025/02854
Type
Householder Planning Consent
Status
Registered
Received
24 Nov 2025
Validated
24 Nov 2025
Ward
Westdene & Hove Park
Postcode
BN1 5LU

Timeline

Dates from the published record

  1. 24 Nov 2025

    Received by Brighton and Hove

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 19 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Brighton and Hove took a median of 63 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Brighton and Hove for determination, against a statutory target of eight weeks. Over the last year Brighton and Hove decided householder applications in a median of 75 days. More in our guide to how long planning decisions take.

About householder applications

Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 56 Green Ridge Brighton BN1 5LJ

    BH2025/02853 Submitted 24 Nov 2025 47m away

    Erection of front dormer, internal alterations and associated works.

    Granted Householder Loft or dormer 11 docs
    Domestic
  • 54 Green Ridge Brighton BN1 5LJ

    BH2025/02081 Submitted 22 Aug 2025 53m away

    Erection of a roof extension, with the erection of 3no. rear dormers, a porch extension, and a single storey side extension. Incorporates fenestration alterations, the installation of front rooflights, and associated works.

    Granted Householder Extension Loft or dormer +1 16 docs
    Small domestic
  • 103 Green Ridge Brighton BN1 5LU

    BH2025/02844 Submitted 21 Nov 2025 207m away

    97% historically approved · decision due ~16 Jan

    Roof alterations and extensions including raising roof ridge height, hip to gable side extensions, front & rear dormer and associated works.

    Awaiting decision Householder Extension Loft or dormer +1 9 docs
    Domestic
  • 29 Green Ridge Brighton BN1 5LT

    BH2025/02377 Submitted 24 Sep 2025 274m away

    Application for Approval of Details reserved by Conditions 4 (Precautionary Method Statement), 5 (Ecological Design Strategy) and 6 (Biodiversity Gain Plan) of application BH2025/00716.

    Granted Conditions 14 docs
  • 29 Green Ridge Brighton BN1 5LT

    BH2025/02606 Submitted 22 Oct 2025 274m away

    100% historically approved · decision due ~17 Dec

    Application for Approval of Details reserved by Conditions 9 (surface water drainage) and 12 (materials) of application BH2025/00716.

    Awaiting decision Conditions 8 docs
  • 29 Green Ridge Brighton BN1 5LT

    BH2026/00167 Submitted 27 Jan 2026 274m away

    100% historically approved · decision due ~24 Mar

    Application for approval of details reserved by condition 15 (landscaping scheme) and 23 (photovoltaic array details) of application BH2025/00716.

    Awaiting decision Conditions 7 docs

In Brighton and Hove

  • BH2026/00404 Awaiting decision

    40 Mill Rise Brighton BN1 5GH

    Erection of single storey rear extension.

    23 Feb 2026 Householder
  • BH2026/00410 Awaiting decision

    17 Benfield Crescent Portslade BN41 2DB

    Erection of single storey rear extension.

    23 Feb 2026 Householder
  • BH2026/00399 Awaiting decision

    40 Cobton Drive Hove BN3 6WE

    Erection of proposed single storey rear/side extension.

    18 Feb 2026 Householder
  • BH2026/00344 Awaiting decision

    28 Portland Villas Hove BN3 5SB

    Erection of rear garden room with solar panels, roof alterations/extensions including a front dormer, removal of chimney stacks, installation of solar panels, changes to doors and windows, new front boundary treatment and associated external works.

    16 Feb 2026 Householder
  • BH2025/03085 Granted

    42 Hollingdean Terrace Brighton BN1 7HA

    Demolition of existing single storey structure at the rear and erection of single storey rear extension with storage area underneath and raised terrace.

    22 Dec 2025 Householder