Planning application
Brentwood Centre Doddinghurst Road Pilgrims Hatch Essex CM15 9NN
Works: Extension Demolition
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Environmental Impact Assessment screening opinion for the redevelopment of The Brentwood Centre, including partial demolition, a new extension and external material alterations of the Brentwood Centre alongside a comprehensive redevelopment of outdoor sports facilities (including associated sports infrastructure, parking and landscaping).
As published by the council, reference 26/00242/EIASO
Application record
- Reference
- 26/00242/EIASO
- Type
- EIA Screening or Scoping Opinion
- Status
- Decided
- Decision
- Not EIA Development
- Received
- 21 Apr 2026
- Validated
- 21 Apr 2026
- Decided
- 12 May 2026
- Ward
- Pilgrims Hatch
- Decision by
- Delegated Decision COND S191/S192
- Postcode
- CM15 9NN
Timeline
Dates from the published record
-
21 Apr 2026
Received by Brentwood
-
12 May 2026
Decision issued: Not EIA Development
-
9 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a planning consultancy
188 applications on PlanIndex · across 49 councils · 92% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itApplicant on file
2 applications on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
10 Elizabeth Road Pilgrims Hatch Brentwood Essex CM15 9NP
Single storey rear extension. The proposed extension would extend 3.5m beyond the rear wall of the original dwelling, the maximum height of the proposed extension would be 2.8m and the proposed eaves height would be 2.76m
Granted Prior approval Extension 8 docsSmall domestic -
Brentwood Centre Doddinghurst Road Pilgrims Hatch Essex CM15 9NN
80% historically approved · decision due ~24 Jun
Redevelopment of the Brentwood Centre, including partial demolition, a new extension and external material alterations of the Brentwood Centre alongside a comprehensive redevelopment of outdoor sports facilities (including associated sports infrastructure, parking, and landscaping)
Awaiting decision Full applications Extension Demolition 117 docs -
1 Philip Close Pilgrims Hatch Essex CM15 9NT
88% historically approved · decision due ~10 Jun
Application for Lawful Development Certificate for a proposed use or development to remove chimney, add a rear dormer, two front roof lights and extended soil and vent pipe.
Awaiting decision Lawful development Loft or dormer 13 docs -
1A Philip Close Pilgrims Hatch Essex CM15 9NT
Hip to gable roof extension, rear facing flat roof and dormer and two front roof lights
Granted Householder Extension Loft or dormer 17 docsDomestic -
28 Lavender Avenue Pilgrims Hatch Brentwood Essex CM15 9PS
Discharge of condition 4 (Additional car parking space) and 6 (Details of storage of materials) of application 18/00736/FUL (Part single part two storey front, side and rear extensions).
Granted Conditions Extension 7 docs -
3 Albany Road Pilgrims Hatch Essex CM15 9PJ
88% historically approved · decision due ~16 Sep
Application for a lawful development certificate for a proposed use or development for the construction of a single storey rear extension and x1 roof light
Decided Extension Loft or dormerSmall domestic
Other outline applications
In Brentwood
-
21/01525/OUT Granted
Entire Land East Of A128 South Of A127 Tilbury Road West Horndon Essex
The Outline Application is for the creation of a mixed-use garden community comprising up to 3,700 dwellings (including affordable housing), three care homes, five Gypsy & Traveller pitches, secondary school with Community Sports Hub (including indoor and outdoor sports facilities), up to three primary schools with early years provision, Employment Hub plus childrens nursery/creche, Village Centre with market square, community building, mobility hub, retail, office, healthcare, place of worship, gym, childrens nursery/creche, public house, betting shops and hot food take away units, two Neighbourhood Hubs with public space, retail, office and childrens nursery/creche and hot food take-away units, cricket ground with pavilion, football hub with changing/social facilities, two all modes accesses from Tilbury Road - modified junction with Station Road/Tilbury Road to create a sustainable corridor connection, pedestrian/cycle connection to the A127, residential and non-residential vehicle and cycle parking with electric charging facilities, Green and Blue Infrastructure including sustainable urban drainage, play areas (MUGAs, LEAPs and LAPs), mobility routes (e.g. footways, cycleways and trim trail), community growing space, orchard, Village Green, biodiversity enhancement and landscaping; noise barrier, primary and secondary electricity sub stations together with foul and surface water pumping stations, and demolition of existing clubhouse with associated parking area, driving range and wind turbine and diversion of overhead powerlines. Phased development, each phase being a separate and severable part of the development
-
25/01260/OUT Refused
Adj Grassmere Horseman Side Navestock Essex
Outline application for construction of a single family dwelling (appearance and Landscaping reserved matters) (Self Build)
-
26/00376/EIASO Decided
Land West Of Honeypot Lane Honeypot Lane Brentwood Essex CM14 4QX
Environmental Impact Assessment screening opinion for the development of up to 150 residential units (Use Class C3), vehicle and pedestrian access and associated infrastructure
-
26/00400/OUT Awaiting decision
Land South Of A127 East Of Childerditch Lane West Horndon Brentwood Essex CM13 3EH
Outline planning application with all matters reserved, except for means of access, comprising a range of interdependent uses to create a sustainable new settlement including community uses, a new primary school, a local centre with commercial/retail uses; flexible employment space; hotel use; mixed tenure residential development comprising up to 1,025 homes; creation of a new internal bus and active travel route; open space and public realm; new planting and landscaping, and ecological enhancement works; sustainable urban drainage systems; creation of a new vehicular access and pedestrian accesses into the site from the A127, Thorndon Avenue, and Childerditch Lane, and creation of a new vehicular, pedestrian and cycle network within the site; improvements to the existing highway and local road network; lighting; engineering works, infrastructure and associated facilities; including demolition of nos. 107 and 109 Thorndon Avenue; together with interim works or temporary structures required by the development and other associated works, including temporary meanwhile uses.
-
26/00350/OUT Awaiting decision
Land West Of Honeypot Lane Brentwood Essex
Outline application for the provision of up to 150 dwellings, including vehicular and pedestrian accesses and associated infrastructure (Appearance, Landscaping, Layout and Scale reserved matters)