Planning application
Entire Land East Of A128 South Of A127 Tilbury Road West Horndon Essex
Works: Demolition Major scheme
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
The Outline Application is for the creation of a mixed-use garden community comprising up to 3,700 dwellings (including affordable housing), three care homes, five Gypsy & Traveller pitches, secondary school with Community Sports Hub (including indoor and outdoor sports facilities), up to three primary schools with early years provision, Employment Hub plus childrens nursery/creche, Village Centre with market square, community building, mobility hub, retail, office, healthcare, place of worship, gym, childrens nursery/creche, public house, betting shops and hot food take away units, two Neighbourhood Hubs with public space, retail, office and childrens nursery/creche and hot food take-away units, cricket ground with pavilion, football hub with changing/social facilities, two all modes accesses from Tilbury Road - modified junction with Station Road/Tilbury Road to create a sustainable corridor connection, pedestrian/cycle connection to the A127, residential and non-residential vehicle and cycle parking with electric charging facilities, Green and Blue Infrastructure including sustainable urban drainage, play areas (MUGAs, LEAPs and LAPs), mobility routes (e.g. footways, cycleways and trim trail), community growing space, orchard, Village Green, biodiversity enhancement and landscaping; noise barrier, primary and secondary electricity sub stations together with foul and surface water pumping stations, and demolition of existing clubhouse with associated parking area, driving range and wind turbine and diversion of overhead powerlines. Phased development, each phase being a separate and severable part of the development
As published by the council, reference 21/01525/OUT
Application record
- Reference
- 21/01525/OUT
- Type
- Outline Application
- Status
- Approved Subject to a S106 Agreement
- Decision
- Granted As published: Approve (Subject to Section 106)
- Received
- 13 Sep 2021
- Validated
- 13 Sep 2021
- Decided
- 16 Jun 2026
- Ward
- Herongate, Ingrave And West Horndon
- Parish
- West Horndon
- Decision by
- Committee Decision
Site history
Applications at this address on the Brentwood register
This site has had 8 applications since 2021: 1 approved, 0 refused.
-
26/01016/REM Awaiting decision
Entire Land East Of A128 South Of A127 Tilbury Road West Horndon Essex
Advanced Infrastructure Works Reserved Matters Application pursuant to conditions 2 and 12 of outline planning permission 21/01525/OUT comprising: (1) detailed landscaping works, (2) access junction comprising reconfiguration of the means of access for buses, pedestrians, and cyclists, in accordance with the terms of condition 30, (3) highway infrastructure comprising mobility corridor, footways, and cycle paths, (4) drainage and utilities infrastructure.
-
26/00868/MOD106 Decided
Entire Land East Of A128 South Of A127 Tilbury Road West Horndon Essex
Confirmation of Compliance of Outline Business Plan (as per requirements of paragraph 4.1 of Schedule 13 on Governance and Stewardship) from the Section 106 Agreement dated 11.06.2026 in reference to 21/01525/OUT
-
21/01525/DHVCON/4 Awaiting decision
Entire Land East Of A128 South Of A127 Tilbury Road West Horndon Essex
Approval of Details pursuant to the requirements of pre-commencement Conditions 35 and 36 under LPA Ref: 21/01525/OUT for a Written Scheme of Investigation for Trial Trenching (within a phase) associated with the permission granted 16.06.2026
-
26/00711/REM Awaiting decision
Entire Land East Of A128 South Of A127 Tilbury Road West Horndon Essex
Reserved Matters Application for Advanced Infrastructure Works pursuant to requirements of conditions 2 and 12 of outline planning permission 21/01525/OUT comprising: (1) detailed landscaping works, (2) access junction comprising reconfiguration of the southern access roundabout, in accordance with the terms of condition 32, (3) highway infrastructure comprising spine road, footways, and cycle paths, (4) drainage and utilities infrastructure.
-
21/01525/DHVCON/3 Awaiting decision
Entire Land East Of A128 South Of A127 Tilbury Road West Horndon Essex
Approval of Details pursuant to the requirements of pre-commencement Condition 15 under LPA Ref: 21/01525/OUT for a Construction Waste Management Plan (within a phase) associated with the permission granted 16.06.2026
-
21/01525/DHVCON/2 Awaiting decision
Entire Land East Of A128 South Of A127 Tilbury Road West Horndon Essex
Approval of Details pursuant to pre-commencement requirements of Condition 9 under LPA Ref: 21/01525/OUT for the Site Wide Phasing and Implementation Plan associated with the permission granted 16.06.2026
-
21/01525/DHVCON/1 Awaiting decision
Entire Land East Of A128 South Of A127 Tilbury Road West Horndon Essex
Tree works, site clearance and habitat creation to facilitate translocation of reptiles pursuant to pre-commencement requirements of Condition 11 under LPA Ref: 21/01525/OUT pertaining to implementation of Enabling Works (within a phase) associated with the outline permission granted 16.06.2026
Timeline
Dates from the published record
-
13 Sep 2021
Received by Brentwood
-
16 Jun 2026
Decision issued: Approve (Subject to Section 106)
-
30 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
7 later applications on the register refer to this one:
-
26/01016/REM Awaiting decision
Entire Land East Of A128 South Of A127 Tilbury Road West Horndon Essex
Advanced Infrastructure Works Reserved Matters Application pursuant to conditions 2 and 12 of outline planning permission 21/01525/OUT comprising: (1) detailed landscaping works, (2) access junction comprising reconfiguration of the means of access for buses, pedestrians, and cyclists, in accordance with the terms of condition 30, (3) highway infrastructure comprising mobility corridor, footways, and cycle paths, (4) drainage and utilities infrastructure.
-
26/00868/MOD106 Decided
Entire Land East Of A128 South Of A127 Tilbury Road West Horndon Essex
Confirmation of Compliance of Outline Business Plan (as per requirements of paragraph 4.1 of Schedule 13 on Governance and Stewardship) from the Section 106 Agreement dated 11.06.2026 in reference to 21/01525/OUT
-
21/01525/DHVCON/4 Awaiting decision
Entire Land East Of A128 South Of A127 Tilbury Road West Horndon Essex
Approval of Details pursuant to the requirements of pre-commencement Conditions 35 and 36 under LPA Ref: 21/01525/OUT for a Written Scheme of Investigation for Trial Trenching (within a phase) associated with the permission granted 16.06.2026
-
26/00711/REM Awaiting decision
Entire Land East Of A128 South Of A127 Tilbury Road West Horndon Essex
Reserved Matters Application for Advanced Infrastructure Works pursuant to requirements of conditions 2 and 12 of outline planning permission 21/01525/OUT comprising: (1) detailed landscaping works, (2) access junction comprising reconfiguration of the southern access roundabout, in accordance with the terms of condition 32, (3) highway infrastructure comprising spine road, footways, and cycle paths, (4) drainage and utilities infrastructure.
-
21/01525/DHVCON/3 Awaiting decision
Entire Land East Of A128 South Of A127 Tilbury Road West Horndon Essex
Approval of Details pursuant to the requirements of pre-commencement Condition 15 under LPA Ref: 21/01525/OUT for a Construction Waste Management Plan (within a phase) associated with the permission granted 16.06.2026
-
21/01525/DHVCON/2 Awaiting decision
Entire Land East Of A128 South Of A127 Tilbury Road West Horndon Essex
Approval of Details pursuant to pre-commencement requirements of Condition 9 under LPA Ref: 21/01525/OUT for the Site Wide Phasing and Implementation Plan associated with the permission granted 16.06.2026
-
21/01525/DHVCON/1 Awaiting decision
Entire Land East Of A128 South Of A127 Tilbury Road West Horndon Essex
Tree works, site clearance and habitat creation to facilitate translocation of reptiles pursuant to pre-commencement requirements of Condition 11 under LPA Ref: 21/01525/OUT pertaining to implementation of Enabling Works (within a phase) associated with the outline permission granted 16.06.2026
Who's behind it
Company information only, from the register and Companies House
Nexus Planning Ltd Agent, a planning consultancy registered in London
Active · incorporated 2013 · London
379 applications on PlanIndex · across 73 councils · 96% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordLIH Dunton Hills Ltd Applicant, registered in London
Active · incorporated 2025 · London
3 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
268 documents on file for this application
- COVER LETTER- COMMENCEMENT
- PART 1
- PART 2
- PART 3
- PART 4
- S106
- CANGE OF APPLICANT & AGENT DETAILS
- DIANE MIDDLETON
- ISSUE SHEET 05.02.25
- 10352-HL-16P
- 10352-HL-15K
- 10352-HL-14K
- 10352-HL-13M
- 10352-HL-12L
- 10352-HL-13K STATION ROAD -A128 JUNCTION IMPROVEMENTS
- 10352-HL-14J SOUTHERN SITE ACCESS
- 10352-HL-15I FOOTWAY-CYCLEWAY
- 10352-HL-16M A127-A128 JUNCTION IMPROVEMENTS
- ISSUE SHEET 160125
- 10352-HL-12L NORTHERN SITE ACCESS.
- 10352-HL-11M SITE ACCESS
- REV K - 10352 HL 13 - STATION RD/A128 JUNCTION IMPROVEMENTS AND CENTRAL SITE A
- REV L -10352 HL 12 - NORTHERN SITE ACCESS
- REV M - 10352 HL 11 - A127/A128 JUNCTION, SITE ACCESSES AND STATION RD IMPROVEME
- REV I - 10352 HL 15 - PROPOSED FOOTWAY/CYCLEWAY AND STATION RD IMPROVEMENTS
- REV M - 10352 HL 16 - A127/A128 JUNCTION IMPROVEMENTS
- REV J - 10352 HL 14 - SOUTHEREN SITE ACCESS
- COVERING LETTER STAR PLANNING 17.07.24
- 10352-HL-16 REV N A127-A128 JUNCTION IMPROVEMENTS
- 10352-HL-15 REV J FOOTWAY-CYCLEWAY & STATION ROAD IMPROVEMENTS.
- 10352-HL-14 REV J SOUTHERN SITE ACCESS.
- 10352-HL-13 REV L STATION ROAD- A128 JUNCTION IMPROVEMENT
- 10352-HL-12 REV L NORTHERN SITE ACCESS
- 10352-HL-11 REV N SITE ACCESS AND JUNCTIONS IMPROVEMENTS
- 101 REV G SITE LOCATION PLAN
- VIABILITY REVIEW
- CONSILIDATED FINAL ES REVIEW REPORT
- REV-H)-PARAMETER PLAN ACCESS FOR APPROVAL 29112023
- DRAWING NO. 10352-HL-12F NORTHERN SITE ACCESS FOR APPROVAL 29112023.
- REV-H)-PARAMETER PLAN HEIGHTS FOR APPROVAL 29112023.
- DRAWING NO. 10352-HL-14E SOUTHERN SITE ACCESS FOR APPROVAL 29112023
- REV-H)-PARAMETER PLAN LAND USE FOR APPROVAL 29112023
- DRAWING NO. 10352-HL- 13F CENTRAL SITE ACCESS FOR APPROVAL 29112023
- CARTER JONAS VIABILITY REPORT
- REVISED FRAMEWORK MASTERPLAN PART 9
- REVISED FRAMEWORK MASTERPLAN PART 8
- REVISED FRAMEWORK MASTERPLAN PART 7
- REVISED FRAMEWORK MASTERPLAN PART 6
- REVISED FRAMEWORK MASTERPLAN PART 5
- REVISED FRAMEWORK MASTERPLAN PART 4
- REVISED FRAMEWORK MASTERPLAN PART 3
- REVISED FRAMEWORK MASTERPLAN PART 29
- REVISED FRAMEWORK MASTERPLAN PART 28
- REVISED FRAMEWORK MASTERPLAN PART 27
- REVISED FRAMEWORK MASTERPLAN PART 26
- REVISED FRAMEWORK MASTERPLAN PART 25
- REVISED FRAMEWORK MASTERPLAN PART 24
- REVISED FRAMEWORK MASTERPLAN PART 23
- REVISED FRAMEWORK MASTERPLAN PART 22
- REVISED FRAMEWORK MASTERPLAN PART 21
- REVISED FRAMEWORK MASTERPLAN PART 20
- REVISED FRAMEWORK MASTERPLAN PART 2
- REVISED FRAMEWORK MASTERPLAN PART 19
- REVISED FRAMEWORK MASTERPLAN PART 18
- REVISED FRAMEWORK MASTERPLAN PART 17
- REVISED FRAMEWORK MASTERPLAN PART 16
- REVISED FRAMEWORK MASTERPLAN PART 15
- REVISED FRAMEWORK MASTERPLAN PART 14
- REVISED FRAMEWORK MASTERPLAN PART 13
- REVISED FRAMEWORK MASTERPLAN PART 12
- REVISED FRAMEWORK MASTERPLAN PART 11
- REVISED FRAMEWORK MASTERPLAN PART 10
- REVISED FRAMEWORK MASTERPLAN PART 1
- ADDITIONAL INFORMATION
- ADDITIONAL INFORMATION NATIONAL ENGLAND
- THORNDON SSSI
- SUPLEMENTARY ENV STATEMENT - NON TECHNICAL SUMMARY
- SUPLEMENTARY ENV STATEMENT - APPENDIX 01.1
- SUPPLEMENTARY ES APPENDIX 02.1 31057-320-1-REV H
- SUPPLEMENTARY ES APPENDIX 02.1 31057-320-2-REV H
- SUPPLEMENTARY ES APPENDIX 02.1 320-4 REV H PARAMETER PLAN BUILDING HEIGHTS
- SUPPLEMENTARY ES APPENDIX 02.1 31057-400 REV H ILLUSTRATIVE MASTER PLAN
- SUPPLEMENTARY ES APPENDIX 02.2 CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN
- SUPPLEMENTARY ES APPENDIX 03.1 ZONE OF THEORETICAL VISIBILITY
- SUPPLEMENTARY ES APPENDIX 4.1 UPDATED TRAFFIC DATA
- SUPPLEMENTARY ES APPENDIX 05.1 AIR QUALITY MODEL VERIFICATION
- SUPPLEMENTARY ES APPENDIX 06.1 BASE NOISE LEVELS
- SUPPLEMENTARY ES APPENDIX 06.2 NOISE LEVELS WITH 7.5M MITIGATION
- SUPPLEMENTARY ES APPENDIX 06.3 FUTURE YEAR NOISE LEVELS WITHOUT MITIGATION
- SUPPLEMENTARY ES APPENDIX 06.4 BACKGROUND NOISE ASSESSMENT
- SUPPLEMENTARY ES APPENDIX 06.5 VIBRATION ASSESSMENT
- SUPPLEMENTARY ES APPENDIX 06.6 CRTN MODELLING RESULTS
- SUPPLEMENTARY ES APPENDIX 12.1 ARCHAEOLOGICAL DESK BASED ASSESSMENT ADDENDUM
- SUPPLEMENTARY ES APPENDIX 14.1 APPROXIMATE LOCATION OF CUMULATIVE SITES
- SUPPLEMENTARY ES AUG 20222 MAIN TEXT
- 31057-320-1-H PARAMETER PLAN 01 LAND USE
- PARAMETER PLAN 02A ACCESS AND MOVEMENT
- PARAMETER PLAN 03 BUILDING HEIGHTS
- 60416 DHGV COVERING LETTER
- 31057 400 REV H ILLUSRATIVE MASTEPLAN
- DH SUPPLEMENTARY ES APPENDIX 13.1 SOIL MANAGEMENT STRATEGY
- DHGV STAGE 2 ES REVIEW FINAL
- COVERING LETTER
- STAGE 1 ROAD SAFETY AUDIT
- STAGE 1 RESPONSE REPORT TN18
- 11D A127/A128 JUNCTION SITE ACCESSES AND STATION ROAD IMPROVEMENTS
- 10352-HL-12D NORTHERN SITE ACCESS
- 10352-HL-13D STATION ROAD/A128 JUNCTION IMPROVEMENTS AND CENTRAL SITE ACCESS
- 14A SOUTHERN SITE ACCESS
- 10352-HL-14D SOUTHERN SITE ACCESS
- 10352-HL-15D PROPOSED FOOTWAY/CYLEWAY
- 10352-HL-16D A127/A128 JUNCTION IMPROVEMENTS
- 31057 400 REV F ILLUSTRATIVE MASTERPLAN
- 31057 320-1 REV G PARAMETER PLAN 01 LAND USE
- SUPPLEMENTARY ENVIRONMENTAL STATEMENT MAIN TEXT
- SUPPLEMENTARY ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY
- COVERING LETTER
- DESIGN AND ACCESS ADDENDUM
- ILLUSTRATIVE MASTERPLAN REF 31057-400-F
- PARAMETERS PLANN ACCESS AND MOVEMENT REF 31057-320-2-G
- PARAMETERS PLAN BUILDING HEIGHTS REF 31057-320-4-G
- PARAMETERS PLAN LAND USE REF 31057-320-1-G
- SCHOOL SITE COMPLIANCE STATEMENT
- SES APPENDIX 1.1 REGULATION 25 REQUEST
- SES APPENDIX 2.1 UPDATED KEY PLANS
- SES APPENDIX 2.2 CEMP
- SES APPENDIX 3.1 ZONE OF THEORETICAL VISABILITY
- SES APPENDIX 4.1 UPDATED TRAFFIC DATA
- SES APPENDIX 6.1 BASE NOISE LEVELS
- SES APPENDIX 6.2 NOISE LEVELS WITH 7.5M MITIGATION
- SES APPENDIX 6.3 FUTURE YEAR NOISE LEVELS WITHOUT MITIGATION
- SES APPENDIX 6.4 BACKGROUND NOISE ASSESSMENT
- SES APPENDIX 6.5 VIBRATION ASSESSMENT
- SES APPENDIX 8.2 DESIGNATED SITES IMPACT ASSESSMENT
- SES APPENDIX 12.1 ARCHAEOLOGICAL DBA ADDENDUM
- SES APPENDIX 13.1 SOIL MANAGEMENT STRATEGY
- SES APPENDIX 14.1 APPROXIMATE LOCATION OF CUMULATIVE SITES
- SUPPLEMENTARY ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY
- ENVIRONMENTAL IMPACT ASSESSMENT REVIEW
- SPORT ENGLAND MODEL PLANNING CONDITIONS
- ES VOL2 APPX C1 KEY PLANS PART 1
- ES VOL2 APPX C1 KEY PLANS PART 2.1
- ES VOL2 APPX C1 KEY PLANS PART 2.2
- ES VOL2 APPX C1 KEY PLANS PART 2.3
- ES VOL2 APPX C2 WASTE MANAGEMENT STRATEGY
- ES VOL2 APPX C4 SUSTAINABILITY STATEMENT
- ES VOL2 APPX C5 ENERGY STATEMENT
- ES VOL2 APPX C6 PHASING PLAN
- ES VOL2 APPX C7 CEMP
- ES VOL2 APPX C8 LEVELS AND EARTHWORKS STRATEGY
- ES VOL2 APPX D2 LVIA SCOPING PHOTO VIEW POINT PLANS
- ES VOL2 APPX D3 LANDSCAPE CHARACTER ASSESSMENTS REVIEW
- ES VOL2 APPX D4 LCA D2 BRENTWOOD HILLS D2
- ES VOL2 APPX D7 SITE SPECIFIC LANDSCAPE VALUE INDICATORS
- ES VOL2 APPX D9 FMD EXTRACTS
- ES VOL2 APPX D10 LANDSCAPE CHARACTER ASSESSMENT TABLES
- ES VOL2 APPX D11 VISUAL ASSESSMENT TABLES
- ES VOL2 APPX D12 DSM VERIFIED STANDARD PHOTOMONTAGE NON TECHNICAL METHODOLOGY
- ES VOL2 APPX F3 MODEL VERIFICATION
- ES VOL2 APPX G1 BASE DAYTIME NOISE LEVELS
- ES VOL2 FIGURE 14 DESIGNATED SITES
- ES VOL2 FIGURE 14.2 PHASE 1 HABITAT MAP
- ES VOL2 FIGURES D1 TO D6
- ES VOL2 FIGURES D9 TO D16
- NOTICE 1
- NOTICE COVERING LETTER
- NOTICE COVERING LETTER 2
- DESIGN AND ACCESS STATEMENT PART 1
- DESIGN AND ACCESS STATEMENT PART 2
- DESIGN AND ACCESS STATEMENT PART 3
- DESIGN AND ACCESS STATEMENT PART 4
- DESIGN AND ACCESS STATEMENT PART 5
- DESIGN AND ACCESS STATEMENT PART 6
- 10352-HL-15 REV B STATION ROAD
- 10352-HL-11 REV B OVERVIEW OF HIGHWAY WORKS
- 10352-HL-16 REV B A127/A128 JUNCTION IMPROVEMENTS
- 184427/A/03 A127/B148 JUNCTION IMPROVEMENT
- 10352-HL-12 REV B NORTHERN SITE ACCESS
- 10352-HL-13 REV B IMPOVEMENTS AND CENTRAL SITE ACCESS
- 10352-HL-14 REV B SOUTHERN SITE ACCESS
- 31057-320-5 REV D EXISTING SITE PLAN
- 31057-321-1 REV B DEMOLITION PLAN
- 31057-322-REV A TOPOGRAPHIC PLAN
- 31057-400 REV A ILLUSTRATIVE MASTERPLAN
- 31057-401 REV A PHASING PLAN
- FRAMEWORK MASTERPLAN PART 1
- FRAMEWORK MASTERPLAN PART 2
- FRAMEWORK MASTERPLAN PART 3
- FRAMEWORK MASTERPLAN PART 4
- FRAMEWORK MASTERPLAN PART 5
- FRAMEWORK MASTERPLAN PART 6
- FRAMEWORK MASTERPLAN PART 7
- FRAMEWORK MASTERPLAN PART 8
- FRAMEWORK MASTERPLAN PART 9
- FRAMEWORK MASTERPLAN PART 10
- FRAMEWORK MASTERPLAN PART 11
- TRANSPORT ASSESSMENT APPENDICES A TO H
- TRANSPORT ASSESSMENT APPENDICES I TO L
- TRANSPORT ASSESSMENT MAIN TEXT
- AFFORDABLE HOUSING SCHEME
- COMMUNITY MANAGEMENT STATEMENT
- DELIVERY STATEMENT
- EMPLOYMENT STRATEGY
- ES NON TECHNICAL SUMMARY
- ENVIRONMENTAL STATEMENT VOL 1 CHAPTERS
- HERITAGE STATEMENT
- HEALTH IMPACT STATEMENT
- HILLS-19-08-21-TREE CONSTRAINTS 1 OF 9
- HILLS-19-08-21-TREE CONSTRAINTS 9 OF 9
- HILLS-19-08-21-TREE CONSTRAINTS 2 OF 9
- HILLS-19-08-21-TREE CONSTRAINTS 3 OF 9
- HILLS-19-08-21-TREE CONSTRAINTS 4 OF 9
- HILLS-19-08-21-TREE CONSTRAINTS 5 OF 9
- HILLS-19-08-21-TREE CONSTRAINTS 6 OF 9
- HILLS-19-08-21-TREE CONSTRAINTS 8 OF 9
- HILLS-19-08-21-TREE CONSTRAINTS 7 OF 9
- MOBILITY PLAN
- PLANNING APPLICATION SUMMARY DOCUMENT
- PLANNING OBLIGATION HEADS OF TERMS
- PLANNING STATEMENT
- RETAIL AND COMMERCIAL LEISURE ASSESSMENT
- SCHOOL SITE COMPLIANCE STATEMENT
- TREE SURVEY SCHEDULE
- STATEMENT OF COMMUNITY INVOLEMENT
- SERVICES SUPPLY STATEMENT
- ES VOL2 APPX B1 JULY 2018 SCOPING REQUEST REPORT
- ES VOL2 APPX B4A RE SCOPING OPINION NOV 2019 ENCL 2 LIST OF CONSULTEES
- ES VOL2 APPX B4C RE SCOPING OPINION NOV 2019 ENCL 3 CONSULTATION RESPONSES
- ES VOL2 APPX H1 HERITAGE ASSET PLAN
- ES VOL2 APPX J1 PHASE 1 DESK STUDY
- ES VOL2 APPX H2 HERITAGE STATEMENT
- ES VOL2 APPX K1 C HYDRAULIC MODELLING
- ES VOL2 APPX K1 E GROUNDWATER MAP
- ES VOL2 APPX H5 NATIONAL HERITAGE LIST DESCRIPTION
- ES VOL2 APPX G3 FUTURE YEAR NOISE LEVELS NO MITIGATION
- ES VOL2 APPX H3 ZTV
- ES VOL2 APPX K1 B APPENDICES TO FRAFRA AND DS
- ES VOL2 APPX H4 HERITAGE RECEPTORS SCOPED OUT AT BASELINE STAGE
- ES VOL2 APPX K1 D REVIEW NOTE
- ES VOL2 APPX G2 NOISE LEVELS WITH 7.5M MITIGATION
- ES VOL2 APPX K1 A FRA AND DS
- ES VOL2 APPX N2 SOIL MANAGEMENT STRATEGY
- ES VOL2 APPX 01 EIA CUMULATIVE ASSESSMENT SCOPE NOTE
- ES VOL2 FIGURE D7
- ES VOL2 APPX K2A ESSEX AND SUFFOLK WATER PRE-DEVELOPMENT CONSULTATION
- ES VOL2 APPX 13 STATUTORY SITES IMPACT ASSESSMENT
- ES VOL2 APPX M2 ARCHAEOLOGICAL GEOPHYSICAL SURVEY PART 1
- ES VOL2 APPX M2 ARCHAEOLOGICAL GEOPHYSICAL SURVEY PART 2
- ES VOL2 APPX K2 B ESSEX & SUFFOLK WATER
- ES VOL2 APPX 12 HRA SCREENING REPORT
- ES VOL2 APPX L1 BACKGROUND SOCIO ECONOMIC DATA
- ES VOL2 APPX M1 HERITAGE ARCHAEOLOGY DESK BASED ASSESSMENT
- ES VOL2 APPX N1 ALC MARCH 21
- ES VOL2 APPX F1 AIR QUALITY OBJECTIVES
- ES VOL2 FIGURE D8
- ES VOL2 APPX F2 TRAFFIC DATA
- ES VOL2 FIGURE D17 PHOTO MONTAGES PART 1
- ES VOL2 FIGURE D17 PHOTO MONTAGES PART 2
- ES VOL2 APPX D8 COMPOSITION OF VIEWS
- ES VOL2 APPX C3 LIGHTING ASSESSMENT AND STRATEGY
- ES VOL2 APPX D6 LANDSCAPE CAPACITY STUDY
- ES VOL2 APPX D5 LCA G1 HORNDON FENLAND
- 31057-101-REV F SITE LOCATION PLAN
- 31057-320-1-REV D LAND USE 01
- 31057-320-4-REV D BUILDING HEIGHTS 03
- 31057-320-2-REV D ACCESS AND MOVEMENT PLAN 02
- COVERING LETTER
- APPLICATION FORM
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Brentwood granted permission on 16 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Entire Land East Of A128 South Of A127 Tilbury Road West Horndon Essex
99% historically approved · decision due ~14 Aug
Tree works, site clearance and habitat creation to facilitate translocation of reptiles pursuant to pre-commencement requirements of Condition 11 under LPA Ref: 21/01525/OUT pertaining to implementation of Enabling Works (within a phase) associated with the outline permission granted 16.06.2026
Awaiting decision Conditions Trees 16 docs -
Entire Land East Of A128 South Of A127 Tilbury Road West Horndon Essex
99% historically approved · decision due ~18 Aug
Approval of Details pursuant to the requirements of pre-commencement Condition 15 under LPA Ref: 21/01525/OUT for a Construction Waste Management Plan (within a phase) associated with the permission granted 16.06.2026
Awaiting decision Conditions 7 docs -
Entire Land East Of A128 South Of A127 Tilbury Road West Horndon Essex
99% historically approved · decision due ~11 Sep
Approval of Details pursuant to the requirements of pre-commencement Conditions 35 and 36 under LPA Ref: 21/01525/OUT for a Written Scheme of Investigation for Trial Trenching (within a phase) associated with the permission granted 16.06.2026
Awaiting decision Conditions 4 docs -
Dunton Hills Farm Tilbury Road West Horndon Brentwood Essex CM13 3LT
Discharge of conditions 4 (Schedule of drawings for windows, doors etc) and 5 (Schedule of external finish materials including roof and wall material) of application 22/01981/HHA (Single storey rear extension).
Granted Conditions Extension Windows or glazing 5 docsSmall domestic -
Dunton Hills Farm Tilbury Road West Horndon Brentwood Essex CM13 3LT
Discharge of conditions 4 (Schedule of drawings for windows, doors etc) and 5 (Schedule of external finish materials including roof and wall material) of application 22/00181/LBC (Single storey rear extension).
Granted Conditions Extension Windows or glazing 5 docsSmall domestic
Other outline applications
In Brentwood
-
26/00769/OUT Awaiting decision
Land To Rear Of 1-6 Woodfield Cottages High Street Ingatestone CM4 0DY
Outline planning application for the erection of up to 216 dwellings and provision of up to 2,000sqm gross internal floorspace of non-residential development, comprising up to 1,500sqm of community facilities within Use Class F2 and up to 500sqm of retail floorspace within Use Class E(a), with access sought for approval and appearance, landscaping, layout and scale reserved.
-
26/00755/OUT Awaiting decision
Land At Eagle Field Ongar Road Kelvedon Hatch Essex
Outline application for the provision of up to 49 dwellings (Class C3), including vehicular access, landscaping, public open space, drainage and associated infrastructure (Appearance, Landscaping, Layout and Scale reserved matters)
-
26/00242/EIASO Decided
Brentwood Centre Doddinghurst Road Pilgrims Hatch Essex CM15 9NN
Environmental Impact Assessment screening opinion for the redevelopment of The Brentwood Centre, including partial demolition, a new extension and external material alterations of the Brentwood Centre alongside a comprehensive redevelopment of outdoor sports facilities (including associated sports infrastructure, parking and landscaping).
-
25/01260/OUT Refused
Adj Grassmere Horseman Side Navestock Essex
Outline application for construction of a single family dwelling (appearance and Landscaping reserved matters) (Self Build)
-
26/00376/EIASO Decided
Land West Of Honeypot Lane Honeypot Lane Brentwood Essex CM14 4QX
Environmental Impact Assessment screening opinion for the development of up to 150 residential units (Use Class C3), vehicle and pedestrian access and associated infrastructure