Awaiting decision Brentwood 25/01473/COND/2 Discharge of Conditions

Works: New dwelling Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Discharge of Condition 3 (Details of Materials) 4 (Details of Brickwork) 5 (Site Levels) 8 (Contamination Site Investigation) 9 (Remediation Scheme) 13 (Surface Water Drainage Scheme) 14 (Flooding Scheme) and 16 (Existing Pipes Blockage) of application 25/01473/FUL (Redevelopment of the site following prior demolition of social housing scheme and garages and development of 40, one and two bedroom apartments and community room, comprising 100% affordable housing, car park, landscaping and associated works).

As published by the council, reference 25/01473/COND/2

Application record

Reference
25/01473/COND/2
Type
Discharge of Conditions
Status
Pending Decision
Received
22 Apr 2026
Validated
22 Apr 2026
Ward
Pilgrims Hatch
Postcode
CM15 9PD

Site history

Applications at this address on the Brentwood register

This site has had 2 applications since 2026: 1 approved, 0 refused.

  • 25/01473/COND/1 Granted

    Land To The South Of Harewood Road Harewood Road Brentwood CM15 9PD

    Discharge of Condition 7 (Construction Environment Management Plan) and Condition 17 (Construction Management Plan) of application 25/01473/FUL (Redevelopment of the site following prior demolition of social housing scheme and garages and development of 40, one and two bedroom apartments and community room, comprising 100% affordable housing, car park, landscaping and associated works).

    Decided 4 Jun 2026 Conditions

Timeline

Dates from the published record

  1. 22 Apr 2026

    Received by Brentwood

  2. 23 Jul 2026

    Added to PlanIndex

  3. 19 Aug 2026

    Status changed to Pending Decision

    Previously Pending Consideration.

  4. Decision

    Awaiting decision

    Decision expected by 17 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Brentwood took a median of 76 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Pinnegar Hayward Design LLP Agent, a design practice registered in Birmingham

Active · incorporated 2009 · Birmingham

30 applications on PlanIndex · across 12 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

48 documents on file for this application

  • ENV.H SIGN OFF Consultee Comment Public · 19 Aug 2026
  • ENVIRONMENTAL HEALTH CORRESPONDENCE Consultee Comment Public · 18 Aug 2026
  • HAREWOOD ROAD CONDITIONS 14 OF 2501473FUL CONSTRUCTION PHASE SURFACE WATER MANAG Supporting Documents · 18 Aug 2026
  • ANGLIAN WATER LETTER Supporting Documents · 18 Aug 2026
  • ENVIRONMENTAL HEALTH CORRESPONDENCE Consultee Comment Public · 18 Aug 2026
  • SUDS COMMENT Supporting Documents · 12 Aug 2026
  • ECC SUDS Consultee Comment Public · 11 Aug 2026
  • 260707 12959 HAREWOOD ROAD - NETWORK Drawing · 21 Jul 2026
  • HR-GTA-ZZZ-ZZ-D-C-16001_C5 HAREWOOD ROAD PROPOSED DRAINAGE Drawing · 21 Jul 2026
  • HR-GTA-ZZZ-ZZ-D-C-16002_C1 HAREWOOD ROAD EXCEEDANCE FLOW PLAN Drawing · 21 Jul 2026
  • HR-GTA-ZZZ-ZZ-D-C-18002_C2 SITE LEVELS & CONTOURS - HAREWOOD ROAD Drawing · 21 Jul 2026
  • HAREWOOD ROAD CONDITIONS 14 OF 2501473FUL CONSTRUCTION PHASE SURFACE WATER MANAG Supporting Documents · 21 Jul 2026
  • HAREWOOD ROAD CONDITIONS 14 OF 2501473FUL CONSTRUCTION PHASE SURFACE WATER MANAG Supporting Documents · 21 Jul 2026
  • ACCEPTANCE LETTER Supporting Documents · 21 Jul 2026
  • SUDS CONSULTEE RESPONSE Consultee Comment Public · 07 Jul 2026
  • SOAKAWAY_HALF-DRAIN_TIME-960533 Supporting Documents · 01 Jul 2026
  • RESPONSE SUDS-009028 25.06.26 Supporting Documents · 01 Jul 2026
  • HR-GTA-ZZZ-ZZ-D-C-19000-C1 HAREWOOD ROAD EXTERNAL WORKS DETAILS. Supporting Documents · 01 Jul 2026
  • HR-GTA-ZZZ-ZZ-D-C-17001_C1 PRIVATE DRAINAGE DETAILS Supporting Documents · 01 Jul 2026
  • HR-GTA-ZZZ-ZZ-D-C-17000_C1 PRIVATE DRAINAGE DETAILS.PD Supporting Documents · 01 Jul 2026
  • HR-GTA-ZZZ-ZZ-D-C-17000_C1 PRIVATE DRAINAGE DETAILS Supporting Documents · 01 Jul 2026
  • HR-GTA-ZZZ-ZZ-D-C-16001_C2 HAREWOOD ROAD PROPOSED DRAINAGE Supporting Documents · 01 Jul 2026
  • HAREWOOD ROAD WATER QUALITY STATEMENT Supporting Documents · 01 Jul 2026
  • HAREWOOD ROAD CEMP & CMP (CONDITIONS 7 &17 ). Supporting Documents · 01 Jul 2026
  • APPENDIX E. Supporting Documents · 01 Jul 2026
  • 40443CCTV-01 DRAINAGE REPORT Supporting Documents · 01 Jul 2026
  • 40443BWUG-01 DRAINAGE SURVEY Supporting Documents · 01 Jul 2026
  • 260626 12959 HAREWOOD ROAD - 30YR NETWORK Supporting Documents · 01 Jul 2026
  • 260626 12959 HAREWOOD ROAD - 1YR NETWORK Supporting Documents · 01 Jul 2026
  • 260626 12959 HAREWOOD ROAD - 10YR NETWORK Supporting Documents · 01 Jul 2026
  • 260626 12959 HAREWOOD ROAD - 100YR+CC NETWORK. Supporting Documents · 01 Jul 2026
  • 22979_CCTV DRAINAGE SURVEY REPORT_SURFACE WATER Supporting Documents · 01 Jul 2026
  • P22-2649 - HAREWOOD ROAD BRENTWOOD - ISSUE 5 Supporting Documents · 10 Jun 2026
  • TB_CS_P22-2649_03LT - HAREWOOD ROAD REMEDIATION LETTER-1.0-HAREW Supporting Documents · 10 Jun 2026
  • GAS MONITORING Supporting Documents · 10 Jun 2026
  • ENVIRONMENTAL HEALTH CONSULTEE RESPONSE 2 Consultee Comment Public · 04 Jun 2026
  • ENVIRONMENTAL HEALTH CONSULTEE RESPONSE Consultee Comment Public · 21 May 2026
  • APPLICATION FORM Application Form · 22 Apr 2026
  • HR-GTA-ZZZ-ZZ-D-C-18002 ? REV T4 ? PROPOSED SITE LEVELS Drawing · 21 Apr 2026
  • SUPPLEMENTARY SITE INVESTIGATION TECHNICAL NOTE Supporting Documents · 21 Apr 2026
  • HR-GTA-ZZZ-ZZ-D-C-16010 ? REV T2 ? PROPOSED MANHOLE SCHEDULE Drawing · 21 Apr 2026
  • HR-GTA-ZZZ-ZZ-D-C-16001 ? REV T7 ? PROPOSED DRAINAGE PLAN Drawing · 21 Apr 2026
  • REMEDIATION METHOD STATEMENT Supporting Documents · 21 Apr 2026
  • GROUND INVESTIGATION REPORT Supporting Documents · 21 Apr 2026
  • DRAINAGE CONDITIONS COMPLIANCE REPORT Supporting Documents · 21 Apr 2026
  • EXTERNAL MATERIALS SCHEDULE Supporting Documents · 21 Apr 2026
  • (51) 003 ? REV D02 ? EXTERNAL WALL DETAILS Drawing · 21 Apr 2026
  • (51) 001 ? REV D04 ? TYPICAL BRISE SOLEIL DETAILS Drawing · 21 Apr 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Brentwood for determination, against a statutory target of eight weeks. Over the last year Brentwood decided condition discharge and variation applications in a median of 62 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Land To The South Of Harewood Road Harewood Road Brentwood CM15 9PD

    25/01473/COND/1 Submitted 21 Apr 2026 26m away

    Discharge of Condition 7 (Construction Environment Management Plan) and Condition 17 (Construction Management Plan) of application 25/01473/FUL (Redevelopment of the site following prior demolition of social housing scheme and garages and development of 40, one and two bedroom apartments and community room, comprising 100% affordable housing, car park, landscaping and associated works).

    Granted Conditions New dwelling Demolition 5 docs
  • 2 - 8A Harewood Road Pilgrims Hatch Essex CM15 9PD

    21/01018/BBC Submitted 4 Jun 2021 112m away

    Installation of plant to rear yard area and 2.5 metre high close boarded timber fence enclosure.

    Granted 11 docs
    Small domestic
  • 2 - 8A Harewood Road Pilgrims Hatch Essex CM15 9PD

    21/00269/BBC Submitted 17 Feb 2021 113m away

    Removal of internal partitions between existing shops to create one single shop with alterations to shop fronts, installation of a ramp to the rear elevation, raise flat roof to the rear of the store and minor alterations to include the infilling of existing openings

    Granted 12 docs
  • 2 - 8A Harewood Road Pilgrims Hatch Essex CM15 9PD

    21/01019/ADV Submitted 14 Jun 2021 116m away

    1 x Co-op Fascia sign with halo illuminated logo and non-illuminated lettering, 2 x Co-op non-illuminated fascia signs, 1 x Post Office non-illuminated projecting sign, 1 x Post Office non-illuminated Service Menu Board and 2 x Co-op logo externally illuminated (trough light) projecting signs.

    Granted Advertising 6 docs
  • 4 Balmoral Road Pilgrims Hatch Essex CM15 9PN

    26/00149/HHA Submitted 23 Mar 2026 137m away

    Side and rear single-storey extension

    Granted Extension 5 docs
    Small domestic
  • 3 Albany Road Pilgrims Hatch Essex CM15 9PJ

    26/00695/S192 Submitted 22 Jul 2026 138m away

    Application for a lawful development certificate for a proposed use or development for the construction of a single storey rear extension and x1 roof light

    Refused Extension Loft or dormer
    Small domestic

In Brentwood

  • 26/00365/COND/9 Granted

    Land North Of Shenfield Alexander Lane Shenfield Essex

    Discharge of condition 18 (roofing materials) of application 26/00365/FUL (Variation of condition 2 (approved drawings), removal of condition 41 (Location of bus stop provided prior to occupation in phase 2) and removal of condition 42 (Bus stop to be provided prior to occupation in phase 2) of permission 23/01164/FUL / APP/H1515/W/24/3353271 (Hybrid planning application for 344 units including 35% affordable housing, safeguarded land for a 2FE primary school and early years facility, public open space and associated landscaping, drainage and highways infrastructure.)

    27 Apr 2026 Conditions
  • Land North Of Shenfield Alexander Lane Shenfield Essex

    Discharge of condition 17 (details of cladding) of application 26/00365/FUL (Variation of condition 2 (approved drawings), removal of condition 41 (Location of bus stop provided prior to occupation in phase 2) and removal of condition 42 (Bus stop to be provided prior to occupation in phase 2) of permission 23/01164/FUL / APP/H1515/W/24/3353271 (Hybrid planning application for 344 units including 35% affordable housing, safeguarded land for a 2FE primary school and early years facility, public open space and associated landscaping, drainage and highways infrastructure.)

    27 Apr 2026 Conditions
  • 25/01424/COND/1 Granted

    10 Newmans Drive Hutton Essex CM13 2PZ

    Application for Discharge of Condition 4 (tree protection plan) of original application 25/01424/HHA (Increase in ridge height of roof to create first floor to include two dormer windows to front elevation, double storey rear extension with roof windows to side elevations and pitched roof entrance porch to front elevation.)

    12 May 2026 Conditions
  • 25/00326/COND/1 Granted

    Frenches Farm Wigley Bush Lane Brentwood CM14 5QP

    Discharge of Condition 12 (Noise Mitigation Scheme) and 17 (Landscaping Scheme) of application 25/00326/FUL (Variation of Condition 1 (In Accordance with Drawings) of application 22/00502/TECON (Application for Technical Details Consent for the construction of 8 dwellings following Permission in Principle (21/00413/PIP).) to allow for the relocation of plot 1 and larger garden area, and alterations to the fenestration on plots 6, 7 and 8).

    15 May 2026 Conditions
  • 22/01205/COND/4 Granted

    Cheale Meats Ltd Orchard Farm Little Warley Hall Lane West Horndon Little Warley Essex CM13 3EN

    Discharge of Condition 3 (Contamination Assessment) and 4 (Remediation Scheme) of application 22/01205/FUL (Construction of meat processing building (Use Class B2), one HGV maintenance building (Use Class B2) and one food storage building (Use Class B8) with roof mounted solar PV panels, new access and staff parking, enhanced landscaping, sustainable drainage and a combined heat and power plant).

    1 Apr 2026 Conditions