Battery Energy Storage East Of Wash Road Wash Road Hutton Essex

Granted Brentwood 20/01800/COND/1 Discharge of Conditions

Relates to 20/01800/FUL

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Discharge of conditions 4 (Construction Method Statement), 5 (Scheme of hard and soft landscaping), 6 (Detailed surface water drainage scheme), 7 (Scheme to minimise the risk of offsite flooding), 8 (Detailed maintenance plan), and 11 (Details of the security systems) of application 20/01800/FUL (Installation of a 49.9MW battery energy storage system and associated infrastructure).

As published by the council, reference 20/01800/COND/1

Application record

Reference
20/01800/COND/1
Type
Discharge of Conditions
Status
Approved
Decision
Granted As published: Application Permitted
Received
1 Nov 2021
Validated
1 Nov 2021
Decided
11 Feb 2022
Ward
Ingatestone, Fryerning And Mountnessing
Parish
Mountnessing
Decision by
Delegated Decisions

Site history

Applications at this address on the Brentwood register

This site has had 5 applications since 2020: 5 approved, 0 refused.

  • 20/01800/NON/2 Granted

    Battery Energy Storage East Of Wash Road Wash Road Hutton Essex

    Non material amendment to application 20/01800/FUL (Installation of a 49.9MW battery energy storage system and associated infrastructure) to allow for an amendment to the layout of the of the customer substation orientation and fence line amendment.

    Decided 17 Jun 2022 Amendments
  • 20/01800/COND/2 Granted

    Battery Energy Storage East Of Wash Road Wash Road Hutton Essex

    Discharge of condition 5 (Landscaping Scheme) of application 20/01800/FUL (Installation of a 49.9MW battery energy storage system and associated infrastructure)

    Decided 17 Jun 2022 Conditions
  • 20/01800/NON/1 Granted

    Battery Energy Storage East Of Wash Road Wash Road Hutton Essex

    Non material amendment to application 20/01800/FUL (Installation of a 49.9MW battery energy storage system and associated infrastructure) to allow for an amendment to the number of Energy Storage System Units from 28 to 15 and reduction of transformers on site from 28 to 11 and alterations to colour from green to white/grey.

    Decided 13 May 2022 Amendments
  • 20/01800/FUL Granted

    Battery Energy Storage East Of Wash Road Wash Road Hutton Essex

    Installation of a 49.9MW battery energy storage system and associated infrastructure

    Decided 2 Sep 2021 Full applications

Timeline

Dates from the published record

  1. 1 Nov 2021

    Received by Brentwood

  2. 11 Feb 2022

    Decision issued: Application Permitted

  3. 21 Nov 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 20/01800/FUL Granted

    Battery Energy Storage East Of Wash Road Wash Road Hutton Essex

    Installation of a 49.9MW battery energy storage system and associated infrastructure

    Decided 2 Sep 2021 Full applications

Documents

12 documents on file for this application

A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you every new job in your area each morning. 14 days free.

What this grant of permission means

Brentwood granted permission on 11 February 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Battery Energy Storage East Of Wash Road Wash Road Hutton Essex

    20/01800/FUL Submitted 15 Dec 2020 50 yards away

    Installation of a 49.9MW battery energy storage system and associated infrastructure

    Granted Full applications Drawings (5) 24 docs
  • Battery Energy Storage East Of Wash Road Wash Road Mountnessing Essex CM13 1DL

    20/01800/NON/3 Submitted 12 Sep 2022 50 yards away

    Non material amendment to application 20/01800/FUL (Installation of a 49.9MW battery energy storage system and associated infrastructure) for the amendment to the landscaping plan and an amendment to the CTMP.

    Granted Amendments 8 docs
  • Battery Energy Storage East Of Wash Road Wash Road Hutton Essex

    20/01800/NON/2 Submitted 17 May 2022 50 yards away

    Non material amendment to application 20/01800/FUL (Installation of a 49.9MW battery energy storage system and associated infrastructure) to allow for an amendment to the layout of the of the customer substation orientation and fence line amendment.

    Granted Amendments 4 docs
    Small domestic
  • Battery Energy Storage East Of Wash Road Wash Road Hutton Essex

    20/01800/NON/1 Submitted 14 Feb 2022 50 yards away

    Non material amendment to application 20/01800/FUL (Installation of a 49.9MW battery energy storage system and associated infrastructure) to allow for an amendment to the number of Energy Storage System Units from 28 to 15 and reduction of transformers on site from 28 to 11 and alterations to colour from green to white/grey.

    Granted Amendments 16 docs
  • Battery Energy Storage East Of Wash Road Wash Road Hutton Essex

    20/01800/COND/2 Submitted 5 May 2022 100 yards away

    Discharge of condition 5 (Landscaping Scheme) of application 20/01800/FUL (Installation of a 49.9MW battery energy storage system and associated infrastructure)

    Granted Conditions 5 docs
  • Hutton Country Park Wash Road Hutton Essex

    20/01846/EIASO Submitted 4 Dec 2020 150 yards away

    Installation of a 49.9MW battery energy storage system and associated infrastructure

    Decided Outline 2 docs

In Brentwood

  • 25/00666/COND/4 Awaiting decision

    Alexander House Alexander Lane Shenfield Essex CM15 8QE

    Discharge of Condition 7 (Details Of External Materials) and 8 (Brick Sample Panel) of application 25/00666/FUL (New residential development comprising the demolition of the existing house known as Alexander house. Proposed construction of 8 no. new dwellings and the conversion of an existing building to form 1 no. single storey dwelling together with associated access improvements onto Alexander Lane, extension of pedestrian footpath to Alexander Lane frontage, car parking, garden space, landscaping and associated development).

    20 Oct 2026 Conditions
  • 23/01422/COND/1 Awaiting decision

    4 Junction Road Warley Essex CM14 5JN

    Discharge of Condition 3 (Soft Landscaping) of application 23/01422/FUL (Construct 1.8m high fencing to side boundary and front garden enclosing land as additional garden area, construct single storey side/rear extension with alterations to fenestration including insertion of rooflight).

    14 Oct 2026 Conditions
  • 26/00578/COND/1 Awaiting decision

    Anglo European School Willow Green Ingatestone Essex CM4 0DJ

    Discharge of Condition 12 (School Travel Plan) of application 26/00578/FUL (Variation of Condition number 2 (Approved Plans), 10 (Construction Method Statement), 18 (Removal of Temporary Classrooms) and 26 (Energy and Sustainability Statement) of original application 25/00952/FUL (Demolition of 5 existing buildings. Re-development of existing school site and construction of new 3 storey school building and canopy structure including new car parking area, amphitheatre, MUGA's, soft and hard landscaping and associated infrastructure) to allow for amendments to the energy strategy and the Portakabin route to the site)

    13 Oct 2026 Conditions
  • Land Off Chelmsford Road Shenfield

    Discharge of Condition 7 (Bus Stop Upgrades) of application 22/01324/FUL (Construction of 191 dwellings (Class C3), public open space, landscaping, sustainable urban drainage, access and associated infrastructure).

    Received 17 Jul, published by the council 8 Aug 2026 Conditions
  • 20/01566/COND/5 Granted

    Aquilla Row Clive Road Great Warley Essex

    Discharge of Condition 11 (Further Details) of application 20/01566/FUL (13 no. dwellings on west side of car park and demolition of existing canteen building to provide new landscaped amenity area and compensatory car parking).