Planning application
151 Wembley Park Drive, Wembley, HA9 8HQ
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Demolition of the existing building and redevelopment of the site to provide a ground plus 14 storey hotel building (Class C1) and a ground plus 29 storey purpose-built student accommodation building (Sui Generis), with public realm and associated hard and soft landscaping, servicing, cycle store, plant and other back of house space including all necessary enabling works.
As published by the council, reference 26/1409
Application record
- Reference
- 26/1409
- Type
- Full Planning Permission
- Status
- Registered
- Received
- 5 Jun 2026
- Validated
- 18 Jun 2026
- Ward
- Preston
- Decision by
- Planning Committee
- Postcode
- HA9 8HQ
Site history
Applications at this address on the Brent register
This site has had 3 applications since 2019: 1 approved, 0 refused.
-
24/0026/TELN Decided
151 Wembley Park Drive, Wembley, HA9 8HQ
Notification under the electronic communications code regulations 2003 (as amended) to utilise permitted development rights, as defined in part 16 of schedule 2 of the town and country planning (general permitted development) (England) order 2015 (as amended 2022) for the installation of 6no. antenna apertures and 4no. 600mm diameter transmission dishes along with 4no. equipment cabinets at roof level and ancillary development thereto.
-
19/4260 Granted
151 Wembley Park Drive, Wembley, HA9 8HQ
Installation of signage, a high surveillance camera system and parking payment kiosk within the grounds of the hotel.
Timeline
Dates from the published record
-
5 Jun 2026
Received by Brent
-
18 Jun 2026
Validated
Checked as complete and ready for consideration.
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 13 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Brent took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
DP9 Ltd Agent
Active · incorporated 2004
2,658 applications on PlanIndex · across 36 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
154 documents on file for this application
- Fra
- Ea
- List - consulted on application
- List - consulted
- River and canal trust comments
- Brents site notice 22/06/2026
- Site notice
- Brents site notice 22/06/2026
- Site notice
- Brents site notice 22/06/2026
- Site notice
- Hotel gia
- Pbsa gia
- Proposed os site plan
- Existing site plan
- Demolition plan
- Existing east-west site elevation
- Proposed east-west site elevation
- Ground floor plan
- First floor plan
- Level 2 floor plan
- Level 14 floor plan
- Level 28th floor plan
- Level 29 floor plan
- Roof plan
- Level 17-25 - typical upper floor plan
- Level 26-27 floor plan
- Section a-a
- Section b-b
- Section c-c
- Section d-d
- East elevation through podium
- West elevation through podium
- North elevation
- South elevation
- Proposed east-west site elevation
- Existing os site plan
- Bay study hotel, plant screen corner type a
- Bay study hotel, plant screen corner type b
- Hotel roof plan
- Hotel schedule of accommodation
- Level 2-13 hotel typical floor plan
- Hotel room types
- Hotel room types
- Bay study hotel, typical bay
- Bay study, hotel corner bay
- Bay study pbsa, pavilion facade
- Hotel ground floor plan
- Bay study hotel, main entrance
- Bay study hotel, restaurant
- Hotel first floor plan
- Hotel roof access plan
- Pbsa floor plan (26th-27th)
- Pbsa room types
- Pbsa room types
- Bay study pbsa, typical bay, lower levels
- Bay study pbsa, kitchen lower levels
- Bay study pbsa, typical bay, upper elevels
- Bay study pbsa, kitchen upper levels
- Pbsa 28th floor plan
- Pbsaroof access & plant (29th floor plan)
- Bay study, pbsa plant screen typical bay
- Bay study pbsa, plan screen corner north
- Bay study pbsa, plant screen corner east
- Pbsa roof plan
- Pbsa accommodation & area schedule
- Schedule of accommodation - pbsa (sheet 1)
- Schedule of accommodation - pbsa (sheet 2)
- Pbsa typical floor plan (3rd - 14th)
- Pbsa floor plan (15th-16th)
- Pbsa typical upper floor plan (17th-25th)
- Hotel accommodation & area schedule
- Pbsa ground floor plan
- Bay study pbsa, entrance
- Bay study pbsa, bay windows
- Pbsa first floor plan
- Pbsa second floor plan
- East elevation
- West elevation
- Proposed north-south site elevation
- Level 3-13 typical floor plan
- Arboricultural impact assessment
- Archaeological desk-based assessment
- Biodiversity net gain design stage assessment
- Circular economy statement part 1
- Circular economy statement part 2
- Daylight & sunlight report part 1
- Daylight & sunlight report - part 2
- Socio-economic statement
- Energy statement
- Proposed sustainable drainage layout
- Surface water drainage strategy appendix
- Surface water drainage strategy
- Foul sewage assessment
- Health impact assessment
- Combined roof level general arrangement
- Upper roof level hardowrks plan
- Upper roof level softworks plan
- Level 01 hardworks plan
- Level 01 softworks plan
- Level 02 hardworks plan
- Level 02 softworks plan
- Ground floor general arrangement
- Site boundaries
- Ground floor hardworks plan
- Ground floor softworks plan
- Tree retention & removal
- Tree planting plan
- Cumulative tree canopy area
- External levels
- Urban greening factor
- Noise impact assessment
- Overheating strategy & breeam thermal comfort assessment
- Statement of community involvement
- Sustainable design statement
- Telecommunications impact assessment & baseline signal survey
- Topographical survey
- Outline construction logistics plan
- Delivery & servicing management plan
- Transport assessment part 1
- Transport assessment part 2
- Transport assessment part 3
- Travel plan
- Operational waste management plan
- Ventilation strategy report
- Wind microclimate assessment
- Whole life carbon assessment
- Level 15-16 floor plan
- Heritage, townscape & visual impact assessments - part 1
- Heritage, townscape & visual impact assessments - part 2
- Heritage, townscape & visual impact assessments - part 3
- Heritage, townscape & visual impact assessments - part 4
- Heritage, townscape & visual impact assessments - part 5
- Preliminary geotechnical appraisal report part 1
- Preliminary geotechnical appraisal report part 2
- Preliminary geotechnical appraisal report part 3
- Preliminary geotechnical appraisal report part 4
- Preliminary geotechnical appraisal report part 4
- Preliminary geotechnical appraisal report part 6
- Fire strategy statement
- Design & access statement - part 1
- Design & access statement - part 2
- Design & access statement - part 3
- Design & access statement - part 4
- Design & access statement - part 5
- Design & access statement - part 6
- Design & access statement - part 7
- Design & access statement - part 8
- Design & access statement - part 9
- Student accommodation management plan
- Covering letter
- Financial viability assessment
- Planning statement
- Application form redacted
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Brent for determination, against a statutory target of eight weeks. Over the last year Brent decided full applications in a median of 70 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Flat 1, 133 Wembley Park Drive, Wembley, HA9 8HQ
Raising height of roof and rear dormer roof extension to convert loft and conversion of upper floors into 2 self-contained flats (DEPARTURE FROM POLICY DMP19 OF BRENT'S LOCAL PLAN)
Granted Full applications New dwelling Extension +1 9 docs -
151 Wembley Park Drive, Wembley, HA9 8HQ
Installation of signage, a high surveillance camera system and parking payment kiosk within the grounds of the hotel.
Granted Full applications 6 docs -
151 Wembley Park Drive, Wembley, HA9 8HQ
Notification under the electronic communications code regulations 2003 (as amended) to utilise permitted development rights, as defined in part 16 of schedule 2 of the town and country planning (general permitted development) (England) order 2015 (as amended 2022) for the installation of 6no. antenna apertures and 4no. 600mm diameter transmission dishes along with 4no. equipment cabinets at roof level and ancillary development thereto.
Decided -
Kingdom House, 1 Kingswood Road, Wembley, HA9 8JR
Variation of condition 2, development built in accordance with approved drawings (first floor rear extension and internal alterations) of Full Planning Permission reference 25/1455 dated 23 July, 2025, for Proposed first-floor extension to existing office and storage building
Granted Amendments Extension 4 docs -
5 Kingswood Road, Wembley, HA9 8JR
Details pursuant to condition 20 (construction logistics plan) of Full Planning Permission reference 20/2287 dated 17 June, 2021, for Demolition of warehouse building and erection of a four storey building comprising flats with roof top amenity space and ground floor commercial unit, provision for bicycle and refuse storage and associated landscaping, subject to Deed of Agreement dated 21st April 2021 under Section 106 of Town and Country Planning Act 1990, as amended.
Granted Conditions New dwelling Demolition 5 docs -
5 Kingswood Road, Wembley, HA9 8JR
Details pursuant to condition 12 (demolition and construction management statement) of Full Planning Permission reference 20/2287 dated 17 June, 2021, for Demolition of warehouse building and erection of a four storey building comprising flats with roof top amenity space and ground floor commercial unit, provision for bicycle and refuse storage and associated landscaping, subject to Deed of Agreement dated 21st April 2021 under Section 106 of Town and Country Planning Act 1990, as amended.
Granted Conditions New dwelling Demolition 6 docs
Other full applications
In Brent
-
26/0302 Granted
2 Wembley Park Boulevard, Wembley, HA9 0HP
Proposed outdoor seating area with planters, balustrade and jumbrellas to restaurant
-
26/0225 Granted
Brent NHS Primary Care Trust, Wembley Centre For Health & Care, 116 Chaplin Road, Wembley, HA0 4UZ
Phased development including the demolition of existing buildings and erection of buildings comprising residential units (Use Class C3) and car parking spaces together with associated public realm, landscaping and highway improvements, cycle parking and stores, and all other associated and ancillary works. Subject to a Legal Agreement made under Section 106 of the Town and Country Planning Act 1990 (as amended) dated the 16 September 2026.
-
26/1430 Granted
64 Larch Road, London, NW2 6SE
Proposed retention of 6-bedroom 6-person house of multiple occupation (HMO)
-
26/2294 Awaiting decision
101B Wakeman Road, London, NW10 5BH
Proposed rear dormer extension and loft conversion into habitable space, dormer extension to roof of rear outrigger, installation of rear terrace with privacy screen and railing, installation of 3x front rooflights and replacement of side and rear windows to first-floor flat
-
26/2266 Awaiting decision
233 Watford Road, Harrow, HA1 3TU
Erection of single-storey side extension, installation of canopies to front and side, change of use of the front part of the premises to a hand car wash, and addition of signage to front of MOT Centre