Skip to content
PlanIndex Get alerts
Menu

Planning application

13-15 Walm Lane, London, NW2 5SJ

Awaiting decision Brent 26/1338 Full Planning Permission

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed installation of extraction flue, associated screening, 5x AC units and 1x air handling unit to rear of premises

As published by the council, reference 26/1338

Application record

Reference
26/1338
Type
Full Planning Permission
Status
Registered
Received
28 May 2026
Validated
28 May 2026
Ward
Willesden Green
Decision by
Delegated Team Manager
Postcode
NW2 5SJ

Site history

Applications at this address on the Brent register

This site has had 3 applications since 2024: 0 approved, 1 refused.

  • 25/2877 Awaiting decision

    13-15 Walm Lane, London, NW2 5SJ

    Reduction of height of extractor unit to rear of building, erection of non-combustible screening around the plant, removal of x4 redundant air handling units and relocation of x2 air handling units to rear elevation to restaurant

    Submitted 10 Oct 2025 Full applications
  • 24/2217 Refused

    13-15 Walm Lane, London, NW2 5SJ

    Reduction of height of extractor unit to rear of building, erection of screening around plant and removal of redundant air handling units on roof

    Decided 31 Oct 2024 Full applications

Timeline

Dates from the published record

  1. 28 May 2026

    Received by Brent

  2. 25 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 23 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Brent took a median of 56 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Belgravia Design & Build Ltd Agent, a design practice registered in London

Active · incorporated 2019 · London

48 applications on PlanIndex · across 7 councils · 97% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

27 documents on file for this application

  • Brents site notice 16/06/2026 Original Submission · 16 Jun 2026
  • Brents site notice 16/06/2026 Original Submission · 16 Jun 2026
  • Site notice Consultation · 16 Jun 2026
  • Site notice Consultation · 16 Jun 2026
  • List - consulted on application Consultation · 03 Jun 2026
  • List - consulted Consultation · 03 Jun 2026
  • Calculations and equipment data sheets Supporting Documents · 29 May 2026
  • Odour assessment Supporting Documents · 29 May 2026
  • Fire strategy report Supporting Documents · 29 May 2026
  • Pre-existing rear elevation a & section a-a Submitted Drawings Plans · 29 May 2026
  • Pre-existing side elevation b & section c-c Submitted Drawings Plans · 29 May 2026
  • Existing rear elevation a & side elevation b Submitted Drawings Plans · 29 May 2026
  • Proposed rear elevation a & section a-a Submitted Drawings Plans · 29 May 2026
  • Proposed side elevation b & section b-b Submitted Drawings Plans · 29 May 2026
  • Pre-existing first floor plan Submitted Drawings Plans · 29 May 2026
  • Existing first floor plan Submitted Drawings Plans · 29 May 2026
  • Proposed first floor plan Submitted Drawings Plans · 29 May 2026
  • Proposed fire strategy plan Submitted Drawings Plans · 29 May 2026
  • Proposed side section c-c Submitted Drawings Plans · 29 May 2026
  • Existing site location plans Submitted Drawings Plans · 29 May 2026
  • Proposed site location plans Submitted Drawings Plans · 29 May 2026
  • Pre-existing site location plans Submitted Drawings Plans · 29 May 2026
  • Planning and heritage statement Supporting Documents · 29 May 2026
  • Kitchen ventilation engineer drawings 1 Supporting Documents · 29 May 2026
  • Kitchen ventilation engineer drawings 2 Supporting Documents · 29 May 2026
  • Plant noise assessment Supporting Documents · 29 May 2026
  • Application form Application Form (Public) · 29 May 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Brent for determination, against a statutory target of eight weeks. Over the last year Brent decided full applications in a median of 70 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 13-15 Walm Lane, London, NW2 5SJ

    25/2877 Submitted 10 Oct 2025 50 yards away

    71% historically approved · decision due ~5 Dec

    Reduction of height of extractor unit to rear of building, erection of non-combustible screening around the plant, removal of x4 redundant air handling units and relocation of x2 air handling units to rear elevation to restaurant

    Awaiting decision Full applications 22 docs
  • 13-15 Walm Lane, London, NW2 5SJ

    24/2217 Submitted 8 Aug 2024 50 yards away

    Reduction of height of extractor unit to rear of building, erection of screening around plant and removal of redundant air handling units on roof

    Refused Full applications 18 docs
  • 9 Walm Lane, London, NW2 5SJ

    26/0734 Submitted 23 Mar 2026 50 yards away

    2 No Sycamores to rear courtyard: Pollard back to previous points

    Granted Trees 2 docs
  • 23 Dean Road, London, NW2 5AB

    20/4131 Submitted 15 Dec 2020 50 yards away

    Proposed single storey side and rear extension with two rooflights and installation of new window to side elevation of ground floor flat.

    Granted Full applications Extension Loft or dormer +1 3 docs
    Small domestic
  • 17A Dean Road, London, NW2 5AB

    20/2645 Submitted 26 Aug 2020 50 yards away

    Proposed second floor front extension with roof alterations to first and second floor maisonette

    Granted Full applications Extension Roofing 7 docs
  • 19 Dean Road, London, NW2 5AB

    25/2492 Submitted 1 Sep 2025 50 yards away

    Proposed conversion of dwelling into a 7 bedroom 7 person house in multiple occupation (HMO), refuse storage to front and cycle storage to rear

    Granted Full applications 14 docs
    Domestic

In Brent

  • 26/0302 Granted

    2 Wembley Park Boulevard, Wembley, HA9 0HP

    Proposed outdoor seating area with planters, balustrade and jumbrellas to restaurant

    Received 9 Feb, published by the council 25 Jul 2026 Full applications
  • 26/0225 Granted

    Brent NHS Primary Care Trust, Wembley Centre For Health & Care, 116 Chaplin Road, Wembley, HA0 4UZ

    Phased development including the demolition of existing buildings and erection of buildings comprising residential units (Use Class C3) and car parking spaces together with associated public realm, landscaping and highway improvements, cycle parking and stores, and all other associated and ancillary works. Subject to a Legal Agreement made under Section 106 of the Town and Country Planning Act 1990 (as amended) dated the 16 September 2026.

    Received 30 Jan, published by the council 25 Jul 2026 Full applications
  • 26/1430 Granted

    64 Larch Road, London, NW2 6SE

    Proposed retention of 6-bedroom 6-person house of multiple occupation (HMO)

    Received 9 Jun, published by the council 25 Jul 2026 Full applications
  • 26/2294 Awaiting decision

    101B Wakeman Road, London, NW10 5BH

    Proposed rear dormer extension and loft conversion into habitable space, dormer extension to roof of rear outrigger, installation of rear terrace with privacy screen and railing, installation of 3x front rooflights and replacement of side and rear windows to first-floor flat

    Received 9 Sep, published by the council 21 Sep 2026 Full applications
  • 26/2288 Awaiting decision

    36 Windsor Road, London, NW2 5DS

    Change of use from dwellinghouse to residential care home for up to 3 children receiving care (Use Class C2) (amended)

    Received 9 Sep, published by the council 21 Sep 2026 Full applications