Planning application
Land adjacent to Holiday Inn, Empire Way, Wembley
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Clearance of site and construction of an interconnected building ranging from 8 to 25 storeys in height to provide a Care Home (Class C2) and Co-Living Accommodation (Sui Generis), together with associated car and cycle parking (including within existing basement), hard and soft landscaping and communal amenity spaces
As published by the council, reference 26/0967
Application record
- Reference
- 26/0967
- Type
- Full Planning Permission
- Status
- Registered
- Received
- 17 Apr 2026
- Validated
- 17 Apr 2026
- Ward
- Wembley Park
- Decision by
- Delegated Team Manager
Timeline
Dates from the published record
-
17 Apr 2026
Received by Brent
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 12 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Brent took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
CarneySweeney Planning Agent, a planning consultancy
93 applications on PlanIndex · across 8 councils · 99% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordSplendid Hospitality Group Applicant, registered in Watford
Active · incorporated 2007 · Watford
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
109 documents on file for this application
- Daylight & sunlight report
- Bsr
- Env health
- Env health noise team
- Historic england
- List - consulted on application
- List - consulted
- Asqs supporting evidence
- Bng metric
- Archaeological desk based assessment
- Air quality assessment
- Wind microclimate
- Internal daylight, sunlight and overshadowing report
- Access statement
- Phase i desk study part 2
- Phase i desk study part 1
- Daylight and sunlight report: appendices part 6
- Daylight and sunlight report: appendices part 1
- Daylight and sunlight report: appendices part 2
- Daylight and sunlight report: appendices part 3
- Daylight and sunlight report: appendices part 4
- Daylight and sunlight report: appendices part 5
- Ecology and bng design report
- Financial viability assessment part 1
- Financial viability assessment part 2
- Financial viability assessment part 3
- Heritage, townscape and visual impact assessment
- Gateway one fire statement
- London plan fire statement
- Flood risk assessment and drainage strategy
- Co-living needs assessment
- Telecommunications impact assessment and baseline signal survey
- Care needs assessment
- Arboricultural impact assessment
- Wembley operational care management plan
- Co-living operational management plan
- Foul sewerage and utilities assessment part 3
- Foul sewerage and utilities assessment part 4
- Foul sewerage and utilities assessment part 1
- Foul sewerage and utilities assessment part 2
- Whole life carbon & circular economy
- Digital connectivity infrastructure plan
- Site location plan
- Proposed site block plan
- Proposed ground floor plan
- Existing ground floor plan
- Demolition ground floor plan
- Proposed level 1 floor plan
- Proposed level 2 floor plan (02 ? 06)
- Proposed level 7 floor plan amenity
- Proposed level 8 floor plan
- Proposed level 9 floor plan (09 ? 15)
- Proposed level 16 floor plan (amenity)
- Proposed level 17 floor plan (17 ? 23)
- Proposed level 24 floor plan (amenity)
- Proposed roof level plan
- Proposed roof plant level plan
- Proposed basement level plan
- Existing basement level plan
- Demolition basement level plan
- Proposed elevation north (royal route)
- Proposed elevation east
- Proposed elevation south (leafy lane)
- Proposed elevation west (wembley hill road)
- Proposed section a site north-south
- Proposed section b east-west
- Proposed section c east-west
- Existing elevation north (royal route)
- Existing elevation east
- Existing elevation south
- Existing elevation west (wembley hill road)
- Existing sections site north-south
- Existing sections site east-west
- Proposed typical unit type plans (co-living)
- Proposed accessible room layouts (co-living)
- Proposed typical unit type plans (care home)
- Delivery and service plan
- Construction and logistics plan
- Acoustic report
- Amenity space quality statement
- Schedule of drawings
- Level 00 landscape ga
- Level 7 landscape ga
- Level 16 landscape ga
- Level 24 landscape ga
- Level 25 landscape ga
- Design & access statement part 8
- Design & access statement part 1
- Design & access statement part 2
- Design & access statement part 3
- Design & access statement part 4
- Design & access statement part 5
- Design & access statement part 6
- Design & access statement part 7
- Planning statement
- Statement of community involvement part 2
- Statement of community involvement part 3
- Statement of community involvement part 1
- Transport assessment part 3
- Transport assessment part 1
- Transport assessment part 2
- Draft travel plan
- Parking design and management plan
- Energy & sustainability statement part 1
- Energy & sustainability statement part 2
- Energy & sustainability statement part 3
- Cil form
- Cover letter
- Application form
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Brent for determination, against a statutory target of eight weeks. Over the last year Brent decided full applications in a median of 70 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Brent
-
26/0302 Granted
2 Wembley Park Boulevard, Wembley, HA9 0HP
Proposed outdoor seating area with planters, balustrade and jumbrellas to restaurant
-
26/0225 Granted
Brent NHS Primary Care Trust, Wembley Centre For Health & Care, 116 Chaplin Road, Wembley, HA0 4UZ
Phased development including the demolition of existing buildings and erection of buildings comprising residential units (Use Class C3) and car parking spaces together with associated public realm, landscaping and highway improvements, cycle parking and stores, and all other associated and ancillary works. Subject to a Legal Agreement made under Section 106 of the Town and Country Planning Act 1990 (as amended) dated the 16 September 2026.
-
26/1430 Granted
64 Larch Road, London, NW2 6SE
Proposed retention of 6-bedroom 6-person house of multiple occupation (HMO)
-
26/2299 Awaiting decision
6A & 6B Chesham Street, London, NW10 0BJ
Replacement of existing windows with double glazed uPVC framed casement windows and replacement of existing front doors with double glazed GRP front doors to both flats.
-
26/2294 Awaiting decision
101B Wakeman Road, London, NW10 5BH
Proposed rear dormer extension and loft conversion into habitable space, dormer extension to roof of rear outrigger, installation of rear terrace with privacy screen and railing, installation of 3x front rooflights and replacement of side and rear windows to first-floor flat