Skip to content
PlanIndex Get alerts
Menu

Planning application

Glynns Skip Hire, Fifth Way, Wembley, HA9 0JD

Awaiting decision Brent 26/0831 Full Planning Permission

Works: Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Full planning permission for the demolition of existing buildings and structures and erection of two buildings ranging in height from 13 to 17 storeys to provide purpose built student accommodation (Use Class Sui Generis) and light industrial (Use Class E(g)(iii), car and cycle parking, amenity space (internal & external), new public realm, landscaping, alterations to vehicular access, highway works and other associated works.

As published by the council, reference 26/0831

Application record

Reference
26/0831
Type
Full Planning Permission
Status
Registered
Received
31 Mar 2026
Validated
31 Mar 2026
Ward
Wembley Park
Decision by
Planning Committee
Postcode
HA9 0JD

Site history

Applications at this address on the Brent register

This site has had 2 applications since 2023: 1 approved, 0 refused.

  • 23/1426 Granted

    Glynns Skip Hire, Fifth Way, Wembley, HA9 0JD

    Demolition of existing buildings and structures and erection of up to seven buildings ranging in height from 5 to 15 storeys to provide purpose built student accommodation (Use Class Sui Generis), light industrial (Use Class E(g)(iii) and cafe (Use Class E(a)) floorspace, car and cycle parking, amenity space (internal & external), new public realm, landscaping, alterations to vehicular access, highway works and other associated works (subject to Deed of Agreement dated 19th September 2025 under Section 106 of Town and Country Planning Act, 1990, as amended).

    Decided 24 Sep 2025 Full applications

Timeline

Dates from the published record

  1. 31 Mar 2026

    Received by Brent

  2. 25 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 26 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Brent took a median of 56 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Bidwells LLP Agent, registered in Cambridge

Active · incorporated 2009 · Cambridge

990 applications on PlanIndex · across 108 councils · 91% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Wembley Edge Property Limited Applicant, registered in Loughton

Active · incorporated 2020 · Loughton

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

114 documents on file for this application

  • Ugf plan Submitted Drawings Plans · 05 Oct 2026
  • Applicant response to 3rd party comments Supporting Documents · 02 Oct 2026
  • Site notice Consultation · 22 Sep 2026
  • List - consulted on application Consultation · 25 Aug 2026
  • List - consulted on application Consultation · 25 Aug 2026
  • List - consulted Consultation · 25 Aug 2026
  • List - consulted Consultation · 25 Aug 2026
  • List - consulted on application Consultation · 25 Aug 2026
  • List - consulted Consultation · 25 Aug 2026
  • List - consulted on application Consultation · 24 Aug 2026
  • List - consulted on application Consultation · 24 Aug 2026
  • List - consulted Consultation · 24 Aug 2026
  • List - consulted Consultation · 24 Aug 2026
  • Building safety regulator?s comments Consultee Comments (Public) · 22 Jul 2026
  • Revised energy statement (part 1) Supporting Documents · 10 Jul 2026
  • Revised energy statement (part 2) Supporting Documents · 10 Jul 2026
  • Daylight, sunlight & overshadowing assessment addendum Supporting Documents · 10 Jul 2026
  • Circular economy statement (part 1) Supporting Documents · 10 Jul 2026
  • Circular economy statement (part 2) Supporting Documents · 10 Jul 2026
  • Flood risk assessment Supporting Documents · 10 Jul 2026
  • Whole life carbon assessment Supporting Documents · 10 Jul 2026
  • Proposed ground floor plan Revised Documents · 26 Jun 2026
  • Delivery & servicing plan Revised Documents · 26 Jun 2026
  • Overview draft student management plan Supporting Documents · 26 Jun 2026
  • Env health Consultee Comments (Public) · 20 May 2026
  • Env health Consultee Comments (Public) · 12 May 2026
  • Brents site notice 28/04/2026 Original Submission · 28 Apr 2026
  • Site notice Consultation · 28 Apr 2026
  • London plan fire statement Supporting Documents · 24 Apr 2026
  • Planning gateway one fire statement Supporting Documents · 24 Apr 2026
  • Energy statement 2 Supporting Documents · 24 Apr 2026
  • List - consulted on application Consultation · 23 Apr 2026
  • List - consulted Consultation · 23 Apr 2026
  • List - consulted on application Consultation · 16 Apr 2026
  • List - consulted Consultation · 16 Apr 2026
  • List - consulted on application Consultation · 16 Apr 2026
  • List - consulted Consultation · 16 Apr 2026
  • Design & access statement 1 Design Access · 31 Mar 2026
  • Design & access statement 2 Design Access · 31 Mar 2026
  • Design & access statement 3 Design Access · 31 Mar 2026
  • Design & access statement 4 Design Access · 31 Mar 2026
  • Design & access statement 5 Design Access · 31 Mar 2026
  • Design & access statement 6 Design Access · 31 Mar 2026
  • Design & access statement 7 Design Access · 31 Mar 2026
  • Design & access statement 8 Design Access · 31 Mar 2026
  • Design & access statement 9 Design Access · 31 Mar 2026
  • Planning statement Supporting Documents · 31 Mar 2026
  • Location plan Submitted Drawings Plans · 31 Mar 2026
  • Existing site plan Submitted Drawings Plans · 31 Mar 2026
  • Proposed site plan Submitted Drawings Plans · 31 Mar 2026
  • Proposed block plan Submitted Drawings Plans · 31 Mar 2026
  • Basement floor plan Submitted Drawings Plans · 31 Mar 2026
  • Ground floor plan Submitted Drawings Plans · 31 Mar 2026
  • Mezzanine floor plan Submitted Drawings Plans · 31 Mar 2026
  • First floor plan Submitted Drawings Plans · 31 Mar 2026
  • Lower typical floor plan 02-12 Submitted Drawings Plans · 31 Mar 2026
  • Thteenth floor plan Submitted Drawings Plans · 31 Mar 2026
  • Upper typical floor plan 14-16 Submitted Drawings Plans · 31 Mar 2026
  • Roof plan Submitted Drawings Plans · 31 Mar 2026
  • Proposed east/south elevations Submitted Drawings Plans · 31 Mar 2026
  • Proposed north/east elevations Submitted Drawings Plans · 31 Mar 2026
  • Sectional elevations east/west Submitted Drawings Plans · 31 Mar 2026
  • Building sections a-b Submitted Drawings Plans · 31 Mar 2026
  • Building section c Submitted Drawings Plans · 31 Mar 2026
  • Typical dda student unit layouts Submitted Drawings Plans · 31 Mar 2026
  • Planning schedule of accommodation Supporting Documents · 31 Mar 2026
  • Energy statement Supporting Documents · 31 Mar 2026
  • Energy statement 3 Supporting Documents · 31 Mar 2026
  • Energy zero carbon report Supporting Documents · 31 Mar 2026
  • Circular economy statement Supporting Documents · 31 Mar 2026
  • Circular economy statement 2 Supporting Documents · 31 Mar 2026
  • Whole life-cycle carbon assessment Supporting Documents · 31 Mar 2026
  • Whole-life carbon cycle Supporting Documents · 31 Mar 2026
  • Circular economy statement Supporting Documents · 31 Mar 2026
  • Flood risk assessment & drainage strategy Supporting Documents · 31 Mar 2026
  • Workplace travel plan Supporting Documents · 31 Mar 2026
  • Residential travel plan Supporting Documents · 31 Mar 2026
  • Transport assessment Supporting Documents · 31 Mar 2026
  • Transport assessment 2 Supporting Documents · 31 Mar 2026
  • Delivery & servicing management plan Supporting Documents · 31 Mar 2026
  • Wind microclimate report Supporting Documents · 31 Mar 2026
  • Cover letter Supporting Documents · 31 Mar 2026
  • General arrangement plan - roof Submitted Drawings Plans · 31 Mar 2026
  • General arrangment plan - ground floor Submitted Drawings Plans · 31 Mar 2026
  • Air quality assessment Supporting Documents · 31 Mar 2026
  • Archaeological desk based assessment Supporting Documents · 31 Mar 2026
  • Basement impact assessment Supporting Documents · 31 Mar 2026
  • Basement impact assessment 2 Supporting Documents · 31 Mar 2026
  • Basement impact assessment 3 Supporting Documents · 31 Mar 2026
  • Basement impact assessment 4 Supporting Documents · 31 Mar 2026
  • Breeam pre-assessment tracker Supporting Documents · 31 Mar 2026
  • Pre-assessment statement Supporting Documents · 31 Mar 2026
  • Preliminary investigation report 7 Supporting Documents · 31 Mar 2026
  • Preliminary investigation report 6 Supporting Documents · 31 Mar 2026
  • Preliminary invesitgation report 5 Supporting Documents · 31 Mar 2026
  • Preliminary investigation report 4 Supporting Documents · 31 Mar 2026
  • Preliminary investigation report 3 Supporting Documents · 31 Mar 2026
  • Preliminary investigation report 2 Supporting Documents · 31 Mar 2026
  • Preliminary investigation report Supporting Documents · 31 Mar 2026
  • Main investigation report 2 Supporting Documents · 31 Mar 2026
  • Main investigation report Supporting Documents · 31 Mar 2026
  • Daylight, sunlight & overshadowing assessment Supporting Documents · 31 Mar 2026
  • Daylight, sunlight & overshadowing assessment 2 Supporting Documents · 31 Mar 2026
  • Technical note Supporting Documents · 31 Mar 2026
  • Biodiversity metric calculation tool Supporting Documents · 31 Mar 2026
  • Heritage, townscape & visual impact assessment 3 Supporting Documents · 31 Mar 2026
  • Heritage, townscape & visual impact assessment 2 Supporting Documents · 31 Mar 2026
  • Heritage, townscape & visual impact assessment Supporting Documents · 31 Mar 2026
  • Noise & vibration impact assessment Supporting Documents · 31 Mar 2026
  • Statement of community involvment Supporting Documents · 31 Mar 2026
  • Outline construction logistics plan Supporting Documents · 31 Mar 2026
  • Draft student management plan Supporting Documents · 31 Mar 2026
  • Telecommunications impact assessment Supporting Documents · 31 Mar 2026
  • Application form redacted Application Form (Public) · 31 Mar 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Brent for determination, against a statutory target of eight weeks. Over the last year Brent decided full applications in a median of 70 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Units 1-5 Inc, Cannon Trading Estate, First Way, Wembley, HA9 0JD

    20/1628 Submitted 5 Jun 2020 50 yards away

    Details pursuant to conditions 21 (student accommodation management plan) and 26 (refuse and recycling management strategy) of Full Planning Permission reference 17/3797 dated 21 June, 2018, for Demolition of the existing buildings and erection of a part 7/9/10/11 storey building, comprising educational use (Use Class D1), office use (Use Class B1(a)) and student accommodation (Use Class Sui Generis), with ancillary external landscaping subject to a Deed of Agreement dated 20 June 2018 under Section 106 of the Town and Country Planning Act 1990, as amended.

    Granted Conditions Demolition 6 docs
  • Ex Kelaty House, First Way, Wembley, HA9 0JD

    20/3963 Submitted 2 Dec 2020 50 yards away

    Details pursuant to condition 13 (external lighting) of Variation of Conditions reference 19/0882 dated 26 March, 2020

    Granted Conditions 6 docs
  • Ex Kelaty House, First Way, Wembley, HA9 0JD

    21/0075 Submitted 8 Jan 2021 50 yards away

    Details pursuant to condition 6 (SuDS) of Variation of Conditions reference 19/0882 dated 26 March, 2020, for Variation of condition 1 (approved plans and drawings) to allow the following changes: Amendment to the external appearance and reconfiguration of the internal layout to facilitate an increase in the number of student bedrooms by 100 (599 to 699). Internal Additional floor of accommodation included within blocks B, C, D and E; Inclusion of student bedrooms to the ground floor of blocks B and C; Reconfiguration of plant room spaces and introduction of a student communal space within the block B lower ground floor; Reconfiguration and rationalisation of ground floor ancillary and communal spaces; Reconfiguration of management suite serving the student accommodation blocks including the omission of the mezzanine floor from block E; Block A floor to floor heights recast above ground floor to achieve equal floor to floor heights; and Floor to floor heights reduced to 2850mm on all levels above ground floor on blocks B, C, D and E. External Reduction in the building footprint of blocks B and E; Reduction to block A building height; Increase in parapet heights across five blocks Minor alteration to parapet profile on all blocks to maintain relationship across the scheme; Rationalisation of external levels within the courtyard and updates to ground floor finished floor levels of blocks B, C, D and E; Window cills raised to 1100mm throughout, to be in accordance with Building Regulations. Blocks B, C, D and E windows changed to side hung, outward opening. Block A windows maintained as top hung, outward opening; Minor alterations to the building envelope including alterations to the ground floor window head heights, ground floor window types, fenestration arrangement, extent of cladding at ground floor and omission of ground floor recesses to suit inclusion of bedrooms; Omission of accessible roof terraces from blocks B, C, D and E; Provision of an additional entrance to the retail unit fronting Fifth Way to facilitate the subdivision of the retail unit; Provision of access steps within the immediate vicinity of both the approved and proposed retail entrances. Changes to the landscaping strategy across the site. of planning permission reference 17/2924 dated 12/01/2018 for Variation to condition 2 (approved plans) to allow changes to the approved scheme, including the form and layout of Block A (see description for further details), of planning permission reference 16/1435 dated 11/10/2016 for Variation of condition 2 (approved plans) to allow the following changes to the approved hotel/services apartments only, referred to as Building A *reconfiguration and internal alterations to increase the no of bedrooms from 198 to 301 *minor external fenestration changes to windows sizes and positions *change external space to hotel restaurant into a landscaped amenity space of full planning permission reference 12/1293 dated 30/10/2012 for Full planning permission is sought for the redevelopment of the site comprising the erection of 5 buildings ranging in height from 4 to 13 storeys for a mix of uses including hotel/serviced apartments (Use Class C1), student accommodation (sui-generis use) and flexible business/retail/community/leisure uses (Use Classes B1/A1/A2/A3/A4/D1/D2), and ancillary development including basement car park and hard and soft landscaping providing both public and private amenity space and subject to a Deed of Agreement dated 18/10/2012 under Section 106 of the Town and Country Planning Act 1990, as amended.

    Granted Conditions New dwelling Windows or glazing 9 docs
  • Ex Kelaty House, First Way, Wembley, HA9 0JD

    20/3755 Submitted 17 Nov 2020 50 yards away

    Details pursuant to partial discharge condition 15 (Fume extraction) of Variation of Conditions reference 19/0882 dated 26 March, 2020, for Variation of condition 1 (approved plans and drawings) to allow the following changes: Amendment to the external appearance and reconfiguration of the internal layout to facilitate an increase in the number of student bedrooms by 100 (599 to 699). Internal Additional floor of accommodation included within blocks B, C, D and E; Inclusion of student bedrooms to the ground floor of blocks B and C; Reconfiguration of plant room spaces and introduction of a student communal space within the block B lower ground floor; Reconfiguration and rationalisation of ground floor ancillary and communal spaces; Reconfiguration of management suite serving the student accommodation blocks including the omission of the mezzanine floor from block E; Block A floor to floor heights recast above ground floor to achieve equal floor to floor heights; and Floor to floor heights reduced to 2850mm on all levels above ground floor on blocks B, C, D and E. External Reduction in the building footprint of blocks B and E; Reduction to block A building height; Increase in parapet heights across five blocks Minor alteration to parapet profile on all blocks to maintain relationship across the scheme; Rationalisation of external levels within the courtyard and updates to ground floor finished floor levels of blocks B, C, D and E; Window cills raised to 1100mm throughout, to be in accordance with Building Regulations. Blocks B, C, D and E windows changed to side hung, outward opening. Block A windows maintained as top hung, outward opening; Minor alterations to the building envelope including alterations to the ground floor window head heights, ground floor window types, fenestration arrangement, extent of cladding at ground floor and omission of ground floor recesses to suit inclusion of bedrooms; Omission of accessible roof terraces from blocks B, C, D and E; Provision of an additional entrance to the retail unit fronting Fifth Way to facilitate the subdivision of the retail unit; Provision of access steps within the immediate vicinity of both the approved and proposed retail entrances. Changes to the landscaping strategy across the site. of planning permission reference 17/2924 dated 12/01/2018 for Variation to condition 2 (approved plans) to allow changes to the approved scheme, including the form and layout of Block A (see description for further details), of planning permission reference 16/1435 dated 11/10/2016 for Variation of condition 2 (approved plans) to allow the following changes to the approved hotel/services apartments only, referred to as Building A *reconfiguration and internal alterations to increase the no of bedrooms from 198 to 301 *minor external fenestration changes to windows sizes and positions *change external space to hotel restaurant into a landscaped amenity space of full planning permission reference 12/1293 dated 30/10/2012 for Full planning permission is sought for the redevelopment of the site comprising the erection of 5 buildings ranging in height from 4 to 13 storeys for a mix of uses including hotel/serviced apartments (Use Class C1), student accommodation (sui-generis use) and flexible business/retail/community/leisure uses (Use Classes B1/A1/A2/A3/A4/D1/D2), and ancillary development including basement car park and hard and soft landscaping providing both public and private amenity space and subject to a Deed of Agreement dated 18/10/2012 under Section 106 of the Town and Country Planning Act 1990, as amended

    Granted Conditions New dwelling Windows or glazing 5 docs
  • Glynns Skip Hire, Fifth Way, Wembley, HA9 0JD

    23/1426 Submitted 21 Apr 2023 50 yards away

    Demolition of existing buildings and structures and erection of up to seven buildings ranging in height from 5 to 15 storeys to provide purpose built student accommodation (Use Class Sui Generis), light industrial (Use Class E(g)(iii) and cafe (Use Class E(a)) floorspace, car and cycle parking, amenity space (internal & external), new public realm, landscaping, alterations to vehicular access, highway works and other associated works (subject to Deed of Agreement dated 19th September 2025 under Section 106 of Town and Country Planning Act, 1990, as amended).

    Granted Full applications Demolition 95 docs
  • Ex Kelaty House, First Way, Wembley, HA9 0JD

    21/2513 Submitted 2 Jul 2021 50 yards away

    Non-material amendment (Block A: a small portion of grass to the rear courtyard to be imitation grass) of Variation of Conditions reference 19/0882 dated 26 March, 2020, for Variation of condition 1 (approved plans and drawings) to allow the following changes: Amendment to the external appearance and reconfiguration of the internal layout to facilitate an increase in the number of student bedrooms by 100 (599 to 699). Internal Additional floor of accommodation included within blocks B, C, D and E; Inclusion of student bedrooms to the ground floor of blocks B and C; Reconfiguration of plant room spaces and introduction of a student communal space within the block B lower ground floor; Reconfiguration and rationalisation of ground floor ancillary and communal spaces; Reconfiguration of management suite serving the student accommodation blocks including the omission of the mezzanine floor from block E; Block A floor to floor heights recast above ground floor to achieve equal floor to floor heights; and Floor to floor heights reduced to 2850mm on all levels above ground floor on blocks B, C, D and E. External Reduction in the building footprint of blocks B and E; Reduction to block A building height; Increase in parapet heights across five blocks Minor alteration to parapet profile on all blocks to maintain relationship across the scheme; Rationalisation of external levels within the courtyard and updates to ground floor finished floor levels of blocks B, C, D and E; Window cills raised to 1100mm throughout, to be in accordance with Building Regulations. Blocks B, C, D and E windows changed to side hung, outward opening. Block A windows maintained as top hung, outward opening; Minor alterations to the building envelope including alterations to the ground floor window head heights, ground floor window types, fenestration arrangement, extent of cladding at ground floor and omission of ground floor recesses to suit inclusion of bedrooms; Omission of accessible roof terraces from blocks B, C, D and E; Provision of an additional entrance to the retail unit fronting Fifth Way to facilitate the subdivision of the retail unit; Provision of access steps within the immediate vicinity of both the approved and proposed retail entrances. Changes to the landscaping strategy across the site. of planning permission reference 17/2924 dated 12/01/2018 for Variation to condition 2 (approved plans) to allow changes to the approved scheme, including the form and layout of Block A (see description for further details), of planning permission reference 16/1435 dated 11/10/2016 for Variation of condition 2 (approved plans) to allow the following changes to the approved hotel/services apartments only, referred to as Building A *reconfiguration and internal alterations to increase the no of bedrooms from 198 to 301 *minor external fenestration changes to windows sizes and positions *change external space to hotel restaurant into a landscaped amenity space of full planning permission reference 12/1293 dated 30/10/2012 for Full planning permission is sought for the redevelopment of the site comprising the erection of 5 buildings ranging in height from 4 to 13 storeys for a mix of uses including hotel/serviced apartments (Use Class C1), student accommodation (sui-generis use) and flexible business/retail/community/leisure uses (Use Classes B1/A1/A2/A3/A4/D1/D2), and ancillary development including basement car park and hard and soft landscaping providing both public and private amenity space and subject to a Deed of Agreement dated 18/10/2012 under Section 106 of the Town and Country Planning Act 1990, as amended. SUBJECT TO DEED OF VARIATION DATED 20TH MARCH 2020

    Granted Amendments New dwelling Windows or glazing 4 docs

In Brent

  • 26/0302 Granted

    2 Wembley Park Boulevard, Wembley, HA9 0HP

    Proposed outdoor seating area with planters, balustrade and jumbrellas to restaurant

    Received 9 Feb, published by the council 25 Jul 2026 Full applications
  • 26/0225 Granted

    Brent NHS Primary Care Trust, Wembley Centre For Health & Care, 116 Chaplin Road, Wembley, HA0 4UZ

    Phased development including the demolition of existing buildings and erection of buildings comprising residential units (Use Class C3) and car parking spaces together with associated public realm, landscaping and highway improvements, cycle parking and stores, and all other associated and ancillary works. Subject to a Legal Agreement made under Section 106 of the Town and Country Planning Act 1990 (as amended) dated the 16 September 2026.

    Received 30 Jan, published by the council 25 Jul 2026 Full applications
  • 26/1430 Granted

    64 Larch Road, London, NW2 6SE

    Proposed retention of 6-bedroom 6-person house of multiple occupation (HMO)

    Received 9 Jun, published by the council 25 Jul 2026 Full applications
  • 26/2294 Awaiting decision

    101B Wakeman Road, London, NW10 5BH

    Proposed rear dormer extension and loft conversion into habitable space, dormer extension to roof of rear outrigger, installation of rear terrace with privacy screen and railing, installation of 3x front rooflights and replacement of side and rear windows to first-floor flat

    Received 9 Sep, published by the council 21 Sep 2026 Full applications
  • 26/2266 Awaiting decision

    233 Watford Road, Harrow, HA1 3TU

    Erection of single-storey side extension, installation of canopies to front and side, change of use of the front part of the premises to a hand car wash, and addition of signage to front of MOT Centre

    Received 7 Sep, published by the council 21 Sep 2026 Full applications