Planning application
26/0691
Olympic Office Centre, 8 Fulton Road, Wembley, HA9 0NU
Proposal
Details pursuant to condition 6 (flood risk assessment) of Full Planning Permission reference 23/0578 dated 15 March, 2024, for Demolition of existing building and erection of building for use as a purpose-built Further Education College Campus with associated plant at roof level, provision of hard and soft landscaping and cycle parking facilities, loading bay and accessible parking bays on Rutherford Road frontage and drop off bay on Fulton Road, subject to Deed of Agreement dated 14th March 2024 under Section 106 of Town and Country Planning Act, 1990 as amended
As published by the council, reference 26/0691
Timeline
Dates from the published record
-
18 Mar 2026
Received by Brent
-
24 Jun 2026
Decision issued: Permission Granted
-
25 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
26/1640 Awaiting decision
Olympic Office Centre, 8 Fulton Road, Wembley, HA9 0NU
Details pursuant to condition 17 (Plan showing arrangement of cycle storage within the development), of Full Planning Permission application reference 23/0578 dated 15/03/2024 for Demolition of existing building and erection of building for use as a purpose-built Further Education College Campus with associated plant at roof level, provision of hard and soft landscaping and cycle parking facilities, loading bay and accessible parking bays on Rutherford Road frontage and drop off bay on Fulton Road, subject to Deed of Agreement dated 14th March 2024 under Section 106 of Town and Country Planning Act, 1990 as amended
-
26/1146 Granted
Olympic Office Centre, 8 Fulton Road, Wembley, HA9 0NU
Details pursuant to condition 14 (communal television/full fibre connectivity infrastructure) of Full Planning Permission reference 23/0578 dated 15 March, 2024, for Demolition of existing building and erection of building for use as a purpose-built Further Education College Campus with associated plant at roof level, provision of hard and soft landscaping and cycle parking facilities, loading bay and accessible parking bays on Rutherford Road frontage and drop off bay on Fulton Road, subject to Deed of Agreement dated 14th March 2024 under Section 106 of Town and Country Planning Act, 1990 as amended
-
20/3930 Granted
Olympic Office Centre, 8 Fulton Road, Wembley, HA9 0NU
Certificate of lawfulness for proposed temporary use of the first and second floors as coronavirus vaccination centre
-
20/2371 Withdrawn
1 Olympic Way, Wembley, HA9 0NP
Internally illuminated advertising board on front of building
-
20/3750 Granted
1 Olympic Way, Wembley, HA9 0NP
Details pursuant to condition 26 (ground floor cycling parking) of Full Planning Permission reference 19/0395 dated 30 June, 2020, for Erection of upto 7 storey roof top extension to the existing building to create 90 flats; erection of a rear extension to existing building to create a new 15 storey block (including a 2 storey under-croft for vehicular and pedestrian access) to create 26 flats, conversion of existing 8th floor office space to create 3 flats, creating a total of 119 self-contained flats; infilling of ground floor undercroft of existing building to form new ground floor uses comprising retail floorspace (A1, A3, A4) and office floorspace (B1), creation of first floor podium above existing car parking space to provide a landscaped amenity space for residents with associated cycle and refuse storage, creation of public access alongside Wealdstone Brook and refurbishment of existing building facades to No. 1 Olympic Way (including replacement of windows), subject to a Deed of Agreement dated 29th June 2020 under Section 106 of the Town and Country Planning Act 1990 (Revised description)
-
20/3161 Granted
1 Olympic Way, Wembley, HA9 0NP
Details pursuant to conditions 22 (landscaping) and 23 (planting species) of Full Planning Permission reference 19/0395 dated 30 June, 2020, for Erection of upto 7 storey roof top extension to the existing building to create 90 flats; erection of a rear extension to existing building to create a new 15 storey block (including a 2 storey under-croft for vehicular and pedestrian access) to create 26 flats, conversion of existing 8th floor office space to create 3 flats, creating a total of 119 self-contained flats; infilling of ground floor undercroft of existing building to form new ground floor uses comprising retail floorspace (A1, A3, A4) and office floorspace (B1), creation of first floor podium above existing car parking space to provide a landscaped amenity space for residents with associated cycle and refuse storage, creation of public access alongside Wealdstone Brook and refurbishment of existing building facades to No. 1 Olympic Way (including replacement of windows), subject to a Deed of Agreement dated 29th June 2020 under Section 106 of the Town and Country Planning Act 1990 (Revised description)
Other conditions applications
In Brent
-
26/1927 Awaiting decision
18 Ranelagh Road, Wembley, HA0 4TP
Details pursuant to condition 7 (Landscaping Plan), of Full Planning Permission application reference 24/3663 dated 07/03/2025 for Proposed conversion into dwellinghouse into 2x self contained flats, sub-division of rear garden and cycle storage and refuse and recycle space to front.
-
26/1923 Awaiting decision
116 & 118 Church Road, London, NW10 9NG
Details pursuant to conditions 4 (basement impact assessment) and 5 (construction method plan (CMP)) of planning appeal reference 6004478 granted the 28th May 2026 of Full Planning application reference 25/2931 for Erection of two storeys above commercial units 116 &118 to create 4 self-contained flats, alteration to shop front of 118 and partial excavation of basements to form cycle storage
-
26/1544 Granted
110 Walm Lane, London, NW2 4RS
Details pursuant to conditions 18 (Details of materials for all external work excluding the public house) and 20 (Detail drawings), and partial condition 19 (Details of materials for the external facade of the public house) of approved appeal decision reference APP/T5150/W/18/3214420 dated 18/11/2019 relating to full planning permission application reference 18/0210 dated 01/05/2018 for Demolition of public house and erection of a 4 and part 5 storey building comprising 48 self-contained flats (14 x 1 bed, 22 x 2 bed, 11 x 3 bed & 1 x 4 bed) on upper floors with green roof and photovoltaics panels, a public house and function room on ground floor, provision of bicycle storage with associated amenity space, landscaping and refuse stores
-
26/1434 Granted
473 High Road, London, NW10 2JH
Details pursuant to condition 14 (BREEAM Assessment), of Full planning permission application reference 23/2160 dated 17/06/2024 for Partial demolition and erection of extensions to convert existing retail space into 2 units (Use Class E: Commercial, Business and Service) with new sub-station, plant, ramp access, alterations to car and cycle provision, boundary treatment and associated landscaping
-
26/1919 Awaiting decision
Aggregates Express Asphalt, Great Central Way, London, NW10 0JD
Details pursuant to conditions 6 (construction environment management plan (CEMP)), 7 (construction method statement), 8 (landscaping), 9 (wildlife and nesting features) and 10 (delivery and servicing plan (DSP)) of Full Planning Permission reference 24/1323 dated 15 July, 2026, for Demolition of select buildings and structures; construction of new roof linking the existing open sided dry storage buildings; new containment fence along Great Central Way; new open sided aggregates processing buildings; new site control and welfare building; and yard storage areas for an aggregates depot including associated infrastructure, new access to north of site to/from Great Central Way, removal of access gate to north west side of site and landscaping, new boundary treatment, new parking arrangements (vehicular and cycle provision); and continued use of the railhead to transport aggregates, subject to Deed of Agreement dated 13 July 2026 under Section 106 of Town and Country Planning Act, 1990, as amended .