Skip to content
PlanIndex Get alerts
Menu

Planning application

20/4260

77A Wembley Hill Road, Wembley, HA9 8BU

Granted Brent Full Planning Permission

Proposal

Proposed loft conversion, formation of rear dormer, insertion of front roof lights

As published by the council, reference 20/4260

Timeline

Dates from the published record

  1. 23 Dec 2020

    Received by Brent

  2. 17 Feb 2021

    Decision issued: Permission Granted

  3. 2 Aug 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 20/3804 Refused

    Shell Service Station, Empire Way, Wembley, HA9 0RJ

    Prior approval for installation of a 20m high monopole accommodating 3no antenna apertures & 1no 300mm dish; installation of 2no cabinets; ancillary works at Shell Service station.

    20 Nov 2020 72m away Telecoms
  • 24/2198 Refused

    Shell Service Station, Empire Way, Wembley, HA9 0RJ

    Internally illuminated freestanding digital display screen.

    6 Aug 2024 72m away Advertising
  • 20/1503 Granted

    Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA

    Details pursuant to condition 9 (materials) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.

    22 May 2020 74m away Conditions
  • 20/3928 Granted

    Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA

    Details pursuant to Condition 13 (External Lighting) of Full Planning Reference 19/3915 dated 5/11/2019 for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.

    30 Nov 2020 74m away Conditions
  • 20/3588 Granted

    Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA

    Details pursuant to condition 17 (construction method statement) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.

    4 Nov 2020 74m away Conditions
  • 20/3541 Refused

    Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA

    Details pursuant to condition 16 (external plant noise) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core. New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.

    2 Nov 2020 74m away Conditions

In Brent

  • 26/1435 Granted

    202A Preston Road, Wembley, HA9 8PA

    Proposed rear dormer extension, installation of rooflights and alteration to entryway to the first floor flat.

    9 Jun 2026 Full applications
  • 26/1315 Refused

    1 & 2 Zyad Close, London, NW10 9BB

    Joint application for proposed erection of 1x new storey to roof of 2x existing two-storey dwellinghouses

    25 May 2026 Full applications
  • 26/0820 Granted

    105 Dollis Hill Lane, London, NW2 6HS

    Proposed rear dormer extension, hip to gable roof extension, new pitched roof to first floor and installation of rooflights to the dwellinghouse.

    30 Mar 2026 Full applications
  • 26/0529 Refused

    24 Staverton Road, London, NW2 5HL

    Proposed single-storey rear extension, raised patio decking and outbuilding in the rear garden of the ground floor flat

    1 Mar 2026 Full applications
  • 26/1367 Granted

    69, 71, 73 & 75 Goldsmith Lane, London, NW9 9AR

    Installation of a new rainwater hopper and down pipe to the front elevation of building

    1 Jun 2026 Full applications