Planning application
Land Surrounding Wembley Stadium, Empire Way, Wembley, HA9
Works: New dwelling Trees Major scheme
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
The laying out of hard and soft landscaping for the part of the eastern side of "Wembley Park Boulevard" This application is submitted as the Reserved Matters pursuant to condition 2 (i) (ii) (iii) (iv) (v) (siting, design, appearance, means of access and landscaping) and details pursuant to conditions 2 (vi) materials, 6 (Infrastructure), 14 (noise attenuation) 15 (plant), 28 (landscaping), 30 (tree removal), 32 (parcel ecological management strategy), 49(a) (site investigation), 58 (cycle routes), 59 (cycle storage), 61 (underground parking), 63 (sunlight and daylight), 64 (wind tunnel testing and wind mitigation measures), 66 (energy initiatives, 67 (BREEAM Assessment) with the following of those conditions specified as not relevant to this part of the development: 14, 15, 30, 61, 63, 66 and 67. Planning consent reference 03/3200 was for: Works for the re-orientation of Wembley Arena; Class A1 (Retail) comprising up to 14,200m² designer retail outlet, 11,800m² sports retailing; Class A1/A2 shops/financial and professional services up to 8,000m² (including up to 2,000m² supermarket); Class A1 (Retail) comprising up to 400 square metres of hotel boutique retail; Class A3 (Food and Drink), up to 12,700m²; Class B1 (a) (b) and (c) Business, up to 63,000m²; Class C1 (Hotel), up to 25,400m²; Class C1/Sui Generis (Hotel apartments), up to 26,700m²; Class C2 (Residential institutions) up to 5,000m²; Class C3 (dwellings) up to 277,000m², (up to 3,727 dwellings); Student accommodation (Sui Generis), up to 16,600m²; Class D1 (Non-residential institutions), up to 8,200m²; Class D2 (Assembly and Leisure), up to 28,500m² (including the existing Arena of 13,700m²); together with associated open space, public market area (Class A1), hard and soft landscaping, highway and engineering works, electricity substation, other utility requirements, other parking and servicing, and improvements to Olympic Way; AND; reserved matters relating to siting, design, external appearance and means of access for the 3-storey structure to provide car and coach parking).
As published by the council, reference 11/3371
Application record
- Reference
- 11/3371
- Type
- Reserved matters to Outline Permission
- Status
- Decided
- Decision
- Grant Permission
- Received
- 22 Dec 2011
- Validated
- 22 Dec 2011
- Decided
- 23 Jul 2012
- Ward
- Tokyngton
- Decision by
- Delegated Team Manager
Timeline
Dates from the published record
-
22 Dec 2011
Received by Brent
-
23 Jul 2012
Decision issued: Grant Permission
-
20 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a planning consultancy registered in Leeds
33 applications on PlanIndex · across 8 councils · 93% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Brent granted permission on 23 July 2012, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About reserved matters applications
A reserved matters application fills in the detail held back from an earlier outline permission, judged against that permission rather than the principle of development. More in our guide to planning application types.
Other reserved matters applications
In Brent
-
25/3114 Granted
Phase 4b (Plot K) - Land Former 25-28 Northfields, Beresford Avenue, Wembley, HA0 1NW
Reserved matters application pursuant to condition 3 (layout; scale; appearance; access; landscaping) of hybrid planning permission 25/2943, dated 28th April 2026, for layout, scale, appearance, access and landscaping of Phase 4b comprising the demolition of existing buildings and structures and construction of residential units (Use Class C3) and affordable workspace (Use Class E), together with associated disabled car parking, cycling parking, residential communal and private amenity space, landscaping and public realm works, refuse and servicing arrangements and ancillary facilitating works (All matters reserved) Information is provided to discharge the following conditions for Phase 4b: 10(a): Sound attenuation 20(a): Air Quality/Air Quality Neutral Assessment 32: Delivery and Servicing Plan 33: Wind Mitigation 34: BREEAM pre-assessment
-
26/0840 Awaiting decision
Phase 4c (Plot L) - Land Former 25-28 Northfields, Beresford Avenue, Wembley, HA0 1NW
Reserved matters application pursuant to condition 3 (layout; scale; appearance; access; landscaping) of hybrid planning permission 25/2943, dated 28th April 2026, for layout, scale, appearance, access and landscaping of Phase 4c comprising the construction of residential units (Use Class C3) together with basement car parking, cycle parking, amenity space, landscaping, public realm and other associated works. Information is provided to discharge the following conditions for Phase 4c: 10(a): Sound attenuation 20(a): Air Quality/Air Quality Neutral Assessment 32: Delivery and Servicing Plan 33: Wind Mitigation
-
19/0530 Refused
Neasden Service Station, Neasden Lane, London, NW10 2UE
Reserved matters application (access, appearance, landscaping, layout and scale) in relation to condition 1 of Outline planning permission reference 17/3794, granted under appeal APP/T5150/W/3190117 on 29/08/2018 for demolition of existing service station and erection of a five storey hostel (Use class Sui Generis) with associated parking and all associated site development works (all matters reserved)
-
15/1337 Granted
Former Oriental City, 399 Edgware Road, Kingsbury, London, NW9
Reserved matters application for construction of a part 2-, part 9-storey buildings comprising 183 residential units (52 x 1 beds, 67 x 2 beds, 51 x 3 beds and 13 x 4 beds) with associated landscaping, parking and servicing (Phase 2). This application has been submitted pursuant to conditions 4 (the Reserved Matters), 37 (car parking), 38 (servicing details), 39 (cycle parking), 41 (residential unit mix) and 42 (details of housing quality) of Outline planning permission reference 12/2166 (subsequently varied by application ref: 14/4965 dated 18 March 2015 and non material amendment ref: 14/3849 dated 5 January 2015). Outline planning permission 12/2166 was for a hybrid planning application, as amended by plans received 1 November 2012, for the demolition of all existing buildings and structures and: full planning permission (Phase 1) for comprehensive mixed-use development comprising full planning permission the erection of a 7,817sqm gross external area (GEA) Class A1 retail foodstore with associated service and delivery yard; 5,207sqm GEA of new Oriental and Far Eastern Floorspace to include shops, financial and professional services, restaurants and cafes, drinking establishments, hot food takeaways and non-residential institutions (Class A1, A2, A3, A4, A5, B1 and D1); podium slab along Airco Close; a site-wide energy centre; associated car parking spaces, motorcycle parking spaces and cycle parking spaces; associated landscaping and public realm works; new vehicular access from Grove Park and vehicular access from Plaza Walk and associated highway works; and outline planning permission (Phases 2 and 3) comprising residential floorspace (Class C3, accompanied by illustrative residential accommodation schedule indicating 183 residential units), associated car parking spaces and cycle parking spaces, associated landscaping and new vehicular access from Airco Close (Phase 2, all matters reserved) and two form of entry primary school and nursery (Class D1, Phase 3, all matters reserved). The application is accompanied by an Environmental Statement (revised October 2012) and subject to a Deed of Agreement dated 26 June 2013 under Section 106 of the Town and Country Planning Act 1990, as amended.