Planning application
Land North Of Harvest Ride and South Of Forest Road and East Of West End Lane West End Lane Warfield Bracknell Berkshire
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of a new access and crossover from Binfield Road to serve a foul water pumping station and above ground pressure reducing installation.
As published by the council, reference 15/00131/FUL
Application record
- Reference
- 15/00131/FUL
- Type
- Full
- Status
- Approved
- Decision
- Approval
- Received
- 23 Feb 2015
- Validated
- 23 Feb 2015
- Decided
- 9 Apr 2015
- Ward
- Binfield With Warfield
- Parish
- Warfield Parish Council
- Decision by
- Delegated
Site history
Applications at this address on the Bracknell Forest register
This site has had 46 applications since 2014: 42 approved, 0 refused.
-
20/00067/COND Granted
Land North Of Harvest Ride and South Of Forest Road and East Of West End Lane West End Lane Warfield Bracknell Berkshire
Details pursuant to condition 10 (Protected Species Survey) of planning permission 13/01007/OUT (Phase 6/7).
-
18/00407/A Granted
Land North Of Harvest Ride and South Of Forest Road and East Of West End Lane West End Lane Warfield Bracknell Berkshire
Display of advertising signs (v-boards, bridge signs, gantry signs and box signs) and flags on Sopwith Road (north-south link road) and Forest Road, and gantry sign on Harvest Ride at entrance to Phase 5, for a temporary period.
-
18/00396/REM Granted
Land North Of Harvest Ride and South Of Forest Road and East Of West End Lane West End Lane Warfield Bracknell Berkshire
Submission of details of layout, scale, appearance and landscaping relating to Phases 6 and 7 of the land north of Harvest Ride for the erection of 157 dwellings, and associated parking and roads, pursuant to outline planning permission 13/01007/OUT.
-
18/00062/COND Granted
Land North Of Harvest Ride and South Of Forest Road and East Of West End Lane West End Lane Warfield Bracknell Berkshire
Details pursuant to conditions 03 (external lighting), 06 (landscaping) and 09 (drainage) for phase 5 of reserved matters approval 17/00054/REM. Phase 5
-
17/01383/REM Granted
Land North Of Harvest Ride and South Of Forest Road and East Of West End Lane West End Lane Warfield Bracknell Berkshire
Submission of details of layout, scale, appearance, access and landscaping for laying out of site for allotments and erection of community building, with associated car parking and works, pursuant to outline planning permission 13/01007/OUT.
-
17/00210/COND Granted
Land North Of Harvest Ride and South Of Forest Road and East Of West End Lane West End Lane Warfield Bracknell Berkshire
Details pursuant to condition 08 (Hard and Soft Landscaping) of reserved matters approval 16/01123/REM. Phase 4B
-
17/00177/COND Granted
Land North Of Harvest Ride and South Of Forest Road and East Of West End Lane West End Lane Warfield Bracknell Berkshire
Details pursuant to conditions 32 (surface water drainage) and 34 (foul water drainage) of planning permission 13/01007/OUT (plots 1-37 and 65-81 of phase 5)
-
17/00166/COND Granted
Land North Of Harvest Ride and South Of Forest Road and East Of West End Lane West End Lane Warfield Bracknell Berkshire
Details pursuant to conditions 21 (finished floor levels) and 25 (access to each phase) of planning permission 13/01007/OUT. (Plots 1-37 and 65-81: phase 5)
-
17/00150/COND Granted
Land North Of Harvest Ride and South Of Forest Road and East Of West End Lane West End Lane Warfield Bracknell Berkshire
Details pursuant to conditions 02 (external materials) and 04 (cycle parking) of reserved matters approval 17/00054/REM (Phase 5)
-
17/00139/COND Granted
Land North Of Harvest Ride and South Of Forest Road and East Of West End Lane West End Lane Warfield Bracknell Berkshire
Details pursuant to conditions 20 (landscape management plan) and 37 (ecological management plan) of planning permission 13/01007/OUT (relates to Phases 3 and 4A)
Timeline
Dates from the published record
-
23 Feb 2015
Received by Bracknell Forest
-
9 Apr 2015
Decision issued: Approval
-
22 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
15/00185/COND Granted
Land North Of Harvest Ride and South Of Forest Road and East Of West End Lane West End Lane Warfield Bracknell Berkshire
Details pursuant to conditions 03 (access details) and 05 (off-site works) of planning permission 15/00131/FUL
Documents
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Bracknell Forest granted permission on 9 April 2015, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Bracknell Forest
-
PA/2026/0593 Refused
CAMBRIDGE COACHWORKS, WELLINGTON ROAD, CROWTHORNE, RG45 7LD
Proposed extension to roof and extension to create a two-bedroom, self build flat with balcony and associated parking.
-
PA/2026/0412 Granted
22B THE ELMS, WARFIELD PARK, BRACKNELL, RG42 3RP
Installation of a concrete base and shed, extension of patio area including pergola, installation of decking, replacement of natural grass with astro turf, and installation of gravel/astro surface. (Retrospective)
-
25/00796/FUL Refused
Land East Of Osborne Lane Warfield Bracknell Berkshire
Erection of 32 dwellings, with associated access, drainage works, tree works, woodland management, open space and landscaping.
-
25/00764/FUL Granted
Easthampstead Park Old Wokingham Road Wokingham Berkshire RG40 3DF
Alterations to existing garage block to convert from bin store to offices for Easthampstead Park Hotel (Use Class C1), and associated enlargement of 2 no. refuse enclosures.
-
PA/2026/0803 Awaiting decision
The Point, Skimped Hill Lane, Bracknell, RG12 1EN
Demolition of existing building and erection of Class E retail foodstore with associated access and landscape works.