Skip to content
PlanIndex Get alerts
Menu

Planning application

Land North Of Harvest Ride and South Of Forest Road and East Of West End Lane West End Lane Warfield Bracknell Berkshire

Granted Bracknell Forest 18/00396/REM Reserved Matters

Relates to 13/01007/OUT

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Submission of details of layout, scale, appearance and landscaping relating to Phases 6 and 7 of the land north of Harvest Ride for the erection of 157 dwellings, and associated parking and roads, pursuant to outline planning permission 13/01007/OUT.

As published by the council, reference 18/00396/REM

Application record

Reference
18/00396/REM
Type
Reserved Matters
Status
Approved
Decision
Approval
Received
16 Apr 2018
Validated
16 Apr 2018
Decided
3 Dec 2018
Ward
Binfield With Warfield
Parish
Warfield Parish Council
Decision by
Delegated

Site history

Applications at this address on the Bracknell Forest register

This site has had 46 applications since 2014: 42 approved, 0 refused.

  • 20/00067/COND Granted

    Land North Of Harvest Ride and South Of Forest Road and East Of West End Lane West End Lane Warfield Bracknell Berkshire

    Details pursuant to condition 10 (Protected Species Survey) of planning permission 13/01007/OUT (Phase 6/7).

    Decided 25 Aug 2021 Conditions
  • 18/00407/A Granted

    Land North Of Harvest Ride and South Of Forest Road and East Of West End Lane West End Lane Warfield Bracknell Berkshire

    Display of advertising signs (v-boards, bridge signs, gantry signs and box signs) and flags on Sopwith Road (north-south link road) and Forest Road, and gantry sign on Harvest Ride at entrance to Phase 5, for a temporary period.

    Decided 6 Aug 2018 Advertising
  • 18/00062/COND Granted

    Land North Of Harvest Ride and South Of Forest Road and East Of West End Lane West End Lane Warfield Bracknell Berkshire

    Details pursuant to conditions 03 (external lighting), 06 (landscaping) and 09 (drainage) for phase 5 of reserved matters approval 17/00054/REM. Phase 5

    Decided 4 Apr 2019 Conditions
  • 17/01383/REM Granted

    Land North Of Harvest Ride and South Of Forest Road and East Of West End Lane West End Lane Warfield Bracknell Berkshire

    Submission of details of layout, scale, appearance, access and landscaping for laying out of site for allotments and erection of community building, with associated car parking and works, pursuant to outline planning permission 13/01007/OUT.

    Decided 16 Jul 2018 Reserved matters
  • 17/00210/COND Granted

    Land North Of Harvest Ride and South Of Forest Road and East Of West End Lane West End Lane Warfield Bracknell Berkshire

    Details pursuant to condition 08 (Hard and Soft Landscaping) of reserved matters approval 16/01123/REM. Phase 4B

    Decided 5 Feb 2018 Conditions
  • 17/00177/COND Granted

    Land North Of Harvest Ride and South Of Forest Road and East Of West End Lane West End Lane Warfield Bracknell Berkshire

    Details pursuant to conditions 32 (surface water drainage) and 34 (foul water drainage) of planning permission 13/01007/OUT (plots 1-37 and 65-81 of phase 5)

    Decided 7 Mar 2019 Conditions
  • 17/00166/COND Granted

    Land North Of Harvest Ride and South Of Forest Road and East Of West End Lane West End Lane Warfield Bracknell Berkshire

    Details pursuant to conditions 21 (finished floor levels) and 25 (access to each phase) of planning permission 13/01007/OUT. (Plots 1-37 and 65-81: phase 5)

    Decided 29 Aug 2018 Conditions
  • 17/00150/COND Granted

    Land North Of Harvest Ride and South Of Forest Road and East Of West End Lane West End Lane Warfield Bracknell Berkshire

    Details pursuant to conditions 02 (external materials) and 04 (cycle parking) of reserved matters approval 17/00054/REM (Phase 5)

    Decided 9 Nov 2017 Conditions
  • 17/00139/COND Granted

    Land North Of Harvest Ride and South Of Forest Road and East Of West End Lane West End Lane Warfield Bracknell Berkshire

    Details pursuant to conditions 20 (landscape management plan) and 37 (ecological management plan) of planning permission 13/01007/OUT (relates to Phases 3 and 4A)

    Decided 30 Aug 2017 Conditions
  • 17/00565/FUL Granted

    Land North Of Harvest Ride and South Of Forest Road and East Of West End Lane West End Lane Warfield Bracknell Berkshire

    Formation of access from West End Lane to serve a foul water pumping station and an above ground pressure reducing installation.

    Decided 11 Jan 2018 Full applications

Timeline

Dates from the published record

  1. 16 Apr 2018

    Received by Bracknell Forest

  2. 3 Dec 2018

    Decision issued: Approval

  3. 1 Sep 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 13/01007/OUT Granted

    Land North Of Harvest Ride and South Of Forest Road and East Of West End Lane Warfield Bracknell Berkshire RG42 2JS

    Hybrid planning application for a residential-led mixed-use development comprising: Outline planning application for up to 750 residential dwellings (with a minimum of 675 dwellings) including 60-bed senior living scheme; new two form-entry primary school; formal and informal open space; associated landscaping; works to river cut and provision of new north-south link road. (All matters reserved except for means of access to the development); andFull planning application for the development of Phase 1 at the south western corner of the site for the erection of 87 residential dwellings (87 of the 750 dwellings described above) with associated open space, parking and landscaping; creation of two new access points off Harvest Ride and provision of north-south link road between Harvest Ride and Forest Road.(Affects all properties Teasel Down/Sorrel Drive/Comfrey Heights/Betony Rise/Meadowsweet Lane/Poppy Corner)

    Decided 28 Oct 2014 Outline

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Box

5 applications on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

443 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Bracknell Forest granted permission on 3 December 2018, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About reserved matters applications

A reserved matters application fills in the detail held back from an earlier outline permission, judged against that permission rather than the principle of development. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Bracknell Forest

  • 25/00616/REM Granted

    White Gates Mushroom Castle Winkfield Row Bracknell Berkshire RG42 7PL

    Reserved Matters (Appearance, Landscaping, Layout and Scale) pursuant to outline planning permission 19/00009/OUT for the construction of 39 dwellings. The outline planning application was not an EIA application.

    9 Oct 2025 Reserved matters
  • 20/01018/REM Granted

    Land Between Mulberry and The Acre Crouch Lane Winkfield Windsor Berkshire

    Submission of reserved matters application relating to appearance, landscape and scale pursuant to outline planning permission 20/00252/OUT for the erection of two detached dwellinghouses. (An exemption for CIL self-build housing has been granted for this proposal. The applicant shall comply with the requirements in parts 54A to 54D of the CIL Regulations 2010 (as amended))

    11 Dec 2020 Reserved matters
  • 21/00004/REM Granted

    Land At Former TRL Nine Mile Ride Wokingham Berkshire RG40 3GA

    Submission of details of scale, layout, appearance, access and landscaping relating to the Phase 2 Residential phase comprising the erection of 198 dwellings, pursuant to outline planning permission 13/00575/OUT (alternative to reserved matters approval 17/01380/REM) including submission of details pursuant to condition 09 (Landscaping), 10 (Landscape Management Plan), Condition 23 (Surface Water Drainage Strategy) , Condition 24 (Surface Water Drainage) and 28 (Environmental Mitigation) of 13/00575/OUT.

    4 Jan 2021 Reserved matters
  • 19/00913/REM Granted

    White Gates Mushroom Castle Winkfield Row Bracknell Berkshire RG42 7PL

    Submission of details for Plot 1 for the erection of a dwelling with detached garage, pursuant to outline planning permision 17/00318/OUT. (An exemption for CIL self-build housing has been granted for this proposal. The applicant shall comply with the requirements in parts 54A to 54D of the CIL Regulations 2010 (as amended)

    30 Oct 2019 Reserved matters
  • 18/01010/REM Granted

    Blue Mountain Golf Club and Conference Centre Wood Lane Binfield Bracknell Berkshire RG42 4EX

    Submission of details of layout, scale, appearance and landscaping for the erection of 215 dwellings and the provision of open space, footpaths and cycleways and vehicle and cycle parking, following the demolition of Park Farm and Park Farm Cottages, pursuant to Outline Planning Permission 16/00020/OUT. (Phase 2)

    11 Oct 2018 Reserved matters