Skip to content
PlanIndex Get alerts
Menu

Planning application

92-94 Castle Lane West Bournemouth BH9 3JU

Awaiting decision Bournemouth, Christchurch and Poole P/26/04204/FUL Full Planning Permission

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Alterations to the first floor to replace a window with a glazed door and form a balcony to the main building (Part retrospective)

As published by the council, reference P/26/04204/FUL

Application record

Reference
P/26/04204/FUL
Type
Full Planning Permission
Status
Registered - Awaiting Allocation
Received
1 Sep 2026
Validated
1 Sep 2026
Ward
Moordown
Parish
Bournemouth Town Council
Decision by
Delegated
Postcode
BH9 3JU

Comment by 22 September 2026

The council is taking comments on this application until then. Comments go to Bournemouth, Christchurch and Poole through their own planning portal.

Timeline

Dates from the published record

  1. 1 Sep 2026

    Received by Bournemouth, Christchurch and Poole

  2. 7 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 27 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Bournemouth, Christchurch and Poole took a median of 60 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Bournemouth, Christchurch and Poole for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 96-98 Castle Lane West Bournemouth BH9 3JU

    P/25/04130/FUL Submitted 14 Oct 2025 0m away

    Erection of two dwellings at third floor level within a newly created additional storey.

    Refused Full applications 10 docs
    Several homes
  • 14 Priory View Place Bournemouth BH9 3JL

    P/25/04858/HOU Submitted 25 Nov 2025 50m away

    Single storey rear extension

    Granted Householder Extension 10 docs
    Small domestic
  • 1 Cox Avenue Bournemouth BH9 3LY

    P/26/01558/TTPO Submitted 7 Apr 2026 149m away

    T1- London Plane. Crown lift to 5.2m from ground level for highway clearance, by removal of secondary and tertiary branches only. Prune to provide a 2m clearance from service wires and buildings. Reduce lowest lateral branches growing over 1 Cox Avenue by 1.5m from the tips inwards, as per annotated photo.

    Granted Trees 5 docs
  • 19 Petit Road Bournemouth BH9 3JE

    P/25/05143/HOU Submitted 11 Dec 2025 178m away

    Removal of existing conservatory to be replaced with single storey rear extension. Single storey side extension and reduction in size of existing garage.

    Granted Householder Extension 10 docs
    Small domestic
  • 1 Petit Road Bournemouth BH9 3JE

    P/26/02574/CLP Submitted 3 Jun 2026 178m away

    Lawful Development Certificate for a dormer, loft extension, demolition of a wall, drop kerb and hard surfacing.

    Decided Lawful development Extension Loft or dormer +1 10 docs
  • 11 Wynford Road Bournemouth BH9 3ND

    P/26/00614/HOU Submitted 12 Feb 2026 246m away

    Proposed front and rear extensions. Roof Enlargement for first floor accommodation with side dormers.

    Granted Householder Extension Loft or dormer 8 docs
    Domestic

In Bournemouth, Christchurch and Poole

  • P/26/01726/FUL Granted

    Royal Bournemouth Hospital Castle Lane East Bournemouth BH7 7DW

    Installation of a Portakabin Building system to be used as a remote site welfare unit for ambulance crews. Involves 6 Ambulance parking bays with Vehicle shorelines and hatching.

    16 Apr 2026 Full applications
  • P/26/04285/FUL Awaiting decision

    117-119 Oakwood House West Hill Road Bournemouth BH2 5PH

    Proposed replacement flat roof and lantern

    4 Sep 2026 Full applications
  • P/26/03038/FUL Granted

    140A Stewart Road Bournemouth BH8 8NX

    New dormer window to new loft extension

    30 Jun 2026 Full applications
  • P/26/03029/FUL Granted

    13 Bure Lane Christchurch BH23 4DJ

    Demolition of the existing dwelling and construction of a replacement house with associated parking

    30 Jun 2026 Full applications
  • P/26/04216/FUL Awaiting decision

    1 Bournemouth Road Poole BH14 0EF

    Alterations to the store at the rear of the building. Repainting of windows and parapet.

    1 Sep 2026 Full applications