Planning application
Chapel Gate Circuit Chapel Gate Christchurch BH23 6BL
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Electric vehicle charging hub
As published by the council, reference P/26/00469/FUL
Application record
- Reference
- P/26/00469/FUL
- Type
- Full Planning Permission
- Status
- Application Under Consideration
- Received
- 3 Feb 2026
- Validated
- 3 Mar 2026
- Ward
- Commons
- Parish
- Hurn Parish Council
- Decision by
- Delegated
- Postcode
- BH23 6BL
Comment by 2 October 2026
The council is taking comments on this application until then. Comments go to Bournemouth, Christchurch and Poole through their own planning portal.
Timeline
Dates from the published record
-
3 Feb 2026
Received by Bournemouth, Christchurch and Poole
-
3 Mar 2026
Validated
Checked as complete and ready for consideration.
-
31 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 28 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Bournemouth, Christchurch and Poole took a median of 60 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
37 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Bournemouth, Christchurch and Poole for determination, against a statutory target of eight weeks. Over the last year Bournemouth, Christchurch and Poole decided full applications in a median of 83 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Bournemouth University Sports Campus Chapel Gate Christchurch BH23 6BL
1x oak tree -dead- fell
Granted Trees 2 docs -
Hurn Waste Transfer Station Chapel Lane Parley Christchurch BH23 6BE
76% historically approved · decision due ~1 Oct
Variation of condition 2 and 8 of planning permission 8/14/0083 Vary Condition 2 of 8/95/0283 to operate on public and bank holidays and remove consent to operate on Saturdays, except for the three Saturdays following Christmas. To change Hours of operation and Restrictions on Waste to provide more flexibility - Regulation 3 application by BCP Council
Awaiting decision Amendments 15 docs -
Land at Bournemouth Airport Enterprise Way Aviation Park West Christchurch BH23 6EW
EIA Screening Request for development of land for purposes consisting of the provision of new car parking on land at Bournemouth Airport.
Decided Outline 23 docs -
4 Enterprise Way - Aviation Park West Bournemouth Airport Christchurch BH23 6EW
Removal of Condition 8 ( Electric Vehicle Charging Points Requirement) of planning permission 8/21/1041/FUL: Extension to existing factory unit and addition to car parking
Granted Amendments Extension 12 docs -
3 Enterprise Way - Aviation Park West Bournemouth Airport Christchurch BH23 6EW
Multiple Tree Works as detailed in Schedule
Split decision Trees 5 docs
Other full applications
In Bournemouth, Christchurch and Poole
-
P/26/02224/FUL Withdrawn
48 Hillbourne Road Poole BH17 7JB
Demolish garage and side and rear extensions, sever land and erect 2 chalet bungalows with parking
-
P/26/03499/FUL Refused
Pavement o/s 39 High Street Poole BH15 1EG
Installation of a modern, multifunctional Hub unit featuring an integral advertisement display and defibrillator available for public use
-
P/26/01923/FUL Granted
30 Cooper Dean Drive Bournemouth BH8 9LN
New dormer to the rear elevation and two new Veluxes to the front and one velux on side roof. (amended)
-
P/26/01895/FUL Granted
225 Charminster Road Bournemouth BH8 9QJ
Partial Demolition, Extension and Alterations to Existing Building to Erect a 2-Bed Dwellinghouse with Associated Parking and Landscaping
-
P/26/04529/FUL Awaiting decision
355 Wimborne Road Bournemouth BH9 2AD
Alteration and conversion of first floor accommodation from commercial use (Class E) to provide 2 flats with associated bin and cycle storage. Alterations to the retained ground floor commercial unit (Class E)