Planning application
16 Carlton Road Bournemouth BH1 3TG
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Single storey extension at lower ground level to allow for existing flat to be subdivided to create an additional dwelling and erection of fencing and gates
As published by the council, reference P/25/04096/FUL
Application record
- Reference
- P/25/04096/FUL
- Type
- Full Planning Permission
- Status
- Application Approved
- Decision
- Granted
- Received
- 10 Oct 2025
- Validated
- 11 Dec 2025
- Decided
- 1 Apr 2026
- Ward
- East Cliff & Springbourne
- Decision by
- Delegated
- Postcode
- BH1 3TG
Timeline
Dates from the published record
-
10 Oct 2025
Received by Bournemouth, Christchurch and Poole
-
11 Dec 2025
Validated
Checked as complete and ready for consideration.
-
1 Apr 2026
Decision issued: Granted
-
12 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
16 Carlton Road Bournemouth BH1 3TG
76% historically approved · decision due ~1 Oct
Side dormer to create a roof space extension, enlargement to existing approved extension at basement level
Awaiting decision Full applications Extension Loft or dormer 8 docs -
5E Spencer Road Bournemouth BH1 3TE
To replace the existing garage with a replacement ancillary building to provide an Office space/Spare bedroom for Flat 5e
Granted Full applications 6 docs -
29 Vale Road Bournemouth BH1 3SX
T1. Sycamore - Remove and reduce branches by up to 2m to give a clearance of 2m from the building.
Granted Trees 4 docs -
95 Southcote Road Bournemouth BH1 3SW
Creation of an additional unit to the existing 7 bed HMO to form 8 beds (Sui Generis)
Refused Full applications 13 docs -
12 Gardens View Bournemouth BH1 3QA
Lawful Development Certificate for existing use of the property as 8 self-contained flats.
Decided Lawful development New dwelling 5 docs -
Other full applications applications
In Bournemouth, Christchurch and Poole
-
P/26/01726/FUL Granted
Royal Bournemouth Hospital Castle Lane East Bournemouth BH7 7DW
Installation of a Portakabin Building system to be used as a remote site welfare unit for ambulance crews. Involves 6 Ambulance parking bays with Vehicle shorelines and hatching.
-
P/26/04285/FUL Awaiting decision
117-119 Oakwood House West Hill Road Bournemouth BH2 5PH
Proposed replacement flat roof and lantern
-
P/26/03038/FUL Granted
140A Stewart Road Bournemouth BH8 8NX
New dormer window to new loft extension
-
P/26/03029/FUL Granted
13 Bure Lane Christchurch BH23 4DJ
Demolition of the existing dwelling and construction of a replacement house with associated parking
-
P/26/04204/FUL Awaiting decision
92-94 Castle Lane West Bournemouth BH9 3JU
Alterations to the first floor to replace a window with a glazed door and form a balcony to the main building (Part retrospective)