Skip to content
PlanIndex Get alerts
Menu

Planning application

Land At Lee Hall Platt Lane Bolton BL5 1BH

Awaiting decision Bolton 21405/25 Outline Planning Permission

Works: New dwelling Extension Major scheme

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

HYBRID PLANNING APPLICATION CONSISTING OF (1) LAND AT LEE HALL SOUTH FOR THE RESIDENTIAL DEVELOPMENT OF UP TO 1450 DWELLINGS (USE CLASS C3), CARE FACILITY (75 BEDS) (USE CLASS C2) RETAIL FACILITIES (USE CLASS E & SUI GENERIS) A PRIMARY SCHOOL (USE CLASS F1(a)) A HEALTHCARE FACILITY (USE CLASS E(e)) A COMMUNITY FACILITY (USE CLASS E(d), F2(b) and F2(c)) OPEN SPACE/ RECREATIONAL PROVISION, THE RE-ROUTING, UPGRADING AND EXTENSION OF THE PUBLIC RIGHTS OF WAY NETWORK, AND THE CREATION OF NEW PUBLIC RIGHTS OF WAY, FOOTPATHS AND TRAILS WITH ALL MATTERS RESERVED EXCEPT FOR (IN PART) ACCESS. (2) LAND AT LEE HALL NORTH FOR THE DELIVERY OF AROUND 25,000SQM GEA OF INDUSTRIAL AND WAREHOUSING FLOOR SPACE FOR USE CLASSES B2 (GENERAL INDUSTRY) B8 (STORAGE AND DISTRIBUTION) E(g)(i) OFFICE TO CARRY OUT ANY OPERATIONAL OR ADMINISTRATIVE FUNCTIONS E(g)(ii) THE RESEARCH AND DEVELOPMENT OF PRODUCTS OR PROCESSES E(g)(iii) ANY INDUSTRIAL PROCESSES AND SUI GENERIS (g) SCRAPYARD OR A YARD FOR THE STORAGE DISTRIBUTION OF MINERALS OR THE BREAKING OF MOTOR VEHICLES WITH ALL MATTERS RESERVED EXCEPT FOR (IN PART) ACCESS (3) NEW HIGHWAY INFRASTRUCTURE (PARK AVENUE) (WITH FULL DETAILS FROM THE A58-A6 (PARK AVENUE NORTH) AND A6 - PLATT LANE (PARK AVENUE CENTRAL) WITH OUTLINE FOR THE REMAINING SECTION (PARK AVENUE SOUTH)

As published by the council, reference 21405/25

Application record

Reference
21405/25
Type
Outline Planning Permission
Status
Deposited
Received
17 Nov 2025
Validated
17 Nov 2025
Ward
Historic Record
Parish
Westhoughton Town Council
Postcode
BL5 1BH

Timeline

Dates from the published record

  1. 17 Nov 2025

    Received by Bolton

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 12 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Bolton took a median of 59 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Peel L&P Investments Applicant

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

326 documents on file for this application

  • NATIONAL HIGHWAYS - HOLDING RECOMMENDATION Consultee Comment · 18 Aug 2026
  • National Highways - holding recommendation Consultee Comment · 28 Jul 2026
  • National Highways - holding recommendation Consultee Comment · 03 Jul 2026
  • UNITED UTILITIES Consultation · 19 Jun 2026
  • Active Travel England Consultee Comment · 26 May 2026
  • Environment Agency Comments Consultee Comment · 26 May 2026
  • Natural England Consultee Comment · 22 May 2026
  • National Highways - holding recommendation Consultee Comment · 22 May 2026
  • PROW Comment Consultee Comment · 21 May 2026
  • The Garden Trust Consultee Comment · 21 May 2026
  • GMAAS (Archaeology) Consultee Comment · 20 May 2026
  • Transport Note - Phasing of Devt & Park Ave Application Submission Details · 19 May 2026
  • Strategic Housing Consultee Comment · 14 May 2026
  • Coal Authority Consultee Comment · 14 May 2026
  • Historic England Consultee Comment · 08 May 2026
  • Peak and Northern Footpath Society Consultee Comment · 08 May 2026
  • HSE Comments Consultee Comment · 07 May 2026
  • Applicant's response to UU comments Correspondence · 06 May 2026
  • Cover letter (with amended plans) Application Submission Details · 06 May 2026
  • Parameters Plan Amended Drawing · 06 May 2026
  • Illustrative Phasing Plan Amended Drawing · 06 May 2026
  • Illustrative Masterplan Amended Drawing · 06 May 2026
  • Illustrative Landscape Masterplan Amended Drawing · 06 May 2026
  • Public Right of Way Strategy Amended Drawing · 06 May 2026
  • Design & Access Statement Application Submission Details · 06 May 2026
  • Flood Risk Assessment & Drainage Strategy Application Submission Details · 06 May 2026
  • Figure 12.1.6: Viewpoint 6 Application Submission Details · 06 May 2026
  • Future Year Net Stats Application Submission Details · 23 Apr 2026
  • ITM19495 Application Submission Details · 23 Apr 2026
  • Transport consultant responses to WSP comments Application Submission Details · 23 Apr 2026
  • Pupil Place Planning (Children's Services) Consultee Comment · 22 Apr 2026
  • National Highways - holding recommendation Consultee Comment · 21 Apr 2026
  • Transport Note - 15 April 2026 Application Submission Details · 21 Apr 2026
  • United Utilities Consultee Comment · 09 Apr 2026
  • TfGM Consultee Comment · 07 Apr 2026
  • ECO COMMENTS Consultee Comment · 01 Apr 2026
  • Westhoughton Town Council Consultee Comment · 20 Mar 2026
  • Education Consultee Comment · 18 Mar 2026
  • M61 J5 Stage 1 Road Safety Audit Application Submission Details · 18 Mar 2026
  • Technical Note - Response to TfGM Application Submission Details · 18 Mar 2026
  • Committed development summary Application Submission Details · 16 Mar 2026
  • VISSIM AM Base model Max Queues Application Submission Details · 16 Mar 2026
  • VISSIM PM Base model Max Queues Application Submission Details · 16 Mar 2026
  • Technical Note - Response to Active Travel England Application Submission Details · 16 Mar 2026
  • Planning Statement Addendum - Consideration of Affordable Housing Tenure Split Application Submission Details · 05 Mar 2026
  • Planning Statement Addendum - Consideration of Density Application Submission Details · 05 Mar 2026
  • Affordable Housing Tenure Mix Briefing Note Application Submission Details · 05 Mar 2026
  • . Flood Risk Team. Consultee Comment · 03 Mar 2026
  • Drainage Officers Consultee Comment · 03 Mar 2026
  • Housing Standards Consultee Comment · 03 Mar 2026
  • Draft S106 Heads of Teams Application Submission Details · 03 Mar 2026
  • Children's Services (Education) Consultee Comment · 02 Mar 2026
  • Lancashire Wildlife Trust Consultee Comment · 02 Mar 2026
  • Active Travel England Consultee Comment · 02 Mar 2026
  • ENVIRONMENTAL AGENCY Consultee Comment · 27 Feb 2026
  • The Gardens Trust Consultee Comment · 26 Feb 2026
  • NATURAL ENGLAND Consultee Comment · 26 Feb 2026
  • HISTORIC ENGLAND Consultee Comment · 25 Feb 2026
  • AECOM VISSIM Review Consultee Comment · 25 Feb 2026
  • Technical Note - Impact on Holcroft Moss Application Submission Details · 25 Feb 2026
  • National Highways - holding recommendation Consultee Comment · 24 Feb 2026
  • GMCA Minerals & Waste Consultee Comment · 24 Feb 2026
  • Response to Westhoughton Town Council Application Submission Details · 13 Feb 2026
  • Cadent Gas Consultee Comment · 13 Feb 2026
  • Parameters Plan Amended Drawing · 12 Feb 2026
  • Applicant's response to Children's Service's comments Application Submission Details · 12 Feb 2026
  • HSE Consultee Comment · 12 Feb 2026
  • Illustrative Masterplan Amended Drawing · 12 Feb 2026
  • COAL AUTHORITY COMMENT Consultee Comment · 12 Feb 2026
  • Greater Manchester Archaeological Advisory Service Consultee Comment · 11 Feb 2026
  • Health and Safety Executive Consultee Comment · 10 Feb 2026
  • Applicant's response to LWT comments Application Submission Details · 10 Feb 2026
  • Chapter 1 - 5 Environmental Impact Assessment · 09 Feb 2026
  • Chapter 6 Socio Economics & Human Health Environmental Impact Assessment · 09 Feb 2026
  • Chapter 7 Biodiversity Environmental Impact Assessment · 09 Feb 2026
  • Chapter 8 Geology Environmental Impact Assessment · 09 Feb 2026
  • Chapter 9 Surface Water Environmental Impact Assessment · 09 Feb 2026
  • Chapter 10 Archaeology Environmental Impact Assessment · 09 Feb 2026
  • CHAPTER 11 BUILT HERITAGE Environmental Impact Assessment · 09 Feb 2026
  • Chapter 12 Landscape & Visual Environmental Impact Assessment · 09 Feb 2026
  • Chapter 13 Traffic and Transport Environmental Impact Assessment · 09 Feb 2026
  • Chapter 14 Air Quality Environmental Impact Assessment · 09 Feb 2026
  • Chapter 15 Noise & Vibration Environmental Impact Assessment · 09 Feb 2026
  • Chapter 16 Climate Change Environmental Impact Assessment · 09 Feb 2026
  • Chapter 17 Summary & Residual Environmental Impact Assessment · 09 Feb 2026
  • Crime Impact Statement Application Submission Details · 09 Feb 2026
  • Contents Page (final) Environmental Impact Assessment · 09 Feb 2026
  • Appendix 01.1 Location of information within ES Environmental Impact Assessment · 09 Feb 2026
  • Appendix 01.2 Statement of Expertise Environmental Impact Assessment · 09 Feb 2026
  • Appendix 02.1 Scoping Re Part 1port Environmental Impact Assessment · 09 Feb 2026
  • Appendix 02.1 Scoping Report Part 2 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 2.2 Scoping Opinion Environmental Impact Assessment · 09 Feb 2026
  • Appendix 7.1 Desk Based Assessment Environmental Impact Assessment · 09 Feb 2026
  • APPENDIX 7.2 HABITAT ASSESSMENT Environmental Impact Assessment · 09 Feb 2026
  • Appendix 7.3 Arboriculture Impact Assessment Part 1 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 7.3 Arboriculture Impact Assessment Part 2 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 7.4 Hedgerow Regulations Assessment Environmental Impact Assessment · 09 Feb 2026
  • Appendix 7.5 Protected Species Report - Amphibians Environmental Impact Assessment · 09 Feb 2026
  • APPENDIX 7.8 PROTECTED SPECIES REPORT - BREEDING BIRDS Environmental Impact Assessment · 09 Feb 2026
  • APPENDIX 7.9 PROTECTED SPECIES REPORT - WINTERING BIRDS Environmental Impact Assessment · 09 Feb 2026
  • APPENDIX 7.10 PROTECTED SPECIES REPORT - WILLOW TIT Environmental Impact Assessment · 09 Feb 2026
  • Appendix 7.11 Protected Species Report - Water voles Environmental Impact Assessment · 09 Feb 2026
  • Appendix 8.1 Stage 1 Tier 1 Assessment Part 1 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 9.2 WFD Assessment Environmental Impact Assessment · 09 Feb 2026
  • Appendix 9.3 HEWRAT Assessment Environmental Impact Assessment · 09 Feb 2026
  • Appendix 9.4 Utility Feasibility Report Part 1 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 9.4 Utility Feasibility Report Part 2 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 9.4 Utility Feasibility Report Part 3 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 9.4 Utility Feasibility Report Part 4 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 9.4 Utility Feasibility Report Part 5 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 9.4 Utility Feasibility Report Part 6 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 9.4 Utility Feasibility Report Part 7 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 10.1 Archaeological Desk Based Assessment Part 2 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 10.1 Archaeological Desk Based Assessment Part 1 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 11.1 Heritage Impact Assessment Environmental Impact Assessment · 09 Feb 2026
  • Appendix 11.2 Embankment Mitigation Framework Environmental Impact Assessment · 09 Feb 2026
  • Appendix 13.1 TA Part 1 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 13.1 TA Part 2 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 13.1 TA Part 3 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 13.1 TA Part 4 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 13.1 TA Part 5 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 13.1 TA Part 6 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 13.2 Framework Travel Plan - Mixed Uses Environmental Impact Assessment · 09 Feb 2026
  • Appendix 13.2 Framework Travel Plan - Communities Environmental Impact Assessment · 09 Feb 2026
  • Appendix 13.2 Framework Travel Plan - Employment Environmental Impact Assessment · 09 Feb 2026
  • Appendix 13.3 Full Construction Traffic Flows Environmental Impact Assessment · 09 Feb 2026
  • Appendix 13.4 Proposed Development Operational Traffic Flows Environmental Impact Assessment · 09 Feb 2026
  • Appendix 13.5 Lee Hall & Partial Park Ave Operational Traffic Flows Environmental Impact Assessment · 09 Feb 2026
  • Appendix 13.6 Ryder Cup Traffic Flows Environmental Impact Assessment · 09 Feb 2026
  • Appendix 13.7 Cumulative Development Traffic Flows Environmental Impact Assessment · 09 Feb 2026
  • Appendix 7.7 Protected Species Report - Bats Environmental Impact Assessment · 09 Feb 2026
  • Appendix 8.1 Stage 1 Tier 1 Assessment Part 2 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 8.1 Stage 1 Tier 1 Assessment Part 3 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 8.1 Stage 1 Tier 1 Assessment Part 4 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 8.1 Stage 1 Tier 1 Assessment Part 5 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 8.1 Stage 1 Tier 1 Assessment Part 6 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 8.1 Stage 1 Tier 1 Assessment Part 7 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 8.1 Stage 1 Tier 1 Assessment Part 8 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 8.1 Stage 1 Tier 1 Assessment Part 9 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 8.1 Stage 1 Tier 1 Assessment Part 10 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 8.1 Stage 1 Tier 1 Assessment Part 11 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 8.2 Coal Mining Risk Assessment Part 1 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 8.2 Coal Mining Risk Assessment Part 2 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 8.2 Coal Mining Risk Assessment Part 3 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 8.2 Coal Mining Risk Assessment Part 4 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 8.2 Coal Mining Risk Assessment Part 5 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 8.2 Coal Mining Risk Assessment Part 6 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 8.2 Coal Mining Risk Assessment Part 7 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 8.2 Coal Mining Risk Assessment Part 8 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 8.3 Mineral Safeguarding Report Environmental Impact Assessment · 09 Feb 2026
  • Appendix 9.1 FRA & Drainage Strategy Environmental Impact Assessment · 09 Feb 2026
  • Figure 1.1 Site Location Plan Environmental Impact Assessment · 09 Feb 2026
  • Figure 7.1 Designated Sites within 10km of Site Environmental Impact Assessment · 09 Feb 2026
  • Figure 7.2 Non-Designated Sites within 2km Environmental Impact Assessment · 09 Feb 2026
  • Figure 7.3 Baseline UK Habitats Environmental Impact Assessment · 09 Feb 2026
  • Figure 7.4 Hedgerow Status Environmental Impact Assessment · 09 Feb 2026
  • Figure 7.5 Great Crested Newt Survey Results Environmental Impact Assessment · 09 Feb 2026
  • Figure 7.6 Ponds with Great Crested Newts Environmental Impact Assessment · 09 Feb 2026
  • Figure 7.8 Preliminary Roost Assessment Environmental Impact Assessment · 09 Feb 2026
  • Figure 7.9 Surveyor Location Plan Environmental Impact Assessment · 09 Feb 2026
  • Figure 7.10 Ground Level Tree Assessment Result Environmental Impact Assessment · 09 Feb 2026
  • FIGURE 7.11 NIGHT-TIME BAT WALKOVER - VISIT 1 Environmental Impact Assessment · 09 Feb 2026
  • FIGURE 7.12 NIGHT-TIME BAT WALKOVER - VISIT 2 Environmental Impact Assessment · 09 Feb 2026
  • Figure 7.13 Bat transect route & static detector locations Environmental Impact Assessment · 09 Feb 2026
  • Figure 7.14 Breeding bird survey - visit 1 10 May 2024 Environmental Impact Assessment · 09 Feb 2026
  • Figure 7.15 Breeding bird survey - visit 2 15 May 2024 Environmental Impact Assessment · 09 Feb 2026
  • Figure 7.16 Breeding bird survey - visit 3 22 May 2024 Environmental Impact Assessment · 09 Feb 2026
  • Figure 7.17 Breeding bird survey - visit 4 13 June 2024 Environmental Impact Assessment · 09 Feb 2026
  • Figure 7.19 Breeding bird survey - visit 6 2 July 2024 Environmental Impact Assessment · 09 Feb 2026
  • Figure 7.20 Winter bird transect survey - visit 1 17.10.24 Environmental Impact Assessment · 09 Feb 2026
  • Figure 7.21 Winter bird transect survey - visit 2 20.11.24 Environmental Impact Assessment · 09 Feb 2026
  • Figure 7.22 Willow tit survey - visit 1 28.02.25 Environmental Impact Assessment · 09 Feb 2026
  • Figure 7.23 Willow tit survey - visit 2 13.03.25 Environmental Impact Assessment · 09 Feb 2026
  • Figure 7.24 Water vole survey results Environmental Impact Assessment · 09 Feb 2026
  • Figure 9.1 Surface water features and their attributes Environmental Impact Assessment · 09 Feb 2026
  • Figure 10.1 Designated assets within 1km Environmental Impact Assessment · 09 Feb 2026
  • Figure 10.2 Non-designated heritage assets within 1km Environmental Impact Assessment · 09 Feb 2026
  • Figure 10.3 Non-designated heritage assets (points) within 1km Environmental Impact Assessment · 09 Feb 2026
  • Figure 13.1 EAU Transport & Movement Study Area Environmental Impact Assessment · 09 Feb 2026
  • Figure 14.1 Construction Risk Zones & Receptor Identification Environmental Impact Assessment · 09 Feb 2026
  • Figure 14.2 Site Location & Receptor Identification Environmental Impact Assessment · 09 Feb 2026
  • Figure 15.1 COnstruction Parcels NSRs, MPs Environmental Impact Assessment · 09 Feb 2026
  • Figure 15.2 Extent of Road Traffic Model Environmental Impact Assessment · 09 Feb 2026
  • NON-TECHNICAL SUMMARY Environmental Impact Assessment · 09 Feb 2026
  • Appendix 12.1 Site Photographs Environmental Impact Assessment · 09 Feb 2026
  • Appendix 12.2 Landscape Baseline Environmental Impact Assessment · 09 Feb 2026
  • Appendix 12.3 Detailed Landscape Assessment Environmental Impact Assessment · 09 Feb 2026
  • Appendix 12.4 Detailed Visual Assessment Environmental Impact Assessment · 09 Feb 2026
  • Appendix 12.5 Mapped Figures 1 of 3 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 12.5 Mapped Figures 2 of 3 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 12.5 Mapped Figures 3 of 3 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 12.6 Visualisations 1 of 7 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 12.6 Visualisations 2 of 7 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 12.6 Visualisations 3 of 7 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 12.6 Visualisations 4 of 7 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 12.6 Visualisations 5 of 7 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 12.6 Visualisations 6 of 7 Environmental Impact Assessment · 09 Feb 2026
  • Appendix 12.6 Visualisations 7 of 7 Environmental Impact Assessment · 09 Feb 2026
  • Cover Letter with amended plans Application Submission Details · 09 Feb 2026
  • Site Location Plan Amended Drawing · 09 Feb 2026
  • Demolition Plan Amended Drawing · 09 Feb 2026
  • PARAMETERS PLAN (SUPERSEDED) Amended Drawing · 09 Feb 2026
  • Response to Gardens Trust comments Application Submission Details · 02 Feb 2026
  • Landscape Officers Consultee Comment · 02 Feb 2026
  • National Highways - holding recommendation Consultee Comment · 02 Feb 2026
  • NHS GM ICB Consultee Comment · 02 Feb 2026
  • Cadent Gas - holding objection Consultee Comment · 27 Jan 2026
  • Cadent Gas - attachment (plans) Consultee Comment · 27 Jan 2026
  • Cadent Gas - attachment (map) Consultee Comment · 27 Jan 2026
  • HSE ASSESSMENT (SOUTH) Consultee Comment · 22 Jan 2026
  • HSE assessment (North) Consultee Comment · 22 Jan 2026
  • Technical Statement - 5yr HLS (from applicant) Application Submission Details · 13 Jan 2026
  • Cover Letter - for updated 5yr HLS report Application Submission Details · 13 Jan 2026
  • Wigan Council Consultee Comment · 09 Jan 2026
  • Transport for Greater Manchester Consultee Comment · 06 Jan 2026
  • Commissioning - Age Well Team Consultee Comment · 31 Dec 2025
  • National Highways - holding recommendation Consultee Comment · 30 Dec 2025
  • CHILDREN'S SERVICES (EDUCATION) Consultee Comment · 24 Dec 2025
  • Active Travel England Consultee Comment · 15 Dec 2025
  • The Gardens Trust Consultee Comment · 15 Dec 2025
  • GMAAS (Archaeology) Consultee Comment · 11 Dec 2025
  • Lancashire Wildlife Trust Consultee Comment · 11 Dec 2025
  • Landscape Officers Consultee Comment · 10 Dec 2025
  • Mrs Jayne McGill Consultee Comment · 09 Dec 2025
  • Historic England Consultee Comment · 09 Dec 2025
  • Westhoughton Town Council Consultee Comment · 09 Dec 2025
  • Environmental Agency Consultee Comment · 08 Dec 2025
  • Coal Authority Consultee Comment · 04 Dec 2025
  • Natural England Consultee Comment · 03 Dec 2025
  • Mr Andrew Smith Consultee Comment · 03 Dec 2025
  • Mr Andrew Smith Consultee Comment · 03 Dec 2025
  • GMCA - MINERALS & WASTE Consultee Comment · 03 Dec 2025
  • Neighbour Consultation Plan Other · 21 Nov 2025
  • Acknowledgement from Wigan Council Consultee Comment · 21 Nov 2025
  • ECONOMIC STRATEGY Consultee Comment · 21 Nov 2025
  • Health and Safety Executive Consultee Comment · 21 Nov 2025
  • TRANSPORT ASSESSMENT 1 Application Submission Details · 19 Nov 2025
  • TRANSPORT ASSESSMENT 2 Application Submission Details · 19 Nov 2025
  • TRANSPORT ASSESSMENT 3 Application Submission Details · 19 Nov 2025
  • COAL MINING RISK ASSESSMENT 5 Application Submission Details · 19 Nov 2025
  • COAL MINING RISK ASSESSMENT 4 Application Submission Details · 19 Nov 2025
  • COAL MINING RISK ASSESSMENT 3 Application Submission Details · 19 Nov 2025
  • COAL MINING RISK ASSESSMENT 2 Application Submission Details · 19 Nov 2025
  • COAL MINING RISK ASSESSMENT 1 Application Submission Details · 19 Nov 2025
  • STAGE 1 TIER 1 ASSESSMENT 3 Application Submission Details · 19 Nov 2025
  • STAGE 1 TIER 1 ASSESSMENT 2 Application Submission Details · 19 Nov 2025
  • STAGE 1 TIER 1 ASSESSMENT 1 Application Submission Details · 19 Nov 2025
  • UTILITY FEASABILITY REPORT Application Submission Details · 19 Nov 2025
  • ARBORICULTURAL IMPACT ASSESSMENT 7 Application Submission Details · 19 Nov 2025
  • ARBORICULTURAL IMPACT ASSESSMENT 6 Application Submission Details · 19 Nov 2025
  • ARBORICULTURAL IMPACT ASSESSMENT 5 Application Submission Details · 19 Nov 2025
  • ARBORICULTURAL IMPACT ASSESSMENT 4 Application Submission Details · 19 Nov 2025
  • ARBORICULTURAL IMPACT ASSESSMENT 3 Application Submission Details · 19 Nov 2025
  • ARBORICULTURAL IMPACT ASSESSMENT 2 Application Submission Details · 19 Nov 2025
  • ARBORICULTURAL IMPACT ASSESSMENT 1 Application Submission Details · 19 Nov 2025
  • LINK ROAD SECTIONS Application Submission Details · 17 Nov 2025
  • PARAMETERS PLAN (SUPERSEDED) Application Submission Details · 17 Nov 2025
  • ILLUSTRATIVE PHASING PLAN 3 Application Submission Details · 17 Nov 2025
  • ILLUSTRATIVE MASTERPLAN 1 (SUPERSEDED) Application Submission Details · 17 Nov 2025
  • DEMOLITION PLAN (SUPERSEDED) Application Submission Details · 17 Nov 2025
  • SITE LOCATION PLAN (SUPERSEDED) Application Submission Details · 17 Nov 2025
  • DESIGN AND ACCESS STATEMENT Application Submission Details · 17 Nov 2025
  • OUTLINE PLANT SCHEDULE AND SPECIFICATION Application Submission Details · 17 Nov 2025
  • CHEQUERBENT EMBANKMENT MITIGATION FRAMEWORK Application Submission Details · 17 Nov 2025
  • PUBLIC RIGHT OF WAY STRATEGY Application Submission Details · 17 Nov 2025
  • RIVER CONDITION ASSESSMENT REPORT Application Submission Details · 17 Nov 2025
  • ENVIRONMENTAL NOISE ASSESSMENT Application Submission Details · 17 Nov 2025
  • LEE HALL ALC Application Submission Details · 17 Nov 2025
  • LEE HALL HEALTH IMPACT ASSESSMENT Application Submission Details · 17 Nov 2025
  • ECONOMIC AND SOCIAL BENEFITS STATEMENT - EMPLOYMENT AND SKILLS PLAN Application Submission Details · 17 Nov 2025
  • DRAFT HEADS OF TERMS FINAL Application Submission Details · 17 Nov 2025
  • BIODIVERSITY NET GAIN Application Submission Details · 17 Nov 2025
  • M61 JUNCTION 5 - TRANSPORT PROPOSED WIDENING Application Submission Details · 17 Nov 2025
  • EMPLOYMENT TRAVEL PLAN Application Submission Details · 17 Nov 2025
  • MIXED USES TRAVEL PLAN Application Submission Details · 17 Nov 2025
  • RESIDENTIAL TRAVEL PLAN Application Submission Details · 17 Nov 2025
  • APPLICATION FORM REDACTED Application Form · 17 Nov 2025
  • STATEMENT OF COMMUNITY ENGAGEMENT Application Submission Details · 17 Nov 2025
  • EDUCATION ASSESSMENT Application Submission Details · 17 Nov 2025
  • ARCHAEOLOGICAL DESK BASED ASSESSMENT Application Submission Details · 17 Nov 2025
  • ALTERNATIVE DRAINAGE STRATEGY Application Submission Details · 17 Nov 2025
  • PARK AVENUE DRAINAGE LAYOUT Application Submission Details · 17 Nov 2025
  • PARK AVENUE DRAINAGE LAYOUT 4 Application Submission Details · 17 Nov 2025
  • PARK AVENUE DRAINAGE LAYOUT 2 Application Submission Details · 17 Nov 2025
  • PARK AVENUE DRAINAGE LAYOUT 3 Application Submission Details · 17 Nov 2025
  • PARK AVENUE CENTRAL DRAINAGE LAYOUT Application Submission Details · 17 Nov 2025
  • PARK AVENUE CENTRAL DRAINAGE LAYOUT 2 Application Submission Details · 17 Nov 2025
  • PARK AVENUE CENTRAL DRAINAGE LAYOUT 3 Application Submission Details · 17 Nov 2025
  • PARK AVENUE CENTRAL DRAINAGE LAYOUT 4 Application Submission Details · 17 Nov 2025
  • PARK AVENUE SOUTH DRAINAGE LAYOUT Application Submission Details · 17 Nov 2025
  • PARK AVENUE SOUTH DRAINAGE LAYOUT 2 Application Submission Details · 17 Nov 2025
  • PARK AVENUE SOUTH DRAINAGE LAYOUT 3 Application Submission Details · 17 Nov 2025
  • PARK AVENUE SOUTH TYPICAL CROSS SECTIONS Application Submission Details · 17 Nov 2025
  • PARK AVENUE NORTH GENERAL ARRANGEMENT Application Submission Details · 17 Nov 2025
  • PARK AVENUE NORTH GENERAL ARRANGEMENT 2 Application Submission Details · 17 Nov 2025
  • PARK AVENUE NORTH GENERAL ARRANGEMENT 3 Application Submission Details · 17 Nov 2025
  • PARK AVENUE NORTH GENERAL ARRANGEMENT 4 Application Submission Details · 17 Nov 2025
  • PARK AVENUE NORTH RETAINING WALLS Application Submission Details · 17 Nov 2025
  • PARK AVENUE NORTH MILL DAM STREAM CULVERT Application Submission Details · 17 Nov 2025
  • PARK AVENUE NORTH AQUEDUCT NORTHERN CROSSING Application Submission Details · 17 Nov 2025
  • PARK AVENUE NORTH AQUEDUCT SOUTHERN CROSSING Application Submission Details · 17 Nov 2025
  • PARK AVENUE NORTH MILL DAM STREAM BRIDGE Application Submission Details · 17 Nov 2025
  • PARK AVENUE NORTH TYPICAL CROSS SECTIONS Application Submission Details · 17 Nov 2025
  • PARK AVENUE NORTH LONGITUDINAL SECTION Application Submission Details · 17 Nov 2025
  • PARK AVENUE CENTRAL GENERAL ARRANGEMENT 1 Application Submission Details · 17 Nov 2025
  • PARK AVENUE CENTRAL GENERAL ARRANGEMENT 2 Application Submission Details · 17 Nov 2025
  • PARK AVENUE CENTRAL GENERAL ARRANGEMENT 3 Application Submission Details · 17 Nov 2025
  • PARK AVENUE CENTRAL GENERAL ARRANGEMENT 4 Application Submission Details · 17 Nov 2025
  • PARK AVENUE CENTRAL CROSS SECTIONS Application Submission Details · 17 Nov 2025
  • PARK AVENUE CENTRAL LONGITUDINAL SECTION Application Submission Details · 17 Nov 2025
  • FRA AND DRAINAGE STRATEGY Application Submission Details · 17 Nov 2025
  • MINERAL SAFEGUARDING REPORT Application Submission Details · 17 Nov 2025
  • NORTH AND SOUTH LIGHTING ASSESSMENT Application Submission Details · 17 Nov 2025
  • ILLUSTRATIVE MASTERPLAN 2 Application Submission Details · 17 Nov 2025
  • LEE HALL ENERGY AND CARBON STATEMENT Application Submission Details · 17 Nov 2025
  • PROPOSED WIDENING OF A58 WIGAN ROAD MITIGATION SCHEME Application Submission Details · 17 Nov 2025
  • A58 PARK ROAD/LEIGH ROAD MITIGATION SCHEME Application Submission Details · 17 Nov 2025
  • HERITAGE STATEMENT Application Submission Details · 17 Nov 2025
  • PARK ROAD/PLATT TURNING PLAN Application Submission Details · 17 Nov 2025
  • CHEQUERBENT ROUNDABOUT TRAVEL PLAN Application Submission Details · 17 Nov 2025
  • FOUR LANE ENDS MITIGATION SCHEME Application Submission Details · 17 Nov 2025
  • BNG METRIC Application Submission Details · 17 Nov 2025
  • AIR QUALITY ASSESSMENT Application Submission Details · 17 Nov 2025
  • PLANNING STATEMENT Application Submission Details · 17 Nov 2025
  • COVER LETTER Application Submission Details · 17 Nov 2025
  • Email with transport notes Correspondence · 01 Jan 1900

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Bolton for determination, against a statutory target of eight weeks. Over the last year Bolton's median decision took 59 days. More in our guide to how long planning decisions take.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Bolton

  • 00173/26 Granted

    Shepherd Cross Street Industrial Estate Shepherd Cross Street Bolton BL1 3DE

    OUTLINE APPLICATION FOR DEMOLITION OF EXISTING UNIT 6 AND THE ERECTION OF NEW INDUSTRIAL UNIT (ACCESS, APPEARANCE, LAYOUT AND SCALE DETAILS ONLY).

    4 Feb 2026 Outline
  • 00796/26 Granted

    Land To East Of Scholars Rise Scholars Rise Bolton

    APPLICATION FOR PERMISSION IN PRINCIPLE FOR ERECTION OF 1 NO. DWELLING

    30 Apr 2026 Outline
  • 21222/25 Granted

    Unit 1 Shepherd Cross Street Industrial Estate Shepherd Cross Street Bolton BL1 3DE

    OUTLINE APPLICATION FOR DEMOLITION OF EXISTING BUILDING AT UNIT 1 AND CONSTRUCTION OF 4 NO. INDUSTRIAL UNITS (ACCESS, APPEARANCE, LAYOUT AND SCALE DETAILS ONLY)

    15 Oct 2025 Outline
  • 00752/26 Granted

    Tesco Superstore Mansell Way Bolton BL6 6JS

    PRIOR APPROVAL APPLICATION FOR INSTALLATION OF SOLAR PHOTOVOLTAIC EQUIPMENT ON THE ROOF.

    23 Apr 2026 Outline
  • 00504/26 Refused

    Land Adjacent Hawthorn Cottage Little Scotland Bolton BL6 5LW

    PERMISSION IN PRINCIPLE FOR THE ERECTION OF 2NO. DWELLINGS

    19 Mar 2026 Outline