Skip to content
PlanIndex Get alerts
Menu

Planning application

73 Deansgate Bolton BL1 1HQ

Awaiting decision Bolton 01328/26

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

INSTALLATION OF COMBINED DEFIBRILLATOR AND BLEED KIT CABINET TO EXTERNAL WALL

As published by the council, reference 01328/26

Application record

Reference
01328/26
Status
Deposited
Received
20 Jul 2026
Validated
21 Jul 2026
Ward
Queens Park & Central
Postcode
BL1 1HQ

Timeline

Dates from the published record

  1. 20 Jul 2026

    Received by Bolton

  2. 21 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 15 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Bolton took a median of 59 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

A&Q Partnership (London) Ltd Agent, registered in London

Active · incorporated 1992 · London

142 applications on PlanIndex · across 91 councils · 99% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Nationwide Building Society Applicant

55 applications on PlanIndex · across 39 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

  • Pollution Control Consultee Comment · 24 Jul 2026
  • Highways Engineering Consultee Comment · 24 Jul 2026
  • EXISTING SITE PLAN Application Submission Details · 22 Jul 2026
  • EXISTING FRONT ELEVATION Amended Drawing · 22 Jul 2026
  • PROPOSED FRONT ELEVATION Amended Drawing · 22 Jul 2026
  • HERITAGE STATEMENT Application Submission Details · 22 Jul 2026
  • Neighbour Consultation Plan Other · 22 Jul 2026
  • APPLICATION FORM REDACTED Application Form · 20 Jul 2026
  • LOCATION PLAN Application Submission Details · 20 Jul 2026
  • PROPOSED SITE PLAN Application Submission Details · 20 Jul 2026
  • PLANNING STATEMENT Application Submission Details · 20 Jul 2026
  • CABINET DETAILS Application Submission Details · 20 Jul 2026
  • DUAL BLEEDKIT AND DEFIBRILLATOR Application Submission Details · 20 Jul 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Bolton for determination, against a statutory target of eight weeks. Over the last year Bolton's median decision took 59 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Bolton's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • Ground Floor 45 - 47 Deansgate Bolton BL1 1HQ

    01071/26 Submitted 10 Jun 2026 0m away

    INSTALLATION OF 1 NO. ILLUMINATED DIGITAL DISPLAY SCREEN

    Granted 5 docs
  • 26 Deansgate Bolton BL1 1BG

    01593/26 Submitted 2 Sep 2026 38m away

    82% historically approved · decision due ~28 Oct

    PRIOR APPROVAL APPLICATION FOR CHANGE OF USE FROM VACANT FIRST AND SECOND FLOOR TO 24 NO. APARTMENTS

    Awaiting decision New dwelling 25 docs
    Major scheme
  • RBS 46 - 48 Deansgate Bolton BL1 1BH

    11297/21 Submitted 17 May 2021 54m away

    APPLICATION TO REPLACE 2No BOILERS AND FLUE, OVERHAUL PLANT ROOM INCLUDING ASSOCIATED EQUIPMENT PUMPS, PRESSURE VESSEL, VALVES AND RADIATORS, CONTROL MODIFICATIONS AND INSTALL NEW AIR CONDITIONING UNITS TO SECOND FLOOR.

    Granted Full applications 16 docs
  • RBS 46 - 48 Deansgate Bolton BL1 1BH

    11298/21 Submitted 17 May 2021 54m away

    LISTED BUILDING CONSENT TO REPLACE 2No BOILERS AND FLUE, OVERHAUL PLANT ROOM INCLUDING ASSOCIATED EQUIPMENT PUMPS, PRESSURE VESSEL, VALVES AND RADIATORS, CONTROL MODIFICATIONS AND INSTALL NEW AIR CONDITIONING UNITS TO SECOND FLOOR.

    Granted Heritage and listed buildings 16 docs
  • Unit 2 Victoria Plaza Oxford Street Bolton BL1 1RD

    01532/26 Submitted 20 Aug 2026 55m away

    82% historically approved · decision due ~15 Oct

    INSTALLATION OF 1 NO. AIR CONDITIONING UNIT, SATELLITE DISH AND ASSOCIATED DUCT WORK TO ROOF

    Awaiting decision 14 docs
  • 12-16 Corporation Street Bolton BL1 2AN

    14747/22 Submitted 3 Oct 2022 59m away

    INSTALLATION OF A NEW SHOP FRONT TO EXISTING GROUND FLOOR RETAIL UNIT AND PROVISION OF A SEPARATE ENTRANCE TO THE UPPER FLOOR ACCOMMODATION TOGETHER WITH THE CHANGE OF USE OF THE FIRST AND SECOND FLOORS TO 4 No. APARTMENTS AND ASSOCIATED EXTERNAL ALTERATIONS.

    Granted Full applications New dwelling Windows or glazing 11 docs
    Several homes