Planning application
RBS 46 - 48 Deansgate Bolton BL1 1BH
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
APPLICATION TO REPLACE 2No BOILERS AND FLUE, OVERHAUL PLANT ROOM INCLUDING ASSOCIATED EQUIPMENT PUMPS, PRESSURE VESSEL, VALVES AND RADIATORS, CONTROL MODIFICATIONS AND INSTALL NEW AIR CONDITIONING UNITS TO SECOND FLOOR.
As published by the council, reference 11297/21
Application record
- Reference
- 11297/21
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Approve subject to conditions
- Received
- 17 May 2021
- Validated
- 10 Jun 2021
- Decided
- 4 Aug 2021
- Ward
- Queens Park & Central
- Decision by
- Delegated Decision
- Postcode
- BL1 1BH
Timeline
Dates from the published record
-
17 May 2021
Received by Bolton
-
10 Jun 2021
Validated
Checked as complete and ready for consideration.
-
4 Aug 2021
Decision issued: Approve subject to conditions
-
7 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice
52 applications on PlanIndex · across 34 councils · 96% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
RBS 46 - 48 Deansgate Bolton BL1 1BH
LISTED BUILDING CONSENT TO REPLACE 2No BOILERS AND FLUE, OVERHAUL PLANT ROOM INCLUDING ASSOCIATED EQUIPMENT PUMPS, PRESSURE VESSEL, VALVES AND RADIATORS, CONTROL MODIFICATIONS AND INSTALL NEW AIR CONDITIONING UNITS TO SECOND FLOOR.
Granted Heritage and listed buildings 16 docs -
26 Deansgate Bolton BL1 1BG
83% historically approved · decision due ~28 Oct
PRIOR APPROVAL APPLICATION FOR CHANGE OF USE FROM VACANT FIRST AND SECOND FLOOR TO 24 NO. APARTMENTS
Awaiting decision New dwelling 25 docsMajor scheme -
16A Corporation Street Bolton BL1 2AN
ALTERATIONS TO SHOP FRONT TOGETHER INCLUDING INSTALLATION OF AWNING WITH OUTDOOR SEATING
Granted Full applications Windows or glazing 10 docs -
12-16 Corporation Street Bolton BL1 2AN
INSTALLATION OF A NEW SHOP FRONT TO EXISTING GROUND FLOOR RETAIL UNIT AND PROVISION OF A SEPARATE ENTRANCE TO THE UPPER FLOOR ACCOMMODATION TOGETHER WITH THE CHANGE OF USE OF THE FIRST AND SECOND FLOORS TO 4 No. APARTMENTS AND ASSOCIATED EXTERNAL ALTERATIONS.
Granted Full applications New dwelling Windows or glazing 11 docsSeveral homes -
73 Deansgate Bolton BL1 1HQ
83% historically approved · decision due ~15 Sep
INSTALLATION OF COMBINED DEFIBRILLATOR AND BLEED KIT CABINET TO EXTERNAL WALL
Awaiting decision 13 docs -
Ground Floor 45 - 47 Deansgate Bolton BL1 1HQ
83% historically approved · decision due ~5 Aug
INSTALLATION OF 1 NO. ILLUMINATED DIGITAL DISPLAY SCREEN
Decided
Other full applications applications
In Bolton
-
00365/26 Refused
73 Kermoor Avenue Bolton BL1 7HW
ERECTION OF 1NO. DETACHED DWELLING AND ASSOCIATED WORKS
-
21080/25 Granted
J Dickinson And Sons Ltd Station Road Bolton BL6 5JE
VARIATION OF CONDITIONS 1 AND 2 ON APPLICATION 16907/23 ALLOW FOR 24 HOUR OPERATIONS WITHIN UNITS 8 AND OPERATIONS UNTIL 11PM IN UNITS 9/10/11 (WASTE TRANSFER STATION) INCLUDING USE OF INTERNAL PLANT AND MACHINERY THROUGHOUT MONDAY TO SUNDAY AND INCLUDING BANK HOLIDAYS.
-
00820/26 Refused
9 Tonge Fold Road Bolton BL2 6AW
DEMOLITION OF EXISTING DWELLING AND ERECTION OF 6 NO. DWELLINGS TOGETHER WITH ASSOCIATED CAR PARKING
-
00394/26 Granted
Rock Hall Moses Gate Country Park Hall Lane Farnworth BL4 7QE
CHANGE OF USE OF GRADE II LISTED BUILDING TO CAFÉ WITH EXHIBITION, EVENTS, WORKSHOP AND OFFICE SPACES TOGETHER WITH DEMOLITION OF EXISTING TWO STOREY REAR EXTENSION AND ERECTION OF NEW THREE STOREY REAR EXTENSION WITH ROOF TERRACE AND BASEMENT, LANDSCAPING WORKS AND ASSOCIATED RESTORATION WORKS TO BUILDING INCLUDING INSTALLATION OF FRONT DOOR, TIMBER SASH WINDOWS AND HEAT PUMP SYSTEM
-
00252/26 Granted
Albert Road Car Sales 113 Albert Road Bolton BL4 9EA
DEMOLITION OF 2NO. EXISTING SINGLE STOREY BUILDINGS TOGETHER WITH THE ERECTION OF A CAR SHOWROOM WITH ANCILLARY OFFICES AND VALETING BAY