Planning application
LAND BOUNDED BY KENT ROAD, SALTHOUSE AVENUE, RIGBY ROAD, CENTRAL DRIVE, REVOE STREET, GRASMERE ROAD, ASHTON ROAD, HARRISON STREET, IBBISON COURT AND PRINCESS STREET, BLACKPOOL
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
A hybrid planning application comprising of : Full Planning application for: i} The demolition ...
As published by the council, reference 26/0306
Application record
- Reference
- 26/0306
- Status
- Registered
- Received
- 27 May 2026
- Validated
- 9 Jun 2026
- Ward
- Bloomfield
- Decision by
- Development Control Committee
Timeline
Dates from the published record
-
27 May 2026
Received by Blackpool
-
9 Jun 2026
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 4 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Blackpool took a median of 73 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in London
59 applications on PlanIndex · across 31 councils · 88% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itApplicant on file
6 applications on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
151 documents on file for this application
- Land use
- Objection
- Save britains heritage, charity organisation
- Victoria society
- 23 clifton avenue - absence of confirmed housing types
- Active travel england
- Hse
- 23 clinton avenue - no evidence - demolition
- 100 erdington road
- Lcc historic environment team
- 10 rydal avenue
- Anonymous objection - 13/07
- Lancashire wildlife trust
- Environment agency
- 23 clifton avenue - blight outside phase 1 and procedural failure
- 23 clifton avenue - loss of homes
- Environmental protection - amended v1
- Gazette notice
- 23 clinton ave - lack of job retention measures
- 23 clinton ave - approximately 300 homes? is not a sufficient
- 23 clinton avenue - incomplete preliminary ecological appraisal
- Blackpool airport
- Environmental protection
- 23 clinton avenue - demolition objection
- Historic england
- Volume 2: figure 5-2 defra laeq 16 hour road traffic noise
- Volume 2: figure 5-3 defra laeq 16 night road traffic noise
- Volume 2- figure 13-10 playing fields and bowing greens
- Volume 2: figure 5-1 hybrid application boundary within the context of bchra
- Volume 2: figure 18-1 committed development
- Volume 2, figure 13.10 - playing fields and bowling greens
- Volume 2, figure 5.3 - defra lnight road traffic noise
- Volume 2, figure 5.2 - defra laeq,16h road traffic noise
- Volume 2, figure 5.1 - hybrid planning application boundary within the context i
- Volume 2, figure 18.1 - committed developments
- Volume 3, appendix 14.4 - future baseline traffic flows
- Fire service
- National highways
- 23 clinton avenue - sci out of use resdents involvement
- Site notices
- Site notices
- Site notices
- Site notices
- Site notices
- Site notice
- Outline application form
- Full application form
- Location plan
- Access plan
- Extent of demolition
- Building heights
- Land use
- Volume 1
- Volume 2, figure 9.2
- Volume 2, figure 9.3 viewpoints
- Volume 2, figure 9.3 ztv
- Volume 2, figure 13.13 iomd
- Volume 2, figure 13.12 allotments
- Volume 2, figure 13.11 play facilities
- Volume 2, figure 13.9 natural green space
- Volume 2, figure 13.8 park and gardens
- Volume 2, figure 13.7.2 hospitals
- Volume 2, figure 13.7.1 healthcare provision
- Volume 2, figure 13.6 secondary schools
- Volume 2, figure 13.5 primary schools
- Volume 2, figure 13.4 early years
- Volume 2, figure 13.3 wider impact area
- Volume 2, figure 13.2 local impact area
- Volume 2, figure 13.1 phase 1 intervention area
- Volume 2, figure 10.6 bat survey results
- Volume 2, figure 10.5 bat emergence survey effort
- Volume 2, figure 10.4 baseline habitat map
- Volume 2, figure 10.3 nationally designated statutory sites
- Volume 2, figure 10.2 european or international designated sites within 10km
- Volume 2, figure 10.1 site boundary and survey area
- Volume 2, figure 9.23 type 3 visualisation viewpoint 14
- Volume 2, figure 9.22 type 3 visualisation viewpoint 12
- Volume 2, figure 9.21 type 3 visualisation viewpoint 6
- Volume 2, figure 9.20 type 3 visualisation viewpoint 4
- Volume 2, figure 9.19 type 3 visualisation viewpoint 1
- Volume 2, figure 9.4.18 type 1 viewpoint photography part 3
- Volume 2, figure 9.4.18 type 1 viewpoint photography part 2
- Volume 2, figure 9.4.18 type 1 viewpoint photography part 1
- Volume 2, figure 7.7 day time laeq,16h noise contour plot ? with illustrative ma
- Volume 2, figure 7.6 assessment locations
- Volume 2, figure 7.5 defra lnight road traffic noise
- Volume 2, figure 7.4 defra laeq,16h road traffic noise
- Volume 2, figure 7.3 night-time laeq, 8h baseline noise contour plot
- Volume 2, figure 7.2 day time laeq,16h baseline noise contour plot
- Volume 2, figure 7.1 baseline noise measeurement locations
- Volume 2, figure 6.2 construction dust risk assessment study area
- Volume 2, figure 6.1 baseline aq and constraints
- Volume 2, figure 2.4 demolition phases
- Volume 2, figure 2.3 parameter plan ? building heights
- Volume 2, figure 2.2 parameter plan ? land use and access
- Volume 2, figure 2.1 site location plan
- Volume 2, figure 1.1 red line boundary
- Volume 3, appendix 1-2 scoping opinion
- Volume 3, appendix 1-1 scoping report
- Volume 3, appendix 3-2 ocemp
- Volume 3, appendix 3-1 crrr eia impact assessment
- Volume 3, appendix 4-1 consultation boards
- Volume 3, appendix 5-1 bchraf
- Volume 3, appendix 6-1 legislation and guidance
- Volume 3, appendix 6-2 dusk risk assessment
- Volume 3, appendix 7-2 sound measurement equipment
- Volume 3, appendix 7-3 background sound levels
- Volume 3, appendix 7-4 construction plant assumptions
- Volume 3, appendix 7-5 site suitability assessment
- Volume 3, appendix 8-1 heritage statement
- Volume 3, appendix 8-2 archaeological desk-based assessment
- Volume 3, appendix 9-2 - landscape baseline descriptions
- Volume 3, appendix 9-3 - visual baseline descriptions
- Volume 3, appendix 10-1 legislation, planning policy and guidance
- Volume 3, appendix 10-2 preliminary ecological appraisal
- Volume 3, appendix 10-3 preliminary roost assessment report
- Volume 3, appendix 10-4 bat emergence survey report
- Volume 3, appendix 10-5 habitats regulations assessment - stage 1 (2)
- Volume 3, appendix 10-6 biodiversity net gain assessment (2)
- Volume 3, appendix 11-1 flood risk assessment
- Volume 3, appendix 12-1 geo-environmental preliminary risk assessment
- Volume 3, appendix 14-1 - transport assessment
- Volume 3, appendix 14-2 - assigned link sensitivites
- Volume 3, appendix 14-3 - baseline traffic flows
- Volume 3, appendix 16-1 wind - consultation
- Volume 3, appendix 16-2 contour wind plots
- Volume 3, appendix 16-3 contour wind plots part 1
- Volume 3, appendix 16-3 contour wind plots part 2
- Volume 3, appendix 16-3 contour wind plots part 3
- Volume 3, appendix 17-1 consultation
- Volume 3, appendix 17-2 daylight and sunlight sensitive receptors (for vsc and p
- Volume 3, appendix 17-3 detailed daylight assessment results (vsc)
- Volume 3, appendix 17-5 external overshadowing detail results (surrounding ameni
- Volume 3, appendix 18-1 long-list of committed developments
- Volume 3, appendix 18-2 screening
- Volume 3, appenndix 17-4 detailed sunlight assessment results (apsh and wpsh)
- Volume 3, noise appendix 7-1 legislation, policy and guidance
- Volume 3, the statutory biodiversity metric calculation tool
- Volume 3, tvia appendix 9-1 consultation
- Volume 4, non-technical summary
- Planning statement and appendices
- Site waste management plan
- Structural demolition method statement and risk assessments
- Energy statement
- Statement of community involvement
- Outline construction environmental management plan
- Broadband report
- Design and access statement
- Design principles and parameters
- Outline structural demolition method statement
- Tree constraints report
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Blackpool for determination, against a statutory target of eight weeks. Over the last year Blackpool's median decision took 73 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Blackpool's portal will say. Our guide explains the common types.