Planning application
Perspex International Chapels Park Plant Goose House Lane Darwen BB3 0EH
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Discharge Condition 11 "validation report" pursuant to planning application 10/24/0729
As published by the council, reference 10/26/0522
Application record
- Reference
- 10/26/0522
- Type
- Discharge of planning condition
- Status
- Pending As published: REGISTERED
- Received
- 2 Jun 2026
- Validated
- 8 Jun 2026
- Ward
- Darwen East
- Parish
- Darwen
- Postcode
- BB3 0EH
Site history
Applications at this address on the Blackburn with Darwen register
This site has had 3 applications since 2025.
-
10/25/0894 Withdrawn
Perspex International Chapels Park Plant Goose House Lane Darwen BB3 0EH
Dishcharge Condition No.11 "gas membrane validation" pursuant to planning application 10/24/0729
-
10/25/0102 Withdrawn
Perspex International Chapels Park Plant Goose House Lane Darwen BB3 0EH
Discharge Condition "standard biodiversity net gain" pursuant to planning application 10/24/0729
Timeline
Dates from the published record
-
2 Jun 2026
Received by Blackburn with Darwen
-
8 Jun 2026
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 3 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Blackburn with Darwen took a median of 51 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Blackburn with Darwen for determination, against a statutory target of eight weeks. Over the last year Blackburn with Darwen decided condition discharge and variation applications in a median of 64 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Perspex International Chapels Park Plant Goose House Lane Darwen BB3 0EH
Dishcharge Condition No.11 "gas membrane validation" pursuant to planning application 10/24/0729
Withdrawn Conditions 3 docs -
Lucite International UK Ltd Darwen BB3 1QB
Variation of condition 4, Dwg No. SK001 A on application 10/05/1084
Granted Amendments 8 docs -
Perspex International Chapels Park Plant Goose House Lane Darwen BB3 0EH
Discharge Condition "standard biodiversity net gain" pursuant to planning application 10/24/0729
Withdrawn Conditions 14 docs -
Land off Goose House Lane Darwen
EIA Screening Opinion for Household Waste and Recycling Centre
Decided Outline 6 docs -
Land off Goose House Lane, Darwen
Discharge Condition No 12 "cycle parking and powerred two wheelers scheme " pursuant to planning application 10/23/0732
Granted Conditions 5 docs -
Moorland View Home For The Elderly Exchange St Darwen BB3 0DT
Pruning of trees overhanging the highways 2.5m over footpath 5.2m over road
Granted Trees 5 docs
Other condition discharge and variation applications
In Blackburn with Darwen
-
10/26/0482 Granted
Temple Farm Bury Road Edgworth Bolton BL7 0BT
Discharge Condition No.16 "bat licence/statement " pursuant to planning application 10/26/0086
-
10/26/0299 Granted
Stocks Farm Carr Lane Blackburn BB2 6QT
Discharge Condition Nos 3 "materials", 4 "sustainable surface drainage system and foul water drainage scheme", 5 "construction and environmental management plan scheme", 6 "boundary treatment", 7 "landscaping scheme", and 8 "bat and bird boxes scheme" pursuant to planning application 10/25/0798
-
10/26/0530 Awaiting decision
Whowells Farm Broadhead Road Turton Bolton BL7 0JJ
Discharge Condition No.3 "landscaping scheme" pursuant to planning application 10/26/0209
-
10/26/0429 Granted
Cloud Exotic Bright Street Darwen BB3 1QL
Discharge Condition No.9 " vehicular access barrier to side of building scheme" pursuant to planning application 10/25/1113
-
10/26/0405 Granted
Land at Poole St Blackburn
Discharge Condition Nos 3 "materials", 4 "foul and surface water drainage scheme", 5 "sustainable drainage management and maintenance plan", 6 "desk study" and 9 "Construction Environmental Management Plan scheme" pursuant to planning application 10/25/0123