Planning application
10/26/0410
Tensar Manufacturing Ltd Sett End Road West Blackburn BB1 2PU
Proposal
Proposed installation of an area of hard surfacing and associated barriers within the existing yard
As published by the council, reference 10/26/0410
Timeline
Dates from the published record
-
29 Apr 2026
Received by Blackburn with Darwen
-
6 May 2026
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Blackburn with Darwen for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About lawful development applications
How this application type works
A lawful development certificate is a legal determination, not a planning judgement. It asks the council to confirm either that existing use or works are lawful, often through the passage of time, or that a proposal would not need planning permission at all. The applicant must prove the facts; the merits of the scheme are not considered.
Nearby applications
Within 500 metres
-
10/25/1324 Withdrawn
Former Tee Rific Crazy Golf 200 Old Bank Lane, off Shadsworth Road, Blackburn BB1 2HU
Use of property as a place of worship with ancillary offices
-
10/26/0322 Awaiting decision
27 Besant Close Blackburn BB1 2RG
Proposed conversion of the existing garage into a granny flat with single storey extension to rear of garage and erection of single storey extension to rear of the dwellinghouse to attach to granny flat and proposed front porch
-
10/21/0583 Granted
Reed Plastic Containers Ltd Haslingden Road Blackburn BB1 2PX
3No. External Silos
-
10/25/0667 Withdrawn
Newfield School Old Bank Lane Blackburn BB1 2PW
DO NOT REGISTER - MORE CONDITIONS TO BE INCLUDED Discharge Condition No.8 "foul and surface water drainage scheme" pursuant to planning application 10/25/0178
-
10/19/1225 Granted
15 Seacole Close Blackburn BB1 2RA
Erection of single storey extension to rear. 8m from the rear wall, max height 3.15m, height to eaves 2.40m.
Other lawful development applications
In Blackburn with Darwen
-
10/26/0517 Awaiting decision
Unit 8 Arkwright Court Commercial Road Blackburn Interchange J4/M65 Darwen BB3 0FG
Use of property as Aesthetics Medical Facility (Use Class E(e))
-
10/26/0515 Awaiting decision
Land at Whalley Old Road (located to the East of the existing bus turning area), and directly serving the new Vistry/Bovis housing development (currently under phased construction) Blackburn
The construction of a new 4-arm roundabout - the Eastern and Western arms will re-align the existing Whalley Old Road, the Northern arm will serve the future North East Blackburn Development and the Southern arm will serve the adjacent housing site which is currently under construction - and widening and drainage works to the existing access road to the north of Whalley Old Road
-
10/26/0511 Awaiting decision
12 Bentham Road Blackburn BB2 4PN
Use of property by the Ministry of Justice's Probation Accommodation Programme for up to three adults (Use Class C2)
-
10/26/0443 Awaiting decision
310 Bolton Road Blackburn BB2 4HY
Change of use of retail unit from Class E(a) to Use Class E(b)
-
10/26/0450 Awaiting decision
24 The Greenwood Blackburn BB2 4UR
Erection of new boundary fence and alterations to rear garden levels