Skip to content
PlanIndex Get alerts
Menu

Planning application

6 Gisburn Place Blackburn BB2 6NT

Granted Blackburn with Darwen 10/26/0386 Householder Notification - Single storey rear extension

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of single storey extension to rear 4.50m from original rear wall, Max Height: 2.85m, Height to Eaves: 2.50m

As published by the council, reference 10/26/0386

Application record

Reference
10/26/0386
Type
Householder Notification - Single storey rear extension
Status
FINAL DECISION
Decision
Prior Approval is not required
Received
21 Apr 2026
Validated
23 Apr 2026
Decided
18 May 2026
Ward
Wensley Fold
Parish
Blackburn
Decision by
Delegated
Postcode
BB2 6NT

Timeline

Dates from the published record

  1. 21 Apr 2026

    Received by Blackburn with Darwen

  2. 23 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 18 May 2026

    Decision issued: Prior Approval is not required

  4. 27 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About householder applications

How this application type works

Householder applications cover work to an existing house and its garden: extensions, loft and garage conversions, porches, outbuildings and similar alterations within the boundary of the home. They cannot be used to create a separate dwelling or change what the building is used for. Councils aim to decide them within eight weeks, and immediate neighbours are usually notified and given a chance to comment.

More on householder applications in our guide

Nearby applications

Within 500 metres

  • 5 Grindleton Road Blackburn BB2 6NZ

    10/21/0883 Submitted 3 Aug 2021 88m away

    Erection of Single storey rear extension 5.5m from rear wall, Max Height: 3.5m, Height to Eaves: 2.7m

    Granted Householder Extension 5 docs
    Small domestic
  • 140 Wensley Road Blackburn BB2 1QD

    10/15/1356 Submitted 27 Oct 2015 93m away

    Rear single storey extension

    Granted Full applications Extension 24 docs
    Small domestic
  • Former Newmans Site Garden Street Blackburn BB2 1TZ

    10/19/1192 Submitted 9 Dec 2019 98m away

    Discharge conditions 4, 5, 6, 8, 9, 10, 19, 20 21 & 23 on planning application 10/18/0282

    Withdrawn Conditions 8 docs
  • Former Newman Shoes Factory Garden Street Blackburn BB2 1TZ

    10/22/0756 Submitted 29 Jul 2022 98m away

    Discharge Condition Nos 5 " contamination ", 10 '' surface water drainage scheme'', 11 "site access and highway works", 12 "covered cycle/motorcycle storage", 17 "acoustic barrier", 19 "lighting scheme", 20 "EV charging points", and 21 "landscaping" pursuant to planning application 10/20/0169

    Granted Conditions 16 docs
  • 73 Wensley Road Blackburn BB2 1QA

    10/21/0966 Submitted 19 Aug 2021 99m away

    Proposed conversion of existing ancillary living accommodation into separate 3 bed flat, erection of two storey rear extension above ground floor and installation of external staircase - relocation of A/C unit.

    Granted Full applications Extension 12 docs
  • 85 Rawstorne Street Blackburn BB2 6NU

    10/24/0910 Submitted 11 Oct 2024 104m away

    Insertion of 1st floor window on front elevation

    Granted Full applications Windows or glazing 6 docs

In Blackburn with Darwen

  • 10/26/0480 Granted

    3 Birchbank Gardens Blackburn BB1 6NB

    Erection of single storey rear extension 6m from original rear wall, Max Height: 3.51m, Height to Eaves: 2.45m

    22 May 2026 Householder
  • 10/26/0466 Granted

    65 Holly Street Blackburn BB1 9TP

    Erection of single storey extension to rear. 6m from original rear wall, Max Height: 2.8m, Height to Eaves: 2.550m

    18 May 2026 Householder
  • 10/26/0461 Granted

    4 Furness Avenue Blackburn BB1 5SE

    Erection of single storey extension to rear Max length 6m additional 1.8m beyond rear extension Eaves height 3m Ridge height 3.25m

    14 May 2026 Householder
  • 10/26/0454 Granted

    8 July Street Blackburn BB1 1SR

    Erection of single storey rear extension. 4.00m from original rear wall, Max Height: 3.00m, Height to Eaves: 2.75m

    13 May 2026 Householder
  • 10/26/0423 Granted

    55 Snaefell Road Blackburn BB2 3JW

    Erection of single storey rear extension. Max length 3.5m, eaves height 3m, ridge height 4m and rear corner infill extension.

    1 May 2026 Householder