Skip to content
PlanIndex Get alerts
Menu

Planning application

140 Wensley Road Blackburn BB2 1QD

Granted Blackburn with Darwen 10/15/1356 Full Planning Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Rear single storey extension

As published by the council, reference 10/15/1356

Application record

Reference
10/15/1356
Type
Full Planning Application
Status
FINAL DECISION
Decision
Permits
Received
27 Oct 2015
Validated
27 Nov 2015
Decided
28 Jan 2016
Ward
Wensley Fold
Parish
Blackburn
Decision by
Delegated
Postcode
BB2 1QD

Timeline

Dates from the published record

  1. 27 Oct 2015

    Received by Blackburn with Darwen

  2. 27 Nov 2015

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jan 2016

    Decision issued: Permits

  4. 7 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

24 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Former Newmans Site Garden Street Blackburn BB2 1TZ

    10/19/1192 Submitted 9 Dec 2019 17m away

    Discharge conditions 4, 5, 6, 8, 9, 10, 19, 20 21 & 23 on planning application 10/18/0282

    Withdrawn Conditions 8 docs
  • Former Newman Shoes Factory Garden Street Blackburn BB2 1TZ

    10/22/0756 Submitted 29 Jul 2022 17m away

    Discharge Condition Nos 5 " contamination ", 10 '' surface water drainage scheme'', 11 "site access and highway works", 12 "covered cycle/motorcycle storage", 17 "acoustic barrier", 19 "lighting scheme", 20 "EV charging points", and 21 "landscaping" pursuant to planning application 10/20/0169

    Granted Conditions 16 docs
  • 73 Wensley Road Blackburn BB2 1QA

    10/21/0966 Submitted 19 Aug 2021 37m away

    Proposed conversion of existing ancillary living accommodation into separate 3 bed flat, erection of two storey rear extension above ground floor and installation of external staircase - relocation of A/C unit.

    Granted Full applications Extension 12 docs
  • 85 Rawstorne Street Blackburn BB2 6NU

    10/24/0910 Submitted 11 Oct 2024 46m away

    Insertion of 1st floor window on front elevation

    Granted Full applications Windows or glazing 6 docs
  • 6 Gisburn Place Blackburn BB2 6NT

    10/26/0386 Submitted 21 Apr 2026 93m away

    Erection of single storey extension to rear 4.50m from original rear wall, Max Height: 2.85m, Height to Eaves: 2.50m

    Granted Householder Extension 5 docs
    Small domestic
  • Land adjacent to the Lion Hotel Wensley Road Blackburn BB2 1PX

    10/22/0557 Submitted 7 Jun 2022 113m away

    Variation of Condition No.13 pursuant to planning application 10/17/0648 "New building to be used as (B2) car repair garage/MOT station and new vehicular access" - amend opening hours to Monday - Friday 08:00 to 20:00, Saturdays 08:00 to 19:00, Sundays or Bank Holidays 10:00 to 17:00 hours

    Refused Amendments 9 docs

In Blackburn with Darwen

  • 10/26/0360 Granted

    Spout House Farm Bog Height Road Darwen BB3 0LF

    Proposed single storey flat roof rear extension with balcony, loft conversion, dormer extension and internal alterations

    15 Apr 2026 Full applications
  • 10/26/0349 Granted

    31 King William Street Blackburn BB1 7DJ

    Installation of defibrillator and bleed kit cabinets to external wall

    14 Apr 2026 Full applications
  • 10/26/0332 Granted

    30 Cleveleys Road Blackburn BB2 3JS

    Proposed single storey side extension, detached garage and larger front porch

    7 Apr 2026 Full applications
  • 10/26/0529 Awaiting decision

    Longshaw Head Barn Crowthorn Road Edgworth Bolton BL7 0JX

    Proposed two storey side / rear extension with front, rear dormers and external alterations to dwelling

    8 Jun 2026 Full applications
  • 10/26/0381 Granted

    20 Mollington Road Blackburn BB2 6EG

    Proposed single storey side/rear extension and front porch

    21 Apr 2026 Full applications