Planning application
King George's Hall Northgate Blackburn BB2 1AA
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Siting of 4No. internal digital advertisement boards and 2No. external digital advertising boards along the East elevation and 4No. external digital advertising boards along the South elevation
As published by the council, reference 10/25/1270
Application record
- Reference
- 10/25/1270
- Type
- Listed Building Application (Regulation 3)
- Status
- Pending As published: REGISTERED
- Received
- 5 Dec 2025
- Validated
- 15 Dec 2025
- Ward
- Blackburn Central
- Parish
- Blackburn
- Postcode
- BB2 1AA
Site history
Applications at this address on the Blackburn with Darwen register
This site has had 6 applications since 2025.
-
10/25/1356 Awaiting decision
King George's Hall Northgate Blackburn BB2 1AA
Installation of plant and associated gantry, installation of ducting to conceal new services, installation of flue, installation of metal external staircases and boarding over of 3rd floor windows to east and west elevations
-
10/25/1357 Awaiting decision
King George's Hall Northgate Blackburn BB2 1AA
Installation of plant and associated gantry, installation of ducting to conceal new services, installation of flue, installation of metal external staircases and boarding over of 3rd floor windows to east and west elevations
-
10/25/1274 Awaiting decision
King George's Hall Northgate Blackburn BB2 1AA
Siting of 4No. internal digital advertisement boards and 2No. external digital advertising boards along the East elevation and 4No. external digital advertising boards along the South elevation
-
10/25/0216 Withdrawn
King George's Hall Northgate Blackburn BB2 1AA
Discharge Condition 3 " construction environmental method statement " pursuant to planning application 10/24/0430
-
10/25/0215 Withdrawn
King George's Hall Northgate Blackburn BB2 1AA
Discharge Condition 3 " construction environmental method statement" pursuant to planning application 10/24/0341
Timeline
Dates from the published record
-
5 Dec 2025
Received by Blackburn with Darwen
-
15 Dec 2025
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 9 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Blackburn with Darwen took a median of 51 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Blackburn with Darwen for determination, against a statutory target of eight weeks. Over the last year Blackburn with Darwen's median decision took 51 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
King George's Hall Northgate Blackburn BB2 1AA
Discharge Condition 3 " construction environmental method statement" pursuant to planning application 10/24/0341
Withdrawn Conditions 4 docs -
King George's Hall Northgate Blackburn BB2 1AA
97% historically approved · decision due ~27 Feb
Installation of plant and associated gantry, installation of ducting to conceal new services, installation of flue, installation of metal external staircases and boarding over of 3rd floor windows to east and west elevations
Awaiting decision Full applications Windows or glazing 21 docs -
King George's Hall Northgate Blackburn BB2 1AA
97% historically approved · decision due ~27 Feb
Installation of plant and associated gantry, installation of ducting to conceal new services, installation of flue, installation of metal external staircases and boarding over of 3rd floor windows to east and west elevations
Awaiting decision Heritage and listed buildings Windows or glazing 19 docs -
King George's Hall Northgate Blackburn BB2 1AA
97% historically approved · decision due ~9 Feb
Siting of 4No. internal digital advertisement boards and 2No. external digital advertising boards along the East elevation and 4No. external digital advertising boards along the South elevation
Awaiting decision Advertising 7 docs -
King George's Hall Northgate Blackburn BB2 1AA
Discharge Condition 3 " construction environmental method statement " pursuant to planning application 10/24/0430
Withdrawn Conditions 4 docs -
Other heritage and listed building applications
In Blackburn with Darwen
-
10/26/0250 Granted
Lloyds Bank Church Street Blackburn BB2 1JQ
Repair and replacement of certain internal doors following internal health & safety and security review
-
10/26/0325 Granted
JD Wetherspoon The Old Chapel Railway Road Darwen BB3 2RJ
Remedial works to external elements of the Grade II listed building, namely like-for-like masonry repair to stone steps, painted nosings to stone steps and nosing application to steps where missing / in poor condition
-
10/26/0318 Granted
Holy Trinity Church Mount Pleasant Blackburn BB1 5DQ
Repair of masonry parapets and copings to Chancel East gable, North Transept, South Transept and associated leadwork and roofing repairs
-
10/26/0337 Granted
Blackburn College, Victoria Centre Blakey Moor Blackburn BB2 1LH
Recladding of rooftop walkway and installation of louvres
-
10/26/0395 Awaiting decision
548 Preston Old Road Blackburn BB2 5NL
Removal of a 4m section of boundary wall, to enable the creation of a new vehicular access to the property off Woodlands Avenue