Proposal
Discharge Condition Nos 5 "desk study", 8,"noise attenuation scheme", 12 "sustainable surface water and foul water drainage scheme",14 "surface water construction management plan", 15 "sustainable drainage management and maintenance plan" and 20 "bat and bird boxes scheme" pursuant to planning application 10/25/0505
As published by the council, reference 10/25/0999
Application record
- Reference
- 10/25/0999
- Type
- Discharge of planning condition
- Status
- Pending As published: REGISTERED
- Received
- 29 Sep 2025
- Validated
- 1 Oct 2025
- Ward
- Blackburn Central, Mill Hill & Moorgate
- Parish
- Blackburn
- Decision by
- Delegated
Site history
Applications at this address on the Blackburn with Darwen register
This site has had 6 applications since 2025: 2 approved, 0 refused.
-
10/26/0438 Granted
Land off Redlam Brow Blackburn
Non-material amendment pursuant to planning application 10/25/0505 "Construction of 80 Dwellings and associated infrastructure" - for the construction of an electricity sub-station
-
10/26/0304 Awaiting decision
Land off Redlam Brow Blackburn
Discharge Condition No.13 "protection of water mains scheme " pursuant to planning application 10/25/0505
-
10/26/0047 Awaiting decision
Land off Redlam Brow Blackburn
Discharge Condition Nos 11 "noise and vibration assessment levels and test locations", 12 "drainage layout scheme", 14 "construction surface water management plan" and 15 "surface water management plan scheme" pursuant to planning application 10/25/0505
-
10/25/1299 Awaiting decision
Land off Redlam Brow Blackburn
Discharge Condition Nos 22 "highway layout, drainage, construction details and streetlighting scheme", and 23 "junction details for Redlam Brow/Bank Top" pursuant to planning application 10/25/0505
-
10/25/1035 Granted
Land off Redlam Brow Blackburn
Discharge Condition No 9 "CEMP" pursuant to planning application 10/25/0505
Timeline
Dates from the published record
-
29 Sep 2025
Received by Blackburn with Darwen
-
1 Oct 2025
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 26 November 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Blackburn with Darwen took a median of 51 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Blackburn with Darwen for determination, against a statutory target of eight weeks. Over the last year Blackburn with Darwen decided condition discharge and variation applications in a median of 64 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land off Redlam Brow Blackburn
95% historically approved · decision due ~24 Mar
Discharge Condition Nos 11 "noise and vibration assessment levels and test locations", 12 "drainage layout scheme", 14 "construction surface water management plan" and 15 "surface water management plan scheme" pursuant to planning application 10/25/0505
Awaiting decision Conditions 15 docs -
Land off Redlam Brow Blackburn
95% historically approved · decision due ~11 Feb
Discharge Condition Nos 22 "highway layout, drainage, construction details and streetlighting scheme", and 23 "junction details for Redlam Brow/Bank Top" pursuant to planning application 10/25/0505
Awaiting decision Conditions 20 docs -
Land off Redlam Brow Blackburn
Discharge Condition No 9 "CEMP" pursuant to planning application 10/25/0505
Granted Conditions 13 docs -
Land off Redlam Brow Blackburn
Non-material amendment pursuant to planning application 10/25/0505 "Construction of 80 Dwellings and associated infrastructure" - for the construction of an electricity sub-station
Granted Amendments 7 docsMajor scheme -
Land off Redlam Brow Blackburn
95% historically approved · decision due ~25 May
Discharge Condition No.13 "protection of water mains scheme " pursuant to planning application 10/25/0505
Awaiting decision Conditions 13 docs -
Other condition discharge and variation applications
In Blackburn with Darwen
-
10/26/0482 Granted
Temple Farm Bury Road Edgworth Bolton BL7 0BT
Discharge Condition No.16 "bat licence/statement " pursuant to planning application 10/26/0086
-
10/26/0299 Granted
Stocks Farm Carr Lane Blackburn BB2 6QT
Discharge Condition Nos 3 "materials", 4 "sustainable surface drainage system and foul water drainage scheme", 5 "construction and environmental management plan scheme", 6 "boundary treatment", 7 "landscaping scheme", and 8 "bat and bird boxes scheme" pursuant to planning application 10/25/0798
-
10/26/0530 Awaiting decision
Whowells Farm Broadhead Road Turton Bolton BL7 0JJ
Discharge Condition No.3 "landscaping scheme" pursuant to planning application 10/26/0209
-
10/26/0429 Granted
Cloud Exotic Bright Street Darwen BB3 1QL
Discharge Condition No.9 " vehicular access barrier to side of building scheme" pursuant to planning application 10/25/1113
-
10/26/0405 Granted
Land at Poole St Blackburn
Discharge Condition Nos 3 "materials", 4 "foul and surface water drainage scheme", 5 "sustainable drainage management and maintenance plan", 6 "desk study" and 9 "Construction Environmental Management Plan scheme" pursuant to planning application 10/25/0123