Skip to content
PlanIndex Get alerts
Menu

Planning application

12 Alton Road, Birmingham, B29 7DU

Awaiting decision Birmingham 2026/04856/PA Full Planning

Works: Extension Loft or dormer Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of single storey rear extension and loft conversion with dormer windows to front and rear and change of use from residential house(Use Class C3) to 6-bed HMO (Use Class C4)

As published by the council, reference 2026/04856/PA

Application record

Reference
2026/04856/PA
Type
Full Planning
Status
Pending As published: REGISTERED: Under Consultation
Received
11 Aug 2026
Validated
1 Oct 2026
Ward
Bournbrook & Selly Park
Postcode
B29 7DU

Comment by 28 October 2026

The council is taking comments on this application until then. Comments go to Birmingham through their own planning portal.

Site history

Applications at this address on the Birmingham register

This site has had 2 applications since 2026: 1 approved, 0 refused.

  • 2026/04434/PA Granted

    12 Alton Road, Birmingham, B29 7DU

    Erection of 6 metre deep single storey rear extension. Maximum height 4 metres, eaves height 3 metres

    Decided 28 Aug 2026 Prior approval

Timeline

Dates from the published record

  1. 11 Aug 2026

    Received by Birmingham

  2. 1 Oct 2026

    Validated

    Checked as complete and ready for consideration.

  3. 4 Oct 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 26 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Birmingham took a median of 70 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Birmingham for determination, against a statutory target of eight weeks. Over the last year Birmingham decided full applications in a median of 134 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 12 Alton Road, Birmingham, B29 7DU

    2026/04434/PA Submitted 27 Jul 2026 50 yards away

    Erection of 6 metre deep single storey rear extension. Maximum height 4 metres, eaves height 3 metres

    Granted Prior approval Extension 3 docs
    Small domestic
  • 7 Alton Road Selly Oak Birmingham B29 7DU

    2025/07199/PA Submitted 22 Dec 2025 50 yards away

    Erection of single storey rear extension and installation of dormer window to front.

    Granted Householder Extension Loft or dormer +1 8 docs
    Small domestic
  • 42 Alton Road Selly Oak Birmingham B29 7DU

    2024/01421/PA Submitted 6 Mar 2024 50 yards away

    Change of use from 3-bed HMO (Use Class C4) to 6 bedroom, 7 person HMO (Sui Generis) and erection of a single storey rear extension and dormer window front

    Granted Full applications Extension Loft or dormer +1 8 docs
    Small domestic
  • 3 Alton Road Selly Oak Birmingham B29 7DU

    2022/09358/PA Submitted 19 Dec 2022 50 yards away

    Installation of replacement dormer window to front

    Granted Householder Loft or dormer Windows or glazing 6 docs
    Domestic
  • 43 Alton Road Selly Oak Birmingham B29 7DU

    2023/06578/PA Submitted 28 Sep 2023 50 yards away

    Retention of change of use to 7-bed House in Multiple Occupation (HMO) - (Sui Generis)

    Granted Full applications 5 docs
  • 42 Alton Road Selly Oak Birmingham B29 7DU

    2023/07199/PA Submitted 24 Oct 2023 50 yards away

    Change of use from 5-bed HMO (Use Class C4) to 7-bed HMO (Sui Generis) and erection of single storey side and rear extension and dormer windows to front and rear

    Refused Full applications Extension Loft or dormer +1 9 docs
    Small domestic

In Birmingham

  • 2026/02496/PA Awaiting decision

    1 Coppice View Road, Birmingham, B73 6UE

    Change of use from dwelling house (Use Class C3) to children's home (Use Class C2)

    Received 7 May, published by the council 27 Jul 2026 Full applications
  • 2026/02329/PA Awaiting decision

    21-22 Calthorpe Road Edgbaston Birmingham B15 1RP

    Continued use of site as a children's day nursery with extended opening hours between 07:00am and 19:00pm Monday to Friday

    Received 29 Apr, published by the council 3 Sep 2026 Full applications
  • 2026/02766/PA Awaiting decision

    11 Croy Drive, Birmingham, B35 6NY

    Change of use from single dwelling (Use Class C3) to children's home (Use Class C2) for upto two children including garage conversion into a staff office/sleeping facility

    Received 20 May, published by the council 27 Jul 2026 Full applications
  • 2026/02517/PA Awaiting decision

    Gravelly Industrial Park, Standard Way, Birmingham, B24 8DD

    Facade repainting and feature flashing to entrances

    Received 8 May, published by the council 3 Sep 2026 Full applications
  • 2026/02960/PA Awaiting decision

    359 Birmingham Road, Birmingham, B72 1DL

    Change of use from dwelling house (Use Class C3) to Children's care home (Use Class C2) for up to 4 children.

    Received 1 Jun, published by the council 7 Aug 2026 Full applications