Skip to content
PlanIndex Get alerts
Menu

Planning application

2026/00606/PA

2 Farquhar Road Edgbaston Birmingham B15 3RB

Awaiting decision Birmingham Full Planning

Proposal

Erection of 1no. dwelling house

As published by the council, reference 2026/00606/PA

Timeline

Dates from the published record

  1. 5 Feb 2026

    Received by Birmingham

  2. 14 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 20 Jul 2026

    Added to PlanIndex

  4. 29 Jul 2026

    Status changed to REGISTERED: Under Assessment

  5. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Birmingham for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 2025/05551/PA Granted

    2 B Farquhar Road Edgbaston Birmingham B15 3RB

    Application to determine the details for condition number 3, 4, 5, 6 and 10 (3- Submission of sample materials 4- Replacement of any trees removed during construction 5- Submission of hard and/or soft landscape details 6- No development shall commence until the following full architectural and specification details 10- Ecological/biodiversity/enhancement measures) attached to reference number 2025/01840/PA

    1 Oct 2025 148m away Conditions
  • 2025/06707/PA Granted

    Newman House 29 Harrisons Road Edgbaston Birmingham B15 3QR

    Application for a non-material amendment to application no. 2023/05174/PA to reflect minor changes to external materials proposed in the construction of the development.

    26 Nov 2025 402m away Amendments
  • 2025/05336/PA Granted

    Newman House 29 Harrisons Road Birmingham B15 3QR

    Application to determine details for conditions 2 (contamination remediation scheme), 5 (foul water drainage scheme), 7 (external materials) and 10 (bird/bat boxes) attached to approval 2023/05174/PA.

    23 Sep 2025 402m away Conditions
  • 2026/01341/PA Status unknown

    Newman House 29 Harrisons Road Edgbaston Birmingham B15 3QR

    Variation of condition 1 (approved plans), condition 4 (surface water drainage scheme) and condition 9 (ecological enhancement stratagy) and removal of condition 21 (green/brown roofs) attached to planning permission 2023/05174/PA to reflect a revised ecological and drainage strategy.

    16 Mar 2026 402m away Amendments
  • 2025/06282/PA Granted

    Newman House 29 Harrisons Road Birmingham B15 3QR

    Application to determine details for conditions 13 (noise insulation scheme), 16 (hard and soft landscaping), 17 (hard surfacing materials), 18 (boundary treatments), 19 (landscape management plan) and 20 (lighting scheme) attached to approval 2023/05174/PA.

    6 Nov 2025 402m away Conditions
  • 2026/00275/PA Granted

    Newman House 29 Harrisons Road Edgbaston Birmingham B15 3QR

    Non material amendment to Planning Approval 2023/05174/PA for changes to window material

    21 Jan 2026 402m away Amendments

In Birmingham

  • 2026/02114/PA Granted

    footpath outside 30 New John Street Birmingham B19 3NB

    Installation of 1no. BT street hub unit

    21 Apr 2026 Full applications
  • 2026/02177/PA Withdrawn

    1 Braham Street London E1 8EE England

    Installation of 1No. BT Street Hub Unit and associated advertisement panels on either side of the unit

    20 Apr 2026 Full applications
  • 2026/01961/PA Granted

    Bellfield Junior And Infant School, Vineyard Road, Birmingham, B31 1PT

    Part demolition of existing building and erection of single storey side extension.

    14 Apr 2026 Full applications
  • 2026/02398/PA Refused

    8 Baker Street Springfield Birmingham B11 4SF

    Change of use of ground floor from retail (Use Class E) to 2no. self-contained apartments (Use Class C3)

    1 May 2026 Full applications
  • 2026/04370/PA Awaiting decision

    Birmingham Dental Hospital And School Of Dentistry, 5 Mill Pool Way, Birmingham, B5 7EG

    Erection of two single storey extensions to temporary Dental Hospital Operating Theatre and continued use until 31 October 2031.

    23 Jul 2026 Full applications