Planning application
2026/00606/PA
2 Farquhar Road Edgbaston Birmingham B15 3RB
Proposal
Erection of 1no. dwelling house
As published by the council, reference 2026/00606/PA
Timeline
Dates from the published record
-
5 Feb 2026
Received by Birmingham
-
14 Apr 2026
Validated
Checked as complete and ready for consideration.
-
20 Jul 2026
Added to PlanIndex
-
29 Jul 2026
Status changed to REGISTERED: Under Assessment
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Birmingham for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
2025/05551/PA Granted
2 B Farquhar Road Edgbaston Birmingham B15 3RB
Application to determine the details for condition number 3, 4, 5, 6 and 10 (3- Submission of sample materials 4- Replacement of any trees removed during construction 5- Submission of hard and/or soft landscape details 6- No development shall commence until the following full architectural and specification details 10- Ecological/biodiversity/enhancement measures) attached to reference number 2025/01840/PA
-
2025/06707/PA Granted
Newman House 29 Harrisons Road Edgbaston Birmingham B15 3QR
Application for a non-material amendment to application no. 2023/05174/PA to reflect minor changes to external materials proposed in the construction of the development.
-
2025/05336/PA Granted
Newman House 29 Harrisons Road Birmingham B15 3QR
Application to determine details for conditions 2 (contamination remediation scheme), 5 (foul water drainage scheme), 7 (external materials) and 10 (bird/bat boxes) attached to approval 2023/05174/PA.
-
2026/01341/PA Status unknown
Newman House 29 Harrisons Road Edgbaston Birmingham B15 3QR
Variation of condition 1 (approved plans), condition 4 (surface water drainage scheme) and condition 9 (ecological enhancement stratagy) and removal of condition 21 (green/brown roofs) attached to planning permission 2023/05174/PA to reflect a revised ecological and drainage strategy.
-
2025/06282/PA Granted
Newman House 29 Harrisons Road Birmingham B15 3QR
Application to determine details for conditions 13 (noise insulation scheme), 16 (hard and soft landscaping), 17 (hard surfacing materials), 18 (boundary treatments), 19 (landscape management plan) and 20 (lighting scheme) attached to approval 2023/05174/PA.
-
2026/00275/PA Granted
Newman House 29 Harrisons Road Edgbaston Birmingham B15 3QR
Non material amendment to Planning Approval 2023/05174/PA for changes to window material
Other full applications applications
In Birmingham
-
2026/02114/PA Granted
footpath outside 30 New John Street Birmingham B19 3NB
Installation of 1no. BT street hub unit
-
2026/02177/PA Withdrawn
1 Braham Street London E1 8EE England
Installation of 1No. BT Street Hub Unit and associated advertisement panels on either side of the unit
-
2026/01961/PA Granted
Bellfield Junior And Infant School, Vineyard Road, Birmingham, B31 1PT
Part demolition of existing building and erection of single storey side extension.
-
2026/02398/PA Refused
8 Baker Street Springfield Birmingham B11 4SF
Change of use of ground floor from retail (Use Class E) to 2no. self-contained apartments (Use Class C3)
-
2026/04370/PA Awaiting decision
Birmingham Dental Hospital And School Of Dentistry, 5 Mill Pool Way, Birmingham, B5 7EG
Erection of two single storey extensions to temporary Dental Hospital Operating Theatre and continued use until 31 October 2031.