Planning application

Green Lane Industrial Estate Second Avenue Bordesley Green Birmingham B9 5QP

Awaiting decision Birmingham 2026/00149/PA Full Planning

Works: Demolition Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed demolition of the existing single-storey building and erection of six self-contained industrial units (Use Classes B2 and B8), with associated parking and ancillary works

As published by the council, reference 2026/00149/PA

Application record

Reference
2026/00149/PA
Type
Full Planning
Status
Pending As published: REGISTERED: Pending recommendation
Received
14 Jan 2026
Validated
29 Apr 2026
Ward
Bordesley Green
Postcode
B9 5QP

Site history

Applications at this address on the Birmingham register

This site has had 2 applications since 2024: 1 approved, 0 refused.

  • 2024/05818/PA Granted

    Green Lane Industrial Estate Second Avenue Bordesley Green Birmingham B9 5QP

    Extension to existing community facilities modular building, provision of changing facilities, relocation of existing container structures and formation of car parking spaces

    Decided 22 Aug 2025 Full applications

Timeline

Dates from the published record

  1. 14 Jan 2026

    Received by Birmingham

  2. 29 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 20 Jul 2026

    Added to PlanIndex

  4. 7 Aug 2026

    Status changed to REGISTERED: Pending recommendation

  5. Decision

    Awaiting decision

    Decision expected by 24 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Birmingham took a median of 66 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Birmingham for determination, against a statutory target of eight weeks. Over the last year Birmingham decided full applications in a median of 128 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Green Lane Industrial Estate Second Avenue Bordesley Green Birmingham B9 5QP

    2024/05818/PA Submitted 10 Sep 2024 50 yards away

    Extension to existing community facilities modular building, provision of changing facilities, relocation of existing container structures and formation of car parking spaces

    Granted Full applications Extension 32 docs
  • Outside 428 Green Lane Bordesley Green Birmingham B9 5QJ

    2023/04131/PA Submitted 19 Jun 2023 50 yards away

    Telecoms License Advisory for the installation of 9m wooden pole

    Decided Telecoms 3 docs
  • 470 Green Lane Bordesley Green Birmingham B9 5QJ

    2023/08668/PA Submitted 27 Dec 2023 50 yards away

    Demolition of existing building at 30 Second Avenue and erection of building to be used as existing community center and mosque. 470 Green Lane; internal usage of rooms changed to be dedicated for education centre and separate access for gym and fitness centre in basement

    Withdrawn Full applications Demolition 24 docs
  • 434 Green Lane Bordesley Green Birmingham B9 5QJ

    2024/07751/PA Submitted 5 Dec 2024 50 yards away

    Application for a lawful development certificate for proposed single storey side and rear extension, dormer window to rear and roof lights to front

    Refused Lawful development Extension Loft or dormer +1 7 docs
    Small domestic
  • 365 Green Lane Small Heath Birmingham B9 5PP

    2022/09636/PA Submitted 23 Dec 2022 100 yards away

    Erection of single storey extension to existing nursery building

    Granted Full applications Extension 21 docs
    Small domestic
  • 11 Imperial Road Bordesley Green Birmingham B9 5HB

    2024/05309/PA Submitted 15 Aug 2024 150 yards away

    Single Storey Rear Extension

    Granted Householder Extension 7 docs
    Small domestic

In Birmingham

  • PA2026/00001/NEW Awaiting decision

    11 Gideon Close, Birmingham, B25 8LG

    This is a test application to test the upgrade from M3 to ASSURE. No development is due to take place

    Received 18 Sep, published by the council 21 Sep 2026 Full applications
  • 2026/04386/PA Awaiting decision

    66 Gracechurch Shopping Centre Parade Sutton Coldfield Birmingham B72 1PD

    Replacement shopfront to retail units

    Received 24 Jul, published by the council 14 Aug 2026 Full applications
  • 2025/03051/PA Granted

    9 Woodfield Road Moseley And Kings Heath Birmingham B13 9UL

    Conversion of two flats into a single dwellinghouse with erection of single storey rear extension and installation of dormer windows to rear

    Received 2 Jun, published by the council 7 Aug 2026 Full applications
  • 2025/00885/PA Refused

    244 Station Road Kings Heath Birmingham B14 7TE

    Change of use from 2no. flats (Use Class C3) to 5 bed HMO (Use Class C4)

    Received 12 Feb, published by the council 7 Aug 2026 Full applications
  • 2025/07325/PA Granted

    240 Broad Street, Birmingham, B1 2HG

    Installation of retractable canopy roof at first floor over existing flat roof to create additional usable space and erection of enclosure around existing plant.

    Received 5 Jan, published by the council 20 Jul 2026 Full applications