Planning application
2025/06891/PA
Land to East of New Bond Street Digbeth Birmingham B9 4EJ
Proposal
Temporary change of use of land (3 years) to B2 use
As published by the council, reference 2025/06891/PA
Timeline
Dates from the published record
-
8 Dec 2025
Received by Birmingham
-
27 Jan 2026
Validated
Checked as complete and ready for consideration.
-
20 Jul 2026
Added to PlanIndex
-
29 Jul 2026
Status changed to REGISTERED: Pending recommendation
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Birmingham for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
2024/06787/PA Granted
Unit 1 New Bond Street Birmingham B9 4EJ
(Retrospective) Change of use from self-storage unit (Use Class B8) to convenience retail (Use Class E)
-
2026/02750/PA Awaiting decision
Mountain building on junction of Watery Lane Middleway and Kingston Road
Erection of extension to existing tile warehouse building to provide additional ground floor showroom space, including associated external alterations, landscaping, and alterations to external elevations
-
2025/05738/PA Granted
51 Kingston Road Small Heath B9 4JD
Erection of single and two storey rear and single storey side extension
-
2026/00324/PA Refused
123 Digbeth High Street Nechells Birmingham B12 0JU
Display of replacement non-digital advertisement sign
-
2026/00633/PA Granted
193 Camp Hill Highgate Birmingham B12 0JJ
Application to determine the details for condition number 7 (Pre Commencement: Submission of a Construction Environmental Management Plan (CEMP)) attached to reference number 2023/03081/PA
-
2026/02533/PA Awaiting decision
148 Adderley Street Deritend Birmingham B9 4ED
Pre Application Enquiry for proposed change of use of existing premises to a microbrewery with ancillary taproom, outdoor seating area and ancillary food truck/catering area.
Other full applications applications
In Birmingham
-
2026/02114/PA Granted
footpath outside 30 New John Street Birmingham B19 3NB
Installation of 1no. BT street hub unit
-
2026/02177/PA Withdrawn
1 Braham Street London E1 8EE England
Installation of 1No. BT Street Hub Unit and associated advertisement panels on either side of the unit
-
2026/01961/PA Granted
Bellfield Junior And Infant School, Vineyard Road, Birmingham, B31 1PT
Part demolition of existing building and erection of single storey side extension.
-
2026/02398/PA Refused
8 Baker Street Springfield Birmingham B11 4SF
Change of use of ground floor from retail (Use Class E) to 2no. self-contained apartments (Use Class C3)
-
2026/04370/PA Awaiting decision
Birmingham Dental Hospital And School Of Dentistry, 5 Mill Pool Way, Birmingham, B5 7EG
Erection of two single storey extensions to temporary Dental Hospital Operating Theatre and continued use until 31 October 2031.