Planning application
97 Wake Green Road Springfield Moseley Birmingham B13 9US
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of two storey first floor side and single storey side and rear extensions
As published by the council, reference 2025/03118/PA
Application record
- Reference
- 2025/03118/PA
- Type
- Full Planning
- Status
- REGISTERED: Under Assessment
- Received
- 4 Jun 2025
- Validated
- 14 Jul 2025
- Ward
- Sparkhill
- Postcode
- B13 9US
Timeline
Dates from the published record
-
4 Jun 2025
Received by Birmingham
-
14 Jul 2025
Validated
Checked as complete and ready for consideration.
-
7 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 8 September 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Birmingham took a median of 61 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Birmingham for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
7 Mackenzie Road, Birmingham, B11 4EP
Application for a Lawful Development Certificate for loft conversion with hip to gable roof extensions, dormer window to rear, and three roof lights to the front
Refused Lawful development Extension Loft or dormer +1 8 docs -
80 Wake Green Road Birmingham B13 9PY
Erection of two storey side extension and alterations to the windows to the front elevation
Granted Householder Extension Windows or glazing 6 docsDomestic -
115 Wake Green Road Moseley Birmingham B13 9US
Retention of first floor side and two storey rear extension.
Granted Householder Extension 7 docsDomestic -
115 Wake Green Road Moseley Birmingham B13 9US
Application for a minor material amendment to vary condition 2 (approved plans) of planning application ref: 2022/07397/PA to include change of roof design, change of rear and front windows to side extension and alteration of rooflights to side elevations.
Granted Amendments Extension Loft or dormer +1 11 docs -
102 Wake Green Road Springfield Birmingham B13 9PX
Erection of single storey side extension
Granted Householder Extension 11 docsSmall domestic -
80 Wake Green Road Springfield Birmingham B13 9PY
87% historically approved · decision due ~14 Oct
Installation of front and rear dormer windows, and associated roof alterations.
Awaiting decision Householder Loft or dormer Roofing +1 3 docsDomestic
Other full applications applications
In Birmingham
-
2026/02132/PA Granted
Outside 1690 Bristol Road Rednal Birmingham B45 9TZ
Installation of 1no. BT street hub unit
-
2026/02004/PA Granted
311 Fox Hollies Road Acocks Green Olton Birmingham B27 7PS
Erection of single storey flat roof rear extension and rear dormer window to form additional bedrooms
-
2026/03109/PA Granted
Wickes Tameside Business Park Aldridge Road Birmingham Perry Barr B42 2ET
Alterations to existing shopfront comprising new glazing and associated works.
-
2025/05763/PA Granted
land adj to 142 Melton Road Kings Heath Birmingham B14 7ES
Demolition of existing structures/buildings and change of use from builders yard (sui generis) to domestic curtilage (Use Class C3) of no. 142 Melton Road along with associated works (erection of boundary treatment and gate)
-
2025/05722/PA Granted
724A Yardley Wood Road Billesley Birmingham B13 0HY
Installation of new extraction flue, air roof cowl and extract grilles to rear.