Planning application
Riverside Energy From Waste Facility Norman Road Belvedere Kent DA17 6JY
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Application by Cory Environmental Holdings Limited (CEHL) for an Order Granting Development Consent for the Cory Decarbonisation project (EN010128)
As published by the council, reference 23/00892/ALA04
Application record
- Reference
- 23/00892/ALA04
- Type
- Adjoining Local Authority Consultation
- Status
- With Case Officer
- Received
- 18 Apr 2024
- Validated
- 18 Apr 2024
- Ward
- BELVEDERE
- Postcode
- DA17 6JY
Site history
Applications at this address on the Bexley register
This site has had 6 applications since 2024: 1 approved, 0 refused.
-
26/01401/ALA Decided
Riverside Energy From Waste Facility Norman Road Belvedere Kent DA17 6JY
Request to the Planning Inspectorate for a Scoping Opinion: Application by Cory Environmental Holdings Limited (the Applicant) for an Order granting Development Consent for the London Strategic Heat Main. .The applicant has asked the Planning Inspectorate on behalf of the Secretary of State for its written opinion (a Scoping Opinion) as to the scope, and level of detail, of the information to be provided in the ES relating to the proposed development.
-
19/00998/ALA24 Granted
Riverside Energy From Waste Facility Norman Road Belvedere Kent DA17 6JY
Submission to discharge Requirement 25 Use of compost material and gas from Work No. 1B, Schedule 2 of the Riverside Energy Park Order 2020 (as amended).
-
19/00998/ALA23 Awaiting decision
Riverside Energy From Waste Facility Norman Road Belvedere Kent DA17 6JY
Submission to discharge Terms of Reference for the CHP Working Group, as required under Requirement 24 of the Riverside Energy Park Order 2020 (as amended)
-
19/00998/ALA22 Awaiting decision
Riverside Energy From Waste Facility Norman Road Belvedere Kent DA17 6JY
Application for Prior Approval under Requirement 12(2)(b) to vary construction hours in accordance with Requirement 12, Schedule 2 of the Riverside Energy Park Order 2020 (as amended).
-
19/00998/ALA21 Awaiting decision
Riverside Energy From Waste Facility Norman Road Belvedere Kent DA17 6JY
Submission of Amendments to Approved Details (July 2022) in accordance with Requirement 27, Schedule 2 of the Riverside Energy Park Order 2020 (as amended)
Timeline
Dates from the published record
-
18 Apr 2024
Received by Bexley
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 13 June 2024, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Bexley took a median of 56 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Bexley for determination, against a statutory target of eight weeks. Over the last year Bexley decided outline applications in a median of 21 days. More in our guide to how long planning decisions take.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Viking Direct Norman Road Belvedere Kent DA17 6JY
Two externally illuminated free standing totem signs.(Revision to previously approved application ref. 14/00033/ADV)
Granted Advertising 7 docs -
Norman Road North Belvedere London DA17 6JY
Notice of acceptance of an application Under Section 56 of the Planning Act 2008, Regulation 8 of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 and Regulation 16 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 for the provision of a Decarbonisation Project comprising Construction and use of a Carbon Capture Facility, Construction and Use of a New Jetty, Construction and use of pipework connecting the two facilities, Environmental Mitigation Area, Changes to Road Layouts and Temporary Construction Compounds
Withdrawn -
Norman Road North Belvedere London DA17 6JY
Statutory consultation under Section 42 of the Planning Act 2008, Regulation 13 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 and Regulation 4 of the Infrastructure Planning (Applications Prescribed Forms and Procedure) Regulations 2009 for the provision of a Decarbonisation Project comprising Construction and use of a Carbon Capture Facility, Construction and Use of a New Jetty, Construction and use of pipework connecting the two facilities, Environmental Mitigation Area, Changes to Road Layouts and Temporary Construction Compounds.
Decided -
Viking Direct Norman Road Belvedere Kent DA17 6JY
Two externally illuminated free standing totem signs and one non-illuminated fascia sign.
Granted Advertising 15 docs -
Riverside Energy From Waste Facility Norman Road Belvedere Kent DA17 6JY
Submission to discharge Requirement 25 Use of compost material and gas from Work No. 1B, Schedule 2 of the Riverside Energy Park Order 2020 (as amended).
Granted Conditions 5 docs -
Riverside Energy From Waste Facility Norman Road Belvedere Kent DA17 6JY
96% historically approved · decision due ~24 Oct
Submission to discharge Terms of Reference for the CHP Working Group, as required under Requirement 24 of the Riverside Energy Park Order 2020 (as amended)
Awaiting decision Conditions 2 docs
Other outline applications
In Bexley
-
26/01045/OUTM Refused
33-35 Alma Road Sidcup Kent DA14 4ED
Outline application with landscaping reserved for the erection of a three storey residential building containing 12 self-contained units with off street parking following demolition of existing office and storage buildings.
-
26/01401/ALA Decided
Riverside Energy From Waste Facility Norman Road Belvedere Kent DA17 6JY
Request to the Planning Inspectorate for a Scoping Opinion: Application by Cory Environmental Holdings Limited (the Applicant) for an Order granting Development Consent for the London Strategic Heat Main. .The applicant has asked the Planning Inspectorate on behalf of the Secretary of State for its written opinion (a Scoping Opinion) as to the scope, and level of detail, of the information to be provided in the ES relating to the proposed development.
-
26/01402/SCREEN Awaiting decision
Belvedere Industrial Estate Fishers Way Belvedere Kent
Request for a Screening Opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for 'Change of Use from Industrial Storage and Distribution (Class Sui Generis) to Waste Recycling Facility (Class Sui Generis) including the provision of a building, site office/welfare cabins, weighbridges, weighbridge cabin and covered storage bays'.
-
26/00961/ALA Decided
London Borough Of Greenwich 19 Heathwood Gardens Charlton London SE7 8ES
Neighbouring Borough Consultation for: Change of use from an existing single-family dwellinghouse (Use Class C3) to a 4-bed, 4-person HMO (Use Class C4) and all other associated alterations
-
26/00793/SCOPE Decided
Land At Veridon Park Waldrist Way Erith Kent DA18 4AL
Request for a Scoping Opinion for an Environmental Impact Assessment (EIA) in accordance with Schedule 2, paragraph 10(b) of the Town and Country Planning (EIA) Regulations 2017 (as amended) for the proposed industrial, storage and distribution development.