Planning application
45 Malone Park, Belfast, BT9 6NL
Works: Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of condition 6 of LA04/2023/2971/F (Appeal ref. 2025/A0100) and condition 2 of LA04/2023/2972/DCA (Appeal ref. 2025/A0101) in relation to Demolition materials recovery plan (DMRP)
As published by the council, reference LA04/2026/1565/DC
Application record
- Reference
- LA04/2026/1565/DC
- Type
- Discharge of Condition
- Status
- Determined
- Decision
- Granted As published: Condition Partially Discharged
- Received
- 6 Sep 2026
- Validated
- 6 Sep 2026
- Decided
- 10 Sep 2026
- Ward
- Malone
- Postcode
- BT9 6NL
Site history
Applications at this address on the Belfast register
This site has had 4 applications since 2023: 1 approved, 2 refused.
-
LA04/2026/0771/DC Withdrawn
45 Malone Park, Belfast, BT9 6NL
No demolition works shall commence until a Demolition Materials Recovery Plan (DMRP) has been submitted to and approved in writing by the Council. The DMRP shall include: 1. A full audit of all materials arising from the demolition, identifying materials capable or reuse, recycling, or recovery. 2. A schedule of salvage, detailing, quantities, or materials to be salvaged and the methods for their careful removal. 3. A reuse and destination plans, specifying how each category or salvaged material will be used within the development or, where reuse on site is not practicable, the proposed destination and method of recycling or recovery. 4. Verification measures, including how compliance will be recorded and reported to the Council.
-
LA04/2023/2972/DCA Refused
45 Malone Park, Belfast, BT9 6NL
DEMOLITION OF EXISTING DWELLING TO FACILITATE ERECTION OF A NEW DETACHED DWELLING
-
LA04/2023/2971/F Refused
45 Malone Park, Belfast, BT9 6NL
DEMOLITION OF EXISTING DWELLING AND ERECTION OF A NEW DETACHED DWELLING AND ASSOCIATED SITE WORKS
Timeline
Dates from the published record
-
6 Sep 2026
Received by Belfast
-
10 Sep 2026
Decision issued: Condition Partially Discharged
-
19 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Belfast granted permission on 10 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
45 Malone Park, Belfast, BT9 6NL
No demolition works shall commence until a Demolition Materials Recovery Plan (DMRP) has been submitted to and approved in writing by the Council. The DMRP shall include: 1. A full audit of all materials arising from the demolition, identifying materials capable or reuse, recycling, or recovery. 2. A schedule of salvage, detailing, quantities, or materials to be salvaged and the methods for their careful removal. 3. A reuse and destination plans, specifying how each category or salvaged material will be used within the development or, where reuse on site is not practicable, the proposed destination and method of recycling or recovery. 4. Verification measures, including how compliance will be recorded and reported to the Council.
Withdrawn Conditions Demolition 4 docs -
45 Malone Park, Belfast, BT9 6NL
DEMOLITION OF EXISTING DWELLING TO FACILITATE ERECTION OF A NEW DETACHED DWELLING
Refused Heritage and listed buildings New dwelling Demolition 14 docsDomestic -
45 Malone Park, Belfast, BT9 6NL
DEMOLITION OF EXISTING DWELLING AND ERECTION OF A NEW DETACHED DWELLING AND ASSOCIATED SITE WORKS
Refused Full applications New dwelling Demolition 31 docsDomestic -
43a Malone Park, Belfast, BT9 6NL
Discharge condition 3 LA04/2023/2493/DCA - Submission of a Contract Acceptance letter signed by the Client and the Contractor to allow for the demolition of an existing boiler room, conservatory and carport to existing dwelling.
Granted Conditions Extension Demolition 5 docsSmall domestic -
43a Malone Park, Belfast, BT9 6NL
Discharge of Condition 3 LA04/2023/2490/F- Facade Details
Granted Conditions 10 docs -
49 Malone Park, Belfast, BT9 6NN
Demolition of existing rear conservatory, window and door openings, window frames, and internal refurbishment to the existing dwelling
Granted Heritage and listed buildings Extension Demolition +1 22 docsSmall domestic
Other condition discharge and variation applications
In Belfast
-
LA04/2025/0651/DC Granted
721-739 Lisburn Road, Malone Lower, Belfast, BT9 7GU
LA04/2021/0789/F Condition no. 25. Construction, Vibration and Dust Management Plan.
-
LA04/2026/1323/DC Granted
Lands East of Meadowhill, North of Glencolin Court, North and East of Glencolin Rise, East of Glencolin Grove, North and West of Glen Road Rise, and North of Glen Road Grove
Construction Environmental Management Plan (CEMP) - EHA Construction Discharge of condition 10 - LA04/2023/2557/F
-
LA04/2026/1451/DC Granted
1-21 Castlereagh Road, Belfast, BT5 5FB
Discharge Conditions 8 & 10 of Planning Approval LA04/2023/2763/F - remeditation verification report
-
LA04/2026/1655/DC Awaiting decision
1 Havelock House Havelock Place, Ormeau, Belfast, BT7 1EB
Condition 8 of LA04/2024/0626/F. Construction Noise and Vibration Management Plan -
-
LA04/2026/1108/DC Granted
177 Joanmount Gardens, Belfast, BT14 6NZ
Discharge of condition 1 & 2 of planning approval LA04/2022/0401/CA - 1) Service management plan 2) scaled floor plans showing larger front bedroom to be retained as permanent residential accomodation