Skip to content
PlanIndex Get alerts
Menu

Planning application

LA04/2026/0771/DC

45 Malone Park, Belfast, BT9 6NL

Awaiting decision Belfast Discharge of Condition

Proposal

No demolition works shall commence until a Demolition Materials Recovery Plan (DMRP) has been submitted to and approved in writing by the Council. The DMRP shall include: 1. A full audit of all materials arising from the demolition, identifying materials capable or reuse, recycling, or recovery. 2. A schedule of salvage, detailing, quantities, or materials to be salvaged and the methods for their careful removal. 3. A reuse and destination plans, specifying how each category or salvaged material will be used within the development or, where reuse on site is not practicable, the proposed destination and method of recycling or recovery. 4. Verification measures, including how compliance will be recorded and reported to the Council.

As published by the council, reference LA04/2026/0771/DC

Timeline

Dates from the published record

  1. 27 Apr 2026

    Received by Belfast

  2. 22 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Belfast for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • LA04/2026/1193/F Awaiting decision

    53 Malone Park, Belfast, BT9 6NN

    Demolition of the existing single-storey rear extension and construction of a single-storey rear extension, new patio doors to rear elevation, new rear patio and glazed roof over external walkway.

    1 Jul 2026 126m away Full applications
  • LA04/2026/1197/LBC Awaiting decision

    53 Malone Park, Belfast, BT9 6NN

    Demolition of the existing single-storey rear extension and construction of a single-storey rear extension, new patio doors to rear elevation, new rear patio, glazed roof over external walkway, closing up of door to rear elevation, repair and repainting to windows and exterior elements of property and new rain water goods. Internal works comprise replacement of the kitchen, bathrooms and en-suites, internal reconfiguration including removal of non-structural partitions and one structural wall with supporting beam, raising of lower floor level to match the kitchen, thermal upgrades, replacement boiler, and full electrical rewire.

    1 Jul 2026 133m away Heritage and listed buildings
  • 82 Balmoral Avenue, Belfast, BT9 6NY

    Demolition of existing outbuildings and construction of two storey extension and construction of detached double garage to rear of existing dwelling.

    23 Aug 2025 182m away Full applications
  • 82 Balmoral Avenue, Belfast, BT9 6NY

    LA04/2025/1405/F Condition no 3. Drg 08 - Landscape Proposals (LK Design Drg Ref 26-040 82 Balmoral Avenue, Belfast)

    1 Jun 2026 182m away Conditions
  • 82 Balmoral Avenue, Belfast, BT9 6NY

    Demolition of existing outbuildings and construction of two storey extension and construction of detached double garage to rear of existing dwelling.

    6 Sep 2025 183m away Heritage and listed buildings
  • 33 Malone Park, Belfast, BT9 6NL

    Demolition of existing two storey and single storey rear extensions and construction of a new single storey rear extension. Alterations to existing window openings, the introduction of new fenestration, and the construction of a detached garage/ garden room. Installation of solar panels on the roof of the new extension as well as on the flat roof of the garage/garden room.

    28 Oct 2025 240m away Full applications

In Belfast

  • 42-50 Ormeau Road, Belfast

    Written declaration from the supplier and installation contractor of Ventilation and Window Specification Discharge of condition 5 - LA04/2024/0025/F

    21 Apr 2026 Conditions
  • LA04/2026/1281/DC Awaiting decision

    Lands at the Titanic Quarter, between Hamilton Road, Queens Road and Sydenham Road. Immediately NE, E and SE of Belfast Metropolitan College, approximately 150m SE of Titanic Hotel, 8 Queens Road, Belfast, BT3 9DT.

    Partial Discharge of condition 5 of Planning approval LA04/2026/0393/F - Verification Report

    17 Jul 2026 Conditions
  • Glenwood Primary School 4-22 Upper Riga Street, Belfast, BT13 3GW

    Discharge condition 22 of LA04/2022/1206/F. Information of the accredited conservation professional who will oversee and certify the hereby approved works.

    22 May 2026 Conditions
  • Diageo Global Supply 3 Marshalls Road, Belfast, BT5 6SL

    Discharge Conditions 2 & 5 of LA04/2024/0808/F - GQRA and a Final CEMP

    10 Feb 2026 Conditions
  • Essay Musical 87 Castlereagh Road, Belfast, BT5 5FE

    Discharge Condition 2 to planning permission LA04/2021/2612/F management plan for the property.

    17 Jun 2026 Conditions