Skip to content
PlanIndex Get alerts
Menu

Planning application

Belfast City Airport Sydenham Bypass Belfast BT3 9JH Northern Ireland

Granted Belfast LA04/2026/1498/PAN Proposal of Application Notice

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

This PAN relates to a proposed full planning application affecting land within the administrative areas of both Belfast City Council and Ards and North Down Borough Council. Separate PANs have been submitted to each Council and should be read alongside the parallel PAN for the proposed outline planning application at Belfast City Airport. The consultation arrangements set out in Section G apply to both planning applications and to the proposed amendments to the Planning Agreement, which are being undertaken as part of a voluntary public consultation process. Belfast City Airport is proposing a programme of improvements to enhance passenger facilities, improve aircraft operations and strengthen connectivity to and from the airport. The proposals include both physical redevelopment works and changes to existing operational controls set out in the Planning Agreement, including an increase in the permitted number of aircraft take-offs and landings per annum and amendments to the hours during which aircraft operations may take place. The proposed development comprises: •Extensions and alterations to the existing passenger terminal, including construction of a replacement passenger pier and associated aircraft boarding facilities. •Additional aircraft stands and improvements to apron and taxiway infrastructure. •Improvements to airfield operational facilities and supporting infrastructure. •Inclusion of sustainable construction measures and low carbon technologies. •Surface access and infrastructure improvements comprising a multi-modal forecourt. •Enhancements to vehicular access, egress and internal circulation, including creation of a new left slip road from the Sydenham Bypass into the airport and improvements to the airport entrance through a dual right turn lane. •Rationalisation and enhancement of car parking provision, including a creation of a multi-storey car park and long stay car park. •Installation of a foul sewer connection from the onsite pumping station to Kinnegar Wastewater Treatment Works. •A temporary construction compound, and associated infrastructure, engineering, landscaping and ancillary works.

As published by the council, reference LA04/2026/1498/PAN

Application record

Reference
LA04/2026/1498/PAN
Type
Proposal of Application Notice
Status
Determined
Decision
Granted As published: Acceptable
Received
24 Aug 2026
Validated
26 Aug 2026
Decided
14 Sep 2026
Ward
Loughview
Postcode
BT3 9JH

Site history

Applications at this address on the Belfast register

This site has had 2 applications since 2026: 2 approved, 0 refused.

  • Belfast City Airport Sydenham Bypass Belfast BT3 9JH Northern Ireland

    This PAN relates to a proposed outline planning application affecting land within the administrative areas of both Belfast City Council and Ards and North Down Borough Council. Separate PANs have been submitted to each Council and should be read alongside the parallel PAN for the proposed outline planning application at Belfast City Airport. The consultation arrangements set out in Section G apply to both planning applications and to the proposed amendments to the Planning Agreement, which are being undertaken as part of a voluntary public consultation process. Belfast City Airport is proposing a programme of improvements to enhance passenger facilities, improve aircraft operations and strengthen connectivity to and from the airport. This PAN relates to a proposed outline planning application for supporting airport infrastructure and associated development including:: •ancillary aviation operations, including aircraft hangars, aviation fuel tanks and associated infrastructure; •a hotel; •the installation of solar photovoltaic (PV) panels at various locations across the airport; • an electric vehicle charging hub; and • improvements to landscaping, drainage, utilities, servicing infrastructure, and other ancillary development.

    Decided 14 Sep 2026

Timeline

Dates from the published record

  1. 24 Aug 2026

    Received by Belfast

  2. 26 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 4 Sep 2026

    Added to PlanIndex

  4. 14 Sep 2026

    Decision issued: Acceptable

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Belfast granted permission on 14 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Belfast's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles

  • Belfast City Airport Sydenham Bypass Belfast BT3 9JH Northern Ireland

    LA04/2026/1499/PAN Submitted 24 Aug 2026 50 yards away

    This PAN relates to a proposed outline planning application affecting land within the administrative areas of both Belfast City Council and Ards and North Down Borough Council. Separate PANs have been submitted to each Council and should be read alongside the parallel PAN for the proposed outline planning application at Belfast City Airport. The consultation arrangements set out in Section G apply to both planning applications and to the proposed amendments to the Planning Agreement, which are being undertaken as part of a voluntary public consultation process. Belfast City Airport is proposing a programme of improvements to enhance passenger facilities, improve aircraft operations and strengthen connectivity to and from the airport. This PAN relates to a proposed outline planning application for supporting airport infrastructure and associated development including:: •ancillary aviation operations, including aircraft hangars, aviation fuel tanks and associated infrastructure; •a hotel; •the installation of solar photovoltaic (PV) panels at various locations across the airport; • an electric vehicle charging hub; and • improvements to landscaping, drainage, utilities, servicing infrastructure, and other ancillary development.

    Granted 4 docs
  • Belfast City Airport, Sydenham Bypass, Belfast. BT3 9JH

    LA06/2026/0778/PAN Submitted 24 Aug 2026 50 yards away

    Belfast City Airport is proposing a programme of improvements to enhance passenger facilities, improve aircraft operations and strengthen connectivity to and from the airport. This PAN relates to a proposed outline planning application for supporting airport infrastructure and associated development, including: • ancillary aviation operations, including aircraft hangars, aviation fuel tanks and associated infrastructure; • a hotel; • the installation of solar photovoltaic (PV) panels at various locations across the airport; • an electric vehicle charging hub; and • improvements to landscaping, drainage, utilities, servicing infrastructure, and other ancillary development

    Granted 5 docs
  • Belfast City Airport, Sydenham Bypass, Belfast. BT3 9JH

    LA06/2026/0775/PAN Submitted 24 Aug 2026 50 yards away

    Belfast City Airport is proposing a programme of improvements to enhance passenger facilities, improve aircraft operations and strengthen connectivity to and from the airport. The proposals include both physical redevelopment works and changes to existing operational controls set out in the Planning Agreement, including an increase in the permitted number of aircraft take-offs and landings per annum and amendments to the hours during which aircraft operations may take place. The proposed development comprises: • Extensions and alterations to the existing passenger terminal, including construction of a replacement passenger pier and associated aircraft boarding facilities. • Additional aircraft stands and improvements to apron and taxiway infrastructure. • Improvements to airfield operational facilities and supporting infrastructure. • Inclusion of sustainable construction measures and low carbon technologies. • Surface access and infrastructure improvements comprising a multi-modal forecourt. • Enhancements to vehicular access, egress and internal circulation, including creation of a new left slip road from the Sydenham Bypass into the airport and improvements to the airport entrance through a dual right turn lane. • Rationalisation and enhancement of car parking provision, including a creation of a multi-storey car park and long stay car park. • Installation of a foul sewer connection from the onsite pumping station to Kinnegar Wastewater Treatment Works. • A temporary construction compound, and associated infrastructure, engineering, landscaping and ancillary works.

    Granted Extension 6 docs
  • Airbus WPU, Airport Road West, Belfast, BT3 9ED

    LA04/2026/1227/NMC Submitted 6 Jul 2026 400 yards away

    83% historically approved · decision due ~9 Sep

    Non-Material Change to approval LA04/2019/2850/F- minor adjustments including slightly increased office area, changes to office elevations, change to roof profile of autoclave bay, addition of roof access stair to east elevation (of Phase 1A), and increase in comms room to east elevation (of Phase 1A).

    Awaiting decision Amendments 1 doc
  • Spirit Aerosystems, Lands circa. 150m East of 7 Airport Road West, Belfast, BT3 9DZ

    LA04/2025/1780/PAN Submitted 22 Oct 2025 0.3 miles away

    Erection of a new associated office building (approx. 10,125 m² GIA) with associated infrastructure and ancillary facilities, including substations, security and waste management facilities, parking for cars, HGVs and cycles spaces, new site access, internal roads, and all associated works.

    Granted 4 docs