Skip to content
PlanIndex Get alerts
Menu

Planning application

LA04/2026/1079/F

Lands between 120 Ormeau Road and 128-130 Ormeau Road, Belfast, BT7 2EB, Belfast, BT7 2EB

Awaiting decision Belfast Full

Proposal

Temporary Planning Permission (3 years) for outdoor beer garden, bar, servicing area, toilet block, covered seating areas and new doorway. All other ancillary development. (Retrospective)

As published by the council, reference LA04/2026/1079/F

Timeline

Dates from the published record

  1. 3 Jun 2026

    Received by Belfast

  2. 30 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 22 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Belfast for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • LA04/2026/0136/F Awaiting decision

    156 Ormeau Road, Ormeau, Belfast, BT7 2ED

    Construction of a small external extension and alterations to provide new ATM

    20 Jan 2026 125m away Full applications
  • 42-50 Ormeau Road, Belfast

    Written declaration from the supplier and installation contractor of Ventilation and Window Specification Discharge of condition 5 - LA04/2024/0025/F

    21 Apr 2026 204m away Conditions
  • LA04/2026/0696/F Awaiting decision

    2 Cairo Street, Belfast, BT7 1QS

    Two storey rear extension and associated demolition works.

    2 Apr 2026 246m away Full applications
  • LA04/2025/1897/F Awaiting decision

    48 Powerscourt Place, Belfast, BT7 1FX

    Change of use from a 4 bed dwelling to a 5-bedroom/5-person House of Multiple Occupancy (HMO)

    7 Nov 2025 287m away Full applications
  • Global House B & B 87 University Street, Belfast, BT7 1HP

    Replace water damaged dormers to the front of the building with new and install an additional dormer to the front of the building.

    5 Feb 2026 401m away Full applications
  • The Lockhouse 13 River Terrace Belfast BT7 2EN

    New community wellbeing centre and cafe extension to existing lockhouse building

    29 Aug 2025 416m away Full applications

In Belfast

  • 9 Cranmore Park, Belfast, BT9 6JF

    Section 54 application for variation of condition 3 of LA04/2024/1982/F - Retention of clear and obscure glazing within windows

    12 May 2026 Full applications
  • 2a Deramore Park, Belfast, BT9 5JT

    Part-retrospective planning application for the removal of existing gates and hedge to facilitate widening of vehicular access. Installation of new sliding security/privacy gate.

    10 Mar 2026 Full applications
  • 29 Dalebrook Park, Belfast, BT11 9EW

    Two storey side and rear extension with patio

    28 Apr 2026 Full applications
  • 83 Wellington Park, Belfast, BT9 6DP

    Internal and external alterations to 3no. Existing flats including new re-positioned rear external stairway and fenestration

    27 Apr 2026 Full applications
  • 15-19 William Street South, Unit B, Belfast, BT1 4AR

    Alterations to shopfront, including relocation of enterance door, change of material and framing to side door, 3x signage and internal refurbishment

    27 May 2026 Full applications