Skip to content
PlanIndex Get alerts
Menu

Planning application

LA04/2026/0929/F

59 Ravenhill Park, Belfast, BT6 0DG

Awaiting decision Belfast Full

Proposal

Demolition of existing single storey rear extension and erection of single storey rear extension, solar panels and rear patio

As published by the council, reference LA04/2026/0929/F

Timeline

Dates from the published record

  1. 20 May 2026

    Received by Belfast

  2. 22 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Belfast for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 73 Ravenhill Park, Belfast, BT6 0DG

    Partial demolition of existing rear elevation to faciliate single storey side/rear extension.

    18 Feb 2026 107m away Full applications
  • Lands to rear of 34-66 Onslow Parade, Belfast, BT6 0AS

    Proposed removal of Conditon No.21 (Construction Method Statement) of planning approval LA04/2015/0543/F for 'Development of a two storey nursing home including dementia care facilities with access from Mount Merrion Avenue, car parking, landscaping and all associated site works'.

    22 Dec 2025 377m away Full applications
  • 38 Onslow Gardens, Belfast, BT6 0AQ

    Single-storey rear extension, including demolition of the existing single-storey room, removal of the existing kitchen roof, partial demolition of the rear wall (ground floor level) and existing living room window, and formation of a new gable window.

    23 Feb 2026 420m away Full applications
  • 97 Ardenlee Avenue, Belfast, BT6 0AD

    Non Material Change to LA04/2025/0024/F. Addition of frosted window to first floor bathroom.

    19 Aug 2025 451m away Amendments
  • 39 Haddington Gardens, Belfast, BT6 0AN

    Attic conversion with rear dormer

    4 Aug 2025 463m away Full applications
  • 68 Knock Eden Park, Belfast, BT6 0JG

    Two storey extension to side and rear and single storey extension to rear. Elevation changes including 2 no. rooflights to the side and rear of the existing roof; garden store to rear boundary; new boundary treatments.

    23 Dec 2025 468m away Full applications

In Belfast

  • 9 Cranmore Park, Belfast, BT9 6JF

    Section 54 application for variation of condition 3 of LA04/2024/1982/F - Retention of clear and obscure glazing within windows

    12 May 2026 Full applications
  • 2a Deramore Park, Belfast, BT9 5JT

    Part-retrospective planning application for the removal of existing gates and hedge to facilitate widening of vehicular access. Installation of new sliding security/privacy gate.

    10 Mar 2026 Full applications
  • 29 Dalebrook Park, Belfast, BT11 9EW

    Two storey side and rear extension with patio

    28 Apr 2026 Full applications
  • 83 Wellington Park, Belfast, BT9 6DP

    Internal and external alterations to 3no. Existing flats including new re-positioned rear external stairway and fenestration

    27 Apr 2026 Full applications
  • 15-19 William Street South, Unit B, Belfast, BT1 4AR

    Alterations to shopfront, including relocation of enterance door, change of material and framing to side door, 3x signage and internal refurbishment

    27 May 2026 Full applications