Skip to content
PlanIndex Get alerts
Menu

Planning application

LA04/2026/0839/F

40 Beechgrove Avenue, Belfast, BT6 0NF

Awaiting decision Belfast Full

Proposal

Single storey rear/side extension.

As published by the council, reference LA04/2026/0839/F

Timeline

Dates from the published record

  1. 1 May 2026

    Received by Belfast

  2. 27 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 22 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Belfast for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 3 Beechgrove Crescent, Belfast, BT6 0NG

    Proposed porch over front door and proposed rear single storey extension

    30 Mar 2026 124m away Full applications
  • 49 Beechgrove Gardens, Belfast, BT6 0NN

    Two storey side and rear extension with partial single storey rear extension and raised rear patio area with under croft. Fenestration changes, Installation of PV panels and heat pump and associated site works. (Amended Proposal Description).

    1 Apr 2026 171m away Full applications
  • 13 Beechgrove Park, Belfast, BT6 0NQ

    Single storey rear extension, raised patio and steps to rear, garden store beneath patio and new side window.

    10 Nov 2025 187m away Full applications
  • 4 Beechgrove Drive, Belfast, BT6 0NW

    Demolition of existing front porch and replacement proposed porch on the same footprint as existing with new access steps.

    19 Mar 2026 228m away Full applications
  • 2 Beechgrove Drive, Belfast, BT6 0NW

    single storey side and rear extension and replacement two storey garage with ancillary first floor storage space

    14 Oct 2025 233m away Full applications
  • LA04/2026/0709/NMC Awaiting decision

    190 Upper Knockbreda Road, Belfast, BT6 0NB

    The original application LA04/2024/1504/F included raising roof of existing garage to create roof space office. This is to be omitted. The proposed extension to the front will be retained with the existing garage being converted to a garden room.

    16 Apr 2026 315m away Amendments

In Belfast

  • 9 Cranmore Park, Belfast, BT9 6JF

    Section 54 application for variation of condition 3 of LA04/2024/1982/F - Retention of clear and obscure glazing within windows

    12 May 2026 Full applications
  • 2a Deramore Park, Belfast, BT9 5JT

    Part-retrospective planning application for the removal of existing gates and hedge to facilitate widening of vehicular access. Installation of new sliding security/privacy gate.

    10 Mar 2026 Full applications
  • 29 Dalebrook Park, Belfast, BT11 9EW

    Two storey side and rear extension with patio

    28 Apr 2026 Full applications
  • 83 Wellington Park, Belfast, BT9 6DP

    Internal and external alterations to 3no. Existing flats including new re-positioned rear external stairway and fenestration

    27 Apr 2026 Full applications
  • 15-19 William Street South, Unit B, Belfast, BT1 4AR

    Alterations to shopfront, including relocation of enterance door, change of material and framing to side door, 3x signage and internal refurbishment

    27 May 2026 Full applications