Planning application
49 OXFORD STREET, BELFAST, BT1 3LA
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of a freestanding Street Hub, comprising of two digital 75-inch LCD display screens each side of the unit, to replace a BT Telephone Kiosk as existing.
As published by the council, reference LA04/2026/0362/F
Application record
- Reference
- LA04/2026/0362/F
- Type
- Full
- Status
- Consultation Open
- Received
- 23 Feb 2026
- Validated
- 6 Mar 2026
- Ward
- Central
- Postcode
- BT1 3LA
Site history
Applications at this address on the Belfast register
This site has had 2 applications since 2026.
-
LA04/2026/0363/A Awaiting decision
49 OXFORD STREET, BELFAST, BT1 3LA
Two digital 75-inch LCD display screens each side of the Street Hub
Timeline
Dates from the published record
-
23 Feb 2026
Received by Belfast
-
6 Mar 2026
Validated
Checked as complete and ready for consideration.
-
22 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 1 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Belfast took a median of 104 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Gravis Planning Ltd Agent, a planning consultancy registered in Holywood
Active · incorporated 2005 · Holywood
236 applications on PlanIndex · across 40 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Belfast for determination, against a statutory target of eight weeks. Over the last year Belfast decided full applications in a median of 121 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
49 OXFORD STREET, BELFAST, BT1 3LA
98% historically approved · decision due ~1 May
Two digital 75-inch LCD display screens each side of the Street Hub
Awaiting decision Advertising 10 docs -
9 Lanyon Place, Belfast, BT1 3LP
97% historically approved · decision due ~22 Sep
Proposed change of use from offices on ground floor to retail, restaurant and residents’ gym. Alteration and change of use of fifth floor offices to accommodate apartments and removal of roof top plant floor and construction of apartments at existing plant floor level. Construction of two additional floors to accommodate apartments (105no. apartments in total). Alterations to re-configure and to provide new entrances and vertical circulation. Associated landscaping and services.
Awaiting decision Full applications New dwelling 45 docsMajor scheme -
The Soloist Building 1 Lanyon Place Belfast BT1 3LP.
3D Logo - Lettering for The bank of london brand on 2 locations on Soloist building in vertical allignment with other signage at higher levels.
Granted Advertising 13 docs -
Royal Courts of Justice, May Street, Belfast, BT1 3JJ
Alterations to existing corridors to create fire compartmentation incorporating 5No. New hardwood double doors and associated stud walls.
Granted Heritage and listed buildings 9 docs -
BRIAN GRAHAM BOOKMAKERS 15 VERNER STREET TOWN PARKS BELFAST ANTRIM BT7 2AA
97% historically approved · decision due ~22 Sep
Retrospective change of use from vacant betting shop unit to a storage and prep unit for a business trading at St Georges Market.
Awaiting decision Full applications 12 docs -
Hilton Hotel, 4 Lanyon Place, Belfast, BT1 3LP
Works include the removal of existing roof plant. Installation of a new structural frame to carry 8nr new air source heat pumps. Alongside this the existing flat-roof covering will be renewed and insulation upgraded.
Granted Full applications Roofing 17 docs
Other full applications
In Belfast
-
LA04/2025/0110/F Granted
Hammer Playing Pitch Agnes Street, Shankill Road, Belfast, BT13
Resurfacing and minor extension of existing 3G pitch; replacement floodlighting; 50 seater covered mini-stand (3.8m tall by 7.5m long and 3.3m wide); additional 1.2m fencing enclosure to pitch; replacement dugouts: storage container (3.6m by 2.4m); removal of portacabin and associated minor works/drainage modifications.
-
LA04/2025/2176/F Granted
15 Stockmans Avenue, Belfast, BT11 9AS
Addition of a two-storey rear extension to existing dwelling, and small rear decking area
-
LA04/2026/0043/F Granted
1 Greystown Avenue, Belfast, BT9 6UG
Proposed extensions to side & rear elevation, together with facade alterations to front of existing dwelling & recladding of existing dormer to rear (Amended Plans)
-
LA04/2025/1768/F Granted
Lands at Apartment Blocks 1-3 Clonaver Drive, Belfast, BT4 2FB
Proposed amendment to condition No.7 of planning approval LA04/2023/2709/F to no longer provide and install the vapour protection measures that were originally requested.
-
LA04/2025/2202/F Granted
104 Gilnahirk Road, Belfast, BT5 7DJ
Single storey side extension. First floor side window to Eastern elevation. Replacement side windows.