Planning application
LA04/2026/0310/F
Office Ground Floor 27-29 Gordon Street, Belfast, BT1 2LG
Proposal
Change of use from commercial office space (B1) to laser tattoo & hair removal studios (Sui Generis).
As published by the council, reference LA04/2026/0310/F
Timeline
Dates from the published record
-
19 Feb 2026
Received by Belfast
-
22 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Belfast for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
LA04/2025/1401/LBC Granted
Ulster Scots Community Network 1-9 Victoria Street, Belfast, BT1 3GA
Repair and renovation to historical facades of the Corn Exchange Building on Victoria and Gordon Street, including repairs to the existing ashlar sandstone features, use of replacement stone and application of specialist repair mortars as required.
-
LA04/2025/1892/DCA Granted
39 Gordon Street, 2-14 Dunbar Street, Belfast, BT1 2LH
Partial demolition of front elevation to accommodate widened door access at ground floor level and partial demolition of wall on flat roof to accommodate new rooftop bar. (Amended description)
-
LA04/2026/0732/LBC Awaiting decision
Dirty Onion 3 Hill Street, Belfast, BT1 2LA
Remedial works to external timber frame
-
LA04/2025/2084/DCA Granted
1 Hill Street, Belfast, BT1 2LA
Demolition of toilet units within the existing beer garden area of the premises. No change to external elements.
-
LA04/2025/1511/A Awaiting decision
11-17 Corporation Street, Belfast, BT1 3BA
Two retrospective banner adverts
-
LA04/2025/1643/F Granted
6 Tomb Street, Belfast, BT1 3AS
Retrospective: Extension to existing car park, erection of fencing, alterations to building facade and additional site works
Other full applications applications
In Belfast
-
LA04/2026/0883/F Granted
9 Cranmore Park, Belfast, BT9 6JF
Section 54 application for variation of condition 3 of LA04/2024/1982/F - Retention of clear and obscure glazing within windows
-
LA04/2026/0470/F Granted
2a Deramore Park, Belfast, BT9 5JT
Part-retrospective planning application for the removal of existing gates and hedge to facilitate widening of vehicular access. Installation of new sliding security/privacy gate.
-
LA04/2026/0820/F Granted
29 Dalebrook Park, Belfast, BT11 9EW
Two storey side and rear extension with patio
-
LA04/2026/0774/F Granted
83 Wellington Park, Belfast, BT9 6DP
Internal and external alterations to 3no. Existing flats including new re-positioned rear external stairway and fenestration
-
LA04/2026/0981/F Granted
15-19 William Street South, Unit B, Belfast, BT1 4AR
Alterations to shopfront, including relocation of enterance door, change of material and framing to side door, 3x signage and internal refurbishment