Planning application
LA04/2025/1311/PAN
Lands at Donegall Quay, Tomb Street, Gamble Street, Little Patrick Street and under the M3 flyover bridge at Donegall Quay and Corporation Street
Proposal
Public realm and road improvements including development of urban sports park below the M3 flyover at Corporation Street / Tomb Street and new public space below the M3 flyover at Donegall Quay.
As published by the council, reference LA04/2025/1311/PAN
Timeline
Dates from the published record
-
6 Aug 2025
Received by Belfast
-
22 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Belfast for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About this record
Reading the register
This page mirrors an entry on the statutory planning register that Belfast is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.
Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.
Nearby applications
Within 500 metres
-
LA04/2025/2018/F Awaiting decision
Lands at Donegall Quay, Tomb St. to north of Albert Square, Gamble St. to south of Corporation Sq, Little Patrick St. to east of Nelson St. & under the M3 bridge at Donegall Quay and Corporation St., Belfast, BT1 1AA
Public realm and road improvements including development of urban recreation space below the M3 flyover at Corporation Street / Tomb Street and new public space below the M3 flyover at Donegall Quay.
-
LA04/2025/1643/F Granted
6 Tomb Street, Belfast, BT1 3AS
Retrospective: Extension to existing car park, erection of fencing, alterations to building facade and additional site works
-
LA04/2025/1511/A Awaiting decision
11-17 Corporation Street, Belfast, BT1 3BA
Two retrospective banner adverts
-
LA04/2026/0676/F Awaiting decision
Belfast Harbour Office and William Ritchie Building, Corporation Square and 2 Clarendon Road, Belfast.
New entrance to the William Ritchie Building,pedestrian steps and ramped access. Rear extension. Roof extension with landscaped roof terrace, external plant area and rear escape staircase. Replacement link bridge between William Ritchie and Belfast Harbour Office. Reinstatement of existing cellar and Northern gable of the listed Belfast Harbour Office. Landscaping and Hardstanding works. New gate and railings to Eastern perimeter of Belfast Harbour Office, associated site works.
-
LA04/2026/1165/A Awaiting decision
City Quays 3 Clarendon Road, Belfast, BT1 3BG
Installation of 2 no. illuminated signs to the external North and South elevations of the building.
-
LA04/2026/1100/NMC Awaiting decision
City Quays 3 Clarendon Road, Belfast, BT1 3BG
Non-material change to reserved matters approval LA04/2017/1090/RM, comprising the installation of 4 no. external louvres to the north-east elevation at floor 9.