Planning application
Unit 9 Somerton Industrial Park 61-119 Dargan Crescent, Belfast, BT3 9JB
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Retention of existing rear Lean-to, concrete yard area and existing timber fence & gates (Amended Application form and description).
As published by the council, reference LA04/2025/0370/F
Application record
- Reference
- LA04/2025/0370/F
- Type
- Full
- Status
- Consultation Open
- Received
- 6 Mar 2025
- Validated
- 14 Mar 2025
- Ward
- Duncairn
- Postcode
- BT3 9JB
Timeline
Dates from the published record
-
6 Mar 2025
Received by Belfast
-
14 Mar 2025
Validated
Checked as complete and ready for consideration.
-
6 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 9 May 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Belfast took a median of 99 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, a planning consultancy registered in Belfast
76 applications on PlanIndex · across 7 councils · 89% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Belfast for determination, against a statutory target of eight weeks. Over the last year Belfast decided full applications in a median of 119 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Belfast Wastewater Treatment Works Duncrue Street, Belfast, BT3 9JB
98% historically approved · decision due ~21 Apr
New Inlet Pumping Station Motor Control Centre (MCC) Building on vacant land within the existing Belfast Wastewater Treatment Works boundary, to include new building and fencing to the site boundary.
Awaiting decision Full applications 17 docs -
Duncrue Complex, Duncrue Road, Belfast BT3 9BP
Erection of a store to be used as a workshop for Eurobins
Granted Full applications 15 docs -
1-9 Duncrue Place, Belfast, BT3 9JP
Erection of waste transfer facility, ancillary office accommodation, staff welfare facilities, service yard, car parking and access arrangements from Duncrue link and Duncrue Place and associated site works.
Decided 3 docs
Other full applications
In Belfast
-
LA04/2025/1954/F Granted
16 Sans Souci Park, Belfast, BT9 5BZ
Solar Panels on the south facing roof slope
-
LA04/2026/0711/F Granted
10 Casaeldona Rise, Belfast, BT6 9RA
single-storey rear extension and first-floor rear extension; alterations to windows
-
LA04/2026/0421/F Withdrawn
Footpath south of 272-274 Upper Newtownards Road, Belfast, County Antrim, BT4 3EU
Existing 11.5m lamp post to be removed and replaced with a 20m street pole with a wraparound cabinet. Proposed 9no. antennas, 2no. GPS nodes, 1no. bowler cabinet, 1no. cabinet, and ancillary upgrades thereto.
-
LA04/2026/0374/F Granted
17 Castlemore Avenue, Belfast, BT6 9RF
Retention of lean to garage to side of dwelling and area of hardstanding to front (Amended Description and plans).
-
LA04/2025/0635/F Refused
142 Ravenhill Road, Belfast, BT6 8ED
Change of use from ground floor shop (A1) to studio apartment (C1) alterations to building facades and additional site works.