Skip to content
PlanIndex Get alerts
Menu

Planning application

2a Wilgar Street , Belfast, BT4 3BL

Awaiting decision Belfast LA04/2025/0080/F Full

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Replacement of an existing grass playing field with a 3G sports pitch, all associated works and upgrade of floodlight lighting lamp heads & LED bulbs

As published by the council, reference LA04/2025/0080/F

Application record

Reference
LA04/2025/0080/F
Type
Full
Status
Under Consideration
Received
21 Jan 2025
Validated
13 Feb 2025
Ward
Connswater
Postcode
BT4 3BL

Timeline

Dates from the published record

  1. 21 Jan 2025

    Received by Belfast

  2. 13 Feb 2025

    Validated

    Checked as complete and ready for consideration.

  3. 6 Aug 2026

    Added to PlanIndex

  4. 13 Aug 2026

    Status changed to Under Consideration

    Previously Site Inspection Complete.

  5. Decision

    Awaiting decision

    Decision expected by 10 April 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Belfast took a median of 99 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Coalisland

22 applications on PlanIndex · across 5 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

41 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Belfast for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 70 Oakland Avenue, Belfast, BT4 3BX

    LA04/2025/2123/F Submitted 8 Dec 2025 139m away

    Rear dormer and roof light to front elevation

    Granted Full applications Loft or dormer 11 docs
  • 4 Clanroy Parade, Belfast, BT4 3BZ

    LA04/2026/0307/F Submitted 18 Feb 2026 139m away

    98% historically approved · decision due ~15 Apr

    Rear dormer with 3no. roof lights to the front of the dwelling.

    Awaiting decision Full applications Loft or dormer 9 docs
    Domestic
  • 152-154 Holywood Road, Belfast, BT4 1NY

    LA04/2024/1189/F Submitted 29 May 2024 168m away

    Replacement of entrance canopy, new awning, photovoltaic panels on roof, insertion of new windows, elevation changes and associated site works.

    Granted Full applications Windows or glazing 15 docs
  • The Strand Arts Centre 152-154 Holywood Road, Belfast, BT4 1NY

    PP-137796941LA04A Submitted 19 Feb 2025 169m away

    99% historically approved · decision due ~16 Apr

    5 signs including; illluminated LED lettering, outdoor lightbox, LED display screen, illuminated readograph and illuminated neon lettering

    Awaiting decision Advertising
  • The Strand Arts Centre 152-154 Holywood Road, Belfast, BT4 1NY

    PP-13779694/1/LA04/A Submitted 19 Feb 2025 169m away

    99% historically approved · decision due ~16 Apr

    5 signs including; illluminated LED lettering, outdoor lightbox, LED display screen, illuminated readograph and illuminated neon lettering

    Awaiting decision Advertising 5 docs
  • 71 Belmont Road, Belfast, BT4 2AA

    LA04/2026/1143/A Submitted 22 Jun 2026 183m away

    99% historically approved · decision due ~13 Sep

    Proposed Signage to first floor windows and ground floor door

    Awaiting decision Advertising Windows or glazing 7 docs

In Belfast

  • 5 Kingsway Gardens, Belfast, BT5 7DQ

    Rear extension and rear dormer. Existing roof to be re-tiled.

    26 May 2026 Full applications
  • 67 Martinez Avenue, Belfast, BT5 5LY

    Retrospective raised patio to the rear of the property

    27 Apr 2026 Full applications
  • LA04/2026/1520/F Awaiting decision

    64 Sandhurst Drive, Belfast, BT9 5AZ

    Demolition of existing garage and addition of two storey side and rear extension, including internal alterations.

    29 Aug 2026 Full applications
  • Parkdean Care Home 44 Fortwilliam Park, Belfast, BT15 4AS

    Proposed creation of front and rear landscaped garden areas, alterations to ground levels, new garden building, new boundary fencing and landscaping.

    12 Dec 2025 Full applications
  • 5 Diamond Avenue, Belfast, BT10 0HG

    Single-storey front extension and fenestration changes (Amended description)

    28 May 2026 Full applications