Skip to content
PlanIndex Get alerts
Menu

Planning application

71 Putnoe Lane Bedford Bedfordshire MK41 9AE

Awaiting decision Bedford 26/01137/FUL Full applications

Works: New dwelling

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of new self-build 4 bedroom home to the rear of 71 Putnoe Lane, with soft and hard landscaping, and new boundary treatment.

As published by the council, reference 26/01137/FUL

Application record

Reference
26/01137/FUL
Category
Full applications
Status
Awaiting decision
Received
17 Jun 2026
Validated
28 Jul 2026
Ward
Putnoe
Parish
Bedford Town
Postcode
MK41 9AE

Timeline

Dates from the published record

  1. 17 Jun 2026

    Received by Bedford

  2. 28 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 8 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 22 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Bedford took a median of 55 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice

2 applications on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

What happens while it is decided

The process from here

This application is with Bedford for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 66 Putnoe Lane Bedford Bedfordshire MK41 9AF

    26/01052/S73 Submitted 3 Jun 2026 85m away

    76% historically approved · decision due ~29 Jul

    Single storey side and rear extension including variation of approved plans condition 2 attached to 23/01415/FUL to allow for alterations to dimensions. The condition to be changed as per the attached new plans.

    Awaiting decision Amendments Extension
    Small domestic
  • Wildings 76A Putnoe Lane Bedford Bedfordshire MK41 9AF

    26/01047/FUL Submitted 3 Jun 2026 87m away

    83% historically approved · decision due ~30 Jul

    Single storey rear extension, dormer roof extension to first floor and loft conversion

    Decided Full applications Extension Loft or dormer
    Small domestic
  • 43 Poplar Avenue Bedford Bedfordshire MK41 8BL

    26/01316/FUL Submitted 10 Jul 2026 148m away

    83% historically approved · decision due ~4 Sep

    Single storey front extension to form new porch

    Awaiting decision Full applications Extension
    Small domestic
  • 45 Poplar Avenue Bedford Bedfordshire MK41 8BL

    26/01315/FUL Submitted 10 Jul 2026 148m away

    83% historically approved · decision due ~4 Sep

    Front porch (single storey) and single storey side extension

    Awaiting decision Full applications Extension
    Small domestic
  • 24 Putnoe Lane Bedford Bedfordshire MK41 9AB

    26/00882/FUL Submitted 11 May 2026 232m away

    83% historically approved · decision due ~6 Jul

    Single storey rear extension with pitch roof and 4 roof lights. Masonry parapet walls to car port with flat roof.

    Awaiting decision Full applications Extension Loft or dormer 7 docs
    Small domestic
  • Land At The Rear Of 1 Putnoe Lane Bedford Bedfordshire MK41 9AD

    23/00027/FUL Submitted 6 Jan 2023 250m away

    Erection of a two bedroom bungalow

    Refused Full applications 20 docs

In Bedford

  • 26/01695/FUL Awaiting decision

    37 Green Lane Wixams Bedford Bedfordshire MK42 6DA

    Demolition of conservatory and erection of a single storey side extension.

    3 Sep 2026 Full applications
  • 26/01689/FUL Awaiting decision

    2 Cromwell Road Bedford Bedfordshire MK40 4LR

    Change of Use of first floor to residential flat, including attic conversion with rear dormer, enabling the creation of a live-work unit.

    2 Sep 2026 Full applications
  • 26/01681/FUL Awaiting decision

    33 - 35 St Peters Street Bedford Bedfordshire MK40 2PN

    Formation of a patient set-down and pick-up facility, ancillary to the existing dental use (Use Class E), within the rear curtilage; comprising partial demolition of the rear boundary wall to form a new vehicular access from the rear service lane, one accessible (disabled) transfer bay and one set-down space with associated hardstanding and drainage, boundary treatment, cycle and refuse storage, and an electric vehicle charging point.

    1 Sep 2026 Full applications
  • 26/01684/FUL Awaiting decision

    4 Miller Close Clapham Bedford Bedfordshire MK41 6GN

    Roof to be raised with addition of rear box dormer to allow loft conversion

    1 Sep 2026 Full applications
  • 26/01677/FUL Awaiting decision

    4 Blackberry Close Great Barford Bedford Bedford MK44 3FY

    Insertion of 2 additional rooflights to existing 2nd floor and 2 windows to RH (North) elevation

    31 Aug 2026 Full applications