Planning application
58 Bedford Road Great Barford Bedford Bedfordshire MK44 3JF
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Conversion of existing swimming pool outbuilding to form ancillary annex to provide dependant relative accommodation.
As published by the council, reference 26/01096/FUL
Application record
- Reference
- 26/01096/FUL
- Category
- Full applications
- Status
- Awaiting decision
- Received
- 10 Jun 2026
- Validated
- 16 Jun 2026
- Ward
- Great Barford
- Parish
- Great Barford
- Postcode
- MK44 3JF
Timeline
Dates from the published record
-
10 Jun 2026
Received by Bedford
-
16 Jun 2026
Validated
Checked as complete and ready for consideration.
-
8 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 11 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Bedford took a median of 55 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Bedford
4 applications on PlanIndex · across 2 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itWhat happens while it is decided
The process from here
This application is with Bedford for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
60 Bedford Road Great Barford Bedford Bedfordshire MK44 3JF
83% historically approved · decision due ~22 Jul
Internal alterations including the conversion of existing attached barn to habitable accommodation, demolition of existing attached shed and the construction of new detached garage
Awaiting decision Full applications Demolition 9 docsSmall domestic -
54 Bedford Road Great Barford Bedford Bedfordshire MK44 3JF
21/01816/OUT - Condition 12 - Energy Statement (discharge of condition)
Granted Conditions 8 docs -
54 Bedford Road Great Barford Bedford Bedfordshire MK44 3JF
All Reserved Matters for the erection of a single dwelling with integral double garage and all ancillary works, pursuant to Outline permission 21/01816/OUT.
Granted Reserved matters 45 docsDomestic -
52 Silver Street Great Barford Bedford Bedfordshire MK44 3JA
76% historically approved · decision due ~29 Jul
Replacement windows and door at front of property.
Decided Heritage and listed buildings Windows or glazing -
5 Huntsfield Great Barford Bedford MK44 3HJ
Part two storey, part single storey rear extension.
Refused Full applications ExtensionSmall domestic -
3 Hare Meadow Great Barford Bedford Bedfordshire MK44 3ES
Certificate to confirm that the details submitted do not require planning permission (Loft conversion)
Granted Lawful development Loft or dormer 7 docs
Other full applications applications
In Bedford
-
26/01695/FUL Awaiting decision
37 Green Lane Wixams Bedford Bedfordshire MK42 6DA
Demolition of conservatory and erection of a single storey side extension.
-
26/01689/FUL Awaiting decision
2 Cromwell Road Bedford Bedfordshire MK40 4LR
Change of Use of first floor to residential flat, including attic conversion with rear dormer, enabling the creation of a live-work unit.
-
26/01681/FUL Awaiting decision
33 - 35 St Peters Street Bedford Bedfordshire MK40 2PN
Formation of a patient set-down and pick-up facility, ancillary to the existing dental use (Use Class E), within the rear curtilage; comprising partial demolition of the rear boundary wall to form a new vehicular access from the rear service lane, one accessible (disabled) transfer bay and one set-down space with associated hardstanding and drainage, boundary treatment, cycle and refuse storage, and an electric vehicle charging point.
-
26/01684/FUL Awaiting decision
4 Miller Close Clapham Bedford Bedfordshire MK41 6GN
Roof to be raised with addition of rear box dormer to allow loft conversion
-
26/01677/FUL Awaiting decision
4 Blackberry Close Great Barford Bedford Bedford MK44 3FY
Insertion of 2 additional rooflights to existing 2nd floor and 2 windows to RH (North) elevation