Skip to content
PlanIndex Get alerts
Menu

Planning application

3 George Street Bedford Bedfordshire MK40 3RY

Awaiting decision Bedford 26/00644/FUL Full Planning

Works: Loft or dormer Roofing Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Roof Alterations to create loft with full width dormer, Juliet balcony to rear and velux window to the street elevation.

As published by the council, reference 26/00644/FUL

Application record

Reference
26/00644/FUL
Type
Full Planning
Status
Awaiting decision
Received
7 Apr 2026
Validated
14 Apr 2026
Ward
Castle & Newnham
Parish
Bedford Town
Postcode
MK40 3RY

Timeline

Dates from the published record

  1. 7 Apr 2026

    Received by Bedford

  2. 14 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 19 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 9 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Bedford took a median of 55 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

20 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Bedford for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 31 Russell Avenue Bedford MK40 3TD

    03/02937/TCA Submitted 5 Dec 2003 135m away

    Felling of Sycamore tree.

    Decided Trees
  • 76 Phillpotts Avenue Bedford Bedfordshire MK40 3UD

    26/01054/FUL Submitted 3 Jun 2026 175m away

    83% historically approved · decision due ~29 Jul

    Loft conversion with rear dormer.

    Awaiting decision Full applications Loft or dormer
  • 76 Phillpotts Avenue Bedford Bedfordshire MK40 3UD

    26/00629/LDP Submitted 1 Apr 2026 175m away

    Certificate to confirm that the details submitted do not require planning permission. (Loft conversion)

    Granted Lawful development Loft or dormer 8 docs
  • 64 Phillpotts Avenue Bedford Bedfordshire MK40 3UD

    22/02434/FUL Submitted 7 Nov 2022 175m away

    Demolition of existing conservatory structure and erection of single storey extension along with loft conversion including hip to gable roof extension and rear dormer.

    Granted Full applications Extension Loft or dormer +1 9 docs
    Small domestic
  • 24 Phillpotts Avenue Bedford Bedfordshire MK40 3UF

    26/00497/FUL Submitted 13 Mar 2026 247m away

    Removal of existing out-shut and conservatory and erection of single storey rear extension

    Granted Full applications Extension 9 docs
    Small domestic
  • 11 Beresford Road Bedford Bedford MK40 3SD

    26/01268/HPN Submitted 6 Jul 2026 250m away

    76% historically approved · decision due ~31 Aug

    Prior notification for single storey rear extension(s) between 3 and 6 metres depth. This is not a planning application because it relates to development that is permitted by Government Regulation. It will not therefore be reported to the Planning Committee but considered by officers under delegated powers. Only objections from adjoining neighbours can be considered.

    Decided Extension
    Small domestic

In Bedford

  • 26/01695/FUL Awaiting decision

    37 Green Lane Wixams Bedford Bedfordshire MK42 6DA

    Demolition of conservatory and erection of a single storey side extension.

    3 Sep 2026 Full applications
  • 26/01689/FUL Awaiting decision

    2 Cromwell Road Bedford Bedfordshire MK40 4LR

    Change of Use of first floor to residential flat, including attic conversion with rear dormer, enabling the creation of a live-work unit.

    2 Sep 2026 Full applications
  • 26/01681/FUL Awaiting decision

    33 - 35 St Peters Street Bedford Bedfordshire MK40 2PN

    Formation of a patient set-down and pick-up facility, ancillary to the existing dental use (Use Class E), within the rear curtilage; comprising partial demolition of the rear boundary wall to form a new vehicular access from the rear service lane, one accessible (disabled) transfer bay and one set-down space with associated hardstanding and drainage, boundary treatment, cycle and refuse storage, and an electric vehicle charging point.

    1 Sep 2026 Full applications
  • 26/01684/FUL Awaiting decision

    4 Miller Close Clapham Bedford Bedfordshire MK41 6GN

    Roof to be raised with addition of rear box dormer to allow loft conversion

    1 Sep 2026 Full applications
  • 26/01677/FUL Awaiting decision

    4 Blackberry Close Great Barford Bedford Bedford MK44 3FY

    Insertion of 2 additional rooflights to existing 2nd floor and 2 windows to RH (North) elevation

    31 Aug 2026 Full applications