Skip to content
PlanIndex Get alerts
Menu

Planning application

The Willows 38 Sandy Road Willington Bedford Bedfordshire MK44 3QS

Granted Bedford 23/00144/FUL Full Planning

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey rear and side extensions and alterations

As published by the council, reference 23/00144/FUL

Application record

Reference
23/00144/FUL
Type
Full Planning
Status
Decided - Permitted
Decision
Grant Permission
Received
23 Jan 2023
Validated
23 Jan 2023
Decided
7 Mar 2023
Ward
Great Barford
Parish
Willington
Decision by
Officers (Delegated)
Postcode
MK44 3QS

Timeline

Dates from the published record

  1. 23 Jan 2023

    Received by Bedford

  2. 7 Mar 2023

    Decision issued: Grant Permission

  3. 19 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Bedford

  • 26/01695/FUL Awaiting decision

    37 Green Lane Wixams Bedford Bedfordshire MK42 6DA

    Demolition of conservatory and erection of a single storey side extension.

    3 Sep 2026 Full applications
  • 26/01689/FUL Awaiting decision

    2 Cromwell Road Bedford Bedfordshire MK40 4LR

    Change of Use of first floor to residential flat, including attic conversion with rear dormer, enabling the creation of a live-work unit.

    2 Sep 2026 Full applications
  • 26/01681/FUL Awaiting decision

    33 - 35 St Peters Street Bedford Bedfordshire MK40 2PN

    Formation of a patient set-down and pick-up facility, ancillary to the existing dental use (Use Class E), within the rear curtilage; comprising partial demolition of the rear boundary wall to form a new vehicular access from the rear service lane, one accessible (disabled) transfer bay and one set-down space with associated hardstanding and drainage, boundary treatment, cycle and refuse storage, and an electric vehicle charging point.

    1 Sep 2026 Full applications
  • 26/01684/FUL Awaiting decision

    4 Miller Close Clapham Bedford Bedfordshire MK41 6GN

    Roof to be raised with addition of rear box dormer to allow loft conversion

    1 Sep 2026 Full applications
  • 26/01677/FUL Awaiting decision

    4 Blackberry Close Great Barford Bedford Bedford MK44 3FY

    Insertion of 2 additional rooflights to existing 2nd floor and 2 windows to RH (North) elevation

    31 Aug 2026 Full applications