Skip to content
PlanIndex Get alerts
Menu

Planning application

6A New Road Bromham Bedford Bedfordshire MK43 8QQ

Granted Bedford 21/00595/FUL Full Planning

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Garage conversion and single storey side extension to the garage.

As published by the council, reference 21/00595/FUL

Application record

Reference
21/00595/FUL
Type
Full Planning
Status
Decided - Permitted
Decision
Grant Permission
Received
1 Mar 2021
Validated
2 Mar 2021
Decided
8 Jul 2021
Ward
Bromham
Parish
Bromham
Decision by
Officers (Delegated)
Postcode
MK43 8QQ

Timeline

Dates from the published record

  1. 1 Mar 2021

    Received by Bedford

  2. 2 Mar 2021

    Validated

    Checked as complete and ready for consideration.

  3. 8 Jul 2021

    Decision issued: Grant Permission

  4. 19 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

32 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 13 Lime Close Bromham Bedford Bedfordshire MK43 8HD

    26/01039/FUL Submitted 1 Jun 2026 72m away

    83% historically approved · decision due ~27 Jul

    Two storey side extension, single storey side extension and front bay window extensions

    Awaiting decision Full applications Extension Windows or glazing
    Small domestic
  • Land At Rear Of 120 Stagsden Road Bromham Bedford Bedfordshire MK43 8QJ

    24/01123/S73A Submitted 7 Jun 2024 110m away

    Change of use of part of domestic curtilage to extension of adjacent caravan site and associated works (development already carried out)

    Refused Amendments Extension 20 docs
  • 133 Stagsden Road Bromham Bedford Bedfordshire MK43 8QJ

    26/01544/FUL Submitted 10 Aug 2026 110m away

    83% historically approved · decision due ~5 Oct

    Single storey front, side and rear extensions, two storey rear extension with dormer following demolition of existing garage, workshop and conservatory

    Awaiting decision Full applications Extension Loft or dormer +1
    Small domestic
  • 94 Quenby Way Bromham Bedford Bedfordshire MK43 8QP

    26/00737/LDP Submitted 16 Apr 2026 167m away

    Certificate to confirm that the details submitted do not require planning permission (loft conversion/extension)

    Granted Lawful development Extension Loft or dormer 8 docs
  • Zennor 88 Stagsden Road Bromham Bedford Bedfordshire MK43 8PU

    24/01376/NMA Submitted 16 Jul 2024 326m away

    23/00912/FUL - Non-Material Minor amendment to change roof tiles.

    Granted Amendments Roofing 11 docs
  • 34 Berry Drive Bromham Bedford Bedfordshire MK43 8QA

    26/01552/FUL Submitted 12 Aug 2026 369m away

    83% historically approved · decision due ~7 Oct

    Erection of a two-storey side extension and a single-storey rear extension forming a wraparound extension.

    Awaiting decision Full applications Extension
    Small domestic

In Bedford

  • 26/01695/FUL Awaiting decision

    37 Green Lane Wixams Bedford Bedfordshire MK42 6DA

    Demolition of conservatory and erection of a single storey side extension.

    3 Sep 2026 Full applications
  • 26/01689/FUL Awaiting decision

    2 Cromwell Road Bedford Bedfordshire MK40 4LR

    Change of Use of first floor to residential flat, including attic conversion with rear dormer, enabling the creation of a live-work unit.

    2 Sep 2026 Full applications
  • 26/01681/FUL Awaiting decision

    33 - 35 St Peters Street Bedford Bedfordshire MK40 2PN

    Formation of a patient set-down and pick-up facility, ancillary to the existing dental use (Use Class E), within the rear curtilage; comprising partial demolition of the rear boundary wall to form a new vehicular access from the rear service lane, one accessible (disabled) transfer bay and one set-down space with associated hardstanding and drainage, boundary treatment, cycle and refuse storage, and an electric vehicle charging point.

    1 Sep 2026 Full applications
  • 26/01684/FUL Awaiting decision

    4 Miller Close Clapham Bedford Bedfordshire MK41 6GN

    Roof to be raised with addition of rear box dormer to allow loft conversion

    1 Sep 2026 Full applications
  • 26/01677/FUL Awaiting decision

    4 Blackberry Close Great Barford Bedford Bedford MK44 3FY

    Insertion of 2 additional rooflights to existing 2nd floor and 2 windows to RH (North) elevation

    31 Aug 2026 Full applications